Council archive · source document
08/0200 - Operational Works - Landscaping, Caparking & Access, Frontage Works, Stormwater Drainage, Site Civil Works & Erosion & Sediment Control [As Published] · 142008.200
JNTEGRATED.PLANNING ACT_1997 IDAS Assesament Checkfist, Version 21.0, 3 September 2007
46 Is any of the proposed operational work to allow, under the Wafer Act 2000, for taking overland flow water?
No
(1 Yes - Answer (a) and (b) below
eda
IPA, schedule 8. part 1, fable 4, item 3(c}()
IP Regulation, schedule 2, table 2, item 8
IP Regulation, schedule 1, part 3, table 4, item 3
Water Act 2000, section 966A (wild river area)
Wild Rivers Act 2005, section 434
47 \s any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?
[x] No
LD Yes
IPA, schedule 8, part 1, table 4, tem (chi)
IP Regulation, schedule 2, table 2, item 8
IP Regulation, schedule 1, part 3, table 4, item 3
Water Act 2000, section 966A (wid river area)(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Note: the code dees not currently contain applicable provisions for sub artesian water)
48 Is any of the proposed operational work to allow, under the Wafer Act 2000, for interfering with overland flow water?
No
@ (1 Yes - Answer both (a) and (b) below
IPA, schedule 8, part 1, table 4, items 3{c}{j) and 3{d}
IP Regulation, schedule 2, table 2, item 9
IP Regulation, schedule 1, part 3, table 4, item 3A
Water Act 2000, section 9668 {wild river area)
49 |s the proposed operational work for the following?
e For the construction of a referable dam as defined under the Water Act 2000 O No UD Yes
© To increase the storage capacity of a referable dam by more than 10% 0 No 0 Yes
if yes to elther or both - (Complete Part Ks) This application requires assessment by the Department of Natural Resources and Water (NRW).
if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, item 4
IP Regulation, schedule 2, table 2, item 10
(TIDAL WORK; WILD RIVER AREA
4.10 ls any of the proposed operational work tidal werk, other than excluded work defined under the IPA?
e .
(C1 Yes - Answer (a) and (b) befow
IPA, schedule 8, part f, table 4, tem5
IP Regulation, schedule 2, table 2, tens 12, 14 end 17
iP Regulation, schedule 1, part 3, table 4, items 4A and 5
Coastal Protection and Management Act 1995, section 104A (wild river area)
ICOASTAL MANAGEMENT DISTRICT; WILD RIVER AREA |
44 {s any of the operational work proposed to be carried out within a coastal management district?
No
LJ Yes
IPA, schedule 8, part 1, table 4, item 5
IP Regulation, schedule 2, table 2, items 12 and 14
IP Regulation, schedule 1, part 3, table 4, tems 4A and 5
Coastal Protection and Management Act 1995 Act 1995, section 104A (wild river area)
Wild Rivers Act 2005, section 43A
WATERWAY BARRIER WORKS; WILD RIVER AREA |
4.12 \s any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
No
C Yes
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0200 - Operational Works - Landscaping, Caparking & Access, Frontage Works, Stormwater Drainage, Site Civil Works & Erosion & Sediment Control [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.