08/0200 - Operational Works - Landscaping, Caparking & Access, Frontage Works, Stormwater Drainage, Site Civil Works & Erosion & Sediment Control [As Published] · 142008.200
Development & Land Use Sections
/
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
IDAS APPLICATION
DEES ae
14 Form1PatA
1.1.1 Ensure that the form is fully completed. |
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 if there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the fand is a company, either ACN No. or Company Seal required.
1.2. Form Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [VY] :
1.1.2.1 Ensure that each of Forms B-O which are attached are fully completed.
papa ne Ce
2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals.
BEST ENVIRONME! EI 3) ay
3.1. Ensure that Part G is completed if EPA referral is required.
3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
Ensure that items 1- 28 have been ‘checked and/or lies ee information regarding
applicant details and owners consent.
Works) accompanies the application. In addition ensure that each set is complete.
§.1 Ensure that at least 6 sets of the Plan. of oerccenent eo for Reconfiguration and Operational | L
Y
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and.is
unbound.
and Operational Works). {f the application is accompanied by a covering letter, ensure that it is
capable of reproduction. [=]
6.2 In the case of reports, ensure that 1 of the copies is in an 1 A3 or A4 format and is unbound.
7.1 Ensure that the fe application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.
7.2. Ensure that the fee which has been paid is recorded on the application form.
Receiving Officer
Having completed this form and accepted the application, please deliver both to the following IDAS Application Receiving
trays:-
« — {f the application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.
« ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.
¢ if the application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.
« Inall other circumstances — AOP1’s desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEP! g:\ant\forms\application checklist.doc
-MNEOLO NY We Checklist--Applications_Involving-Land——_--_——__
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0200 - Operational Works - Landscaping, Caparking & Access, Frontage Works, Stormwater Drainage, Site Civil Works & Erosion & Sediment Control [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.