Skip to the record
The gold standard in government transparency.

Council archive · source document

08/0200 - Operational Works - Landscaping, Caparking & Access, Frontage Works, Stormwater Drainage, Site Civil Works & Erosion & Sediment Control [As Published] · 142008.200

of 26

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

ty
y

 

INTEGRATED. PLANNING. ACT1997. IDAS Assesament Checklist, Version 21.0, 3 September 2007

IPA, schedule 8, part 1, table 4, item 6

IPA, schedule 8, part 2, table 4, item 2

IP Reguiation, schedule 2, table 2, item 28

IP Regulation, schedule 1, part 3, table 4, tem 6
Fisheries Act 1994, section 76D (wild river area)
Wild Rivers Act 2005, section 43A

 

DECLARED FISH HABITAT AREA; WILD RIVER AREA

413 Is any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?

No
C1 Yes

IPA, schedule 8, part 1, table 4, item 7

IPA, schedule 8, part 2, table 4, tem 3

IP Regulation, schedule 2, table 2, item 25

IP Regulation, schedule 1, part 3, table 4, item 7
Wild Rivers Act 2005, sections 43A

Fisheries Act, section 760C (wild river area)

 

IREMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER [email protected] Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?

1 No
C1 Yes

IPA, schedule 8, part 1, table 4, item 8

IPA, schedule 8, part 2, table 4, item 4

IP Regulation, schedule 2, table 2, item 29

IP Regutation, schedule t, part 3, table 4, item 8
Fisheries Act 1994, section 76DA (wild river area)
Wild Rivers Act 2005, section 43A

 

 

[WILD RIVER AREA J}
4.15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?

><] No

CI] Yes

IPA, schedule 8, part 1, table 4, item 10
IP Regulation, schedule 2, fable 2, Kem 37
Wild Rivers Act 2005, sections 42, 43A

 

 

[STATE-CONTROLLED ROAD |
e 4.16 ts any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?
No
( Yes

IP Regutation, schedule 2, table 2, item 3

 

Disclaimer:

While the Department of Local Goverment, Planning, Sport and Recreation (DLGPSR) believes that this information contained on this
form and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the information
without first making your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances.

To the full extent permitted by law DLGPSR expressly disclaims all liability (including but not limited to liability for negligence) for errors
or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form

 

 

 

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0200 - Operational Works - Landscaping, Caparking & Access, Frontage Works, Stormwater Drainage, Site Civil Works & Erosion & Sediment Control [As Publis.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.