Council archive · source document
08/0200 - Operational Works - Landscaping, Caparking & Access, Frontage Works, Stormwater Drainage, Site Civil Works & Erosion & Sediment Control [As Published] · 142008.200
+
CL SPRAYED RC FACING TO
{UPPER SLOPE” TO” STABILISE
|
|
|
EMBANKMENT, REFER DETAIL.
5 50
titi t
332259".
1.589
ee LTTE LT |
PliTI tl
[ffl
L Pigs Sy zt yy
Revision
Description Date
NO. ANCHORING-INTO:
NEIGHBOURING ALLOTMENTS,
BLOCK RETAINING WALL, REFER DETAIL.
42°58'20"
40.730
_ RP BOUNDARY
/
SLT—
EIALL LALLA
i|
!
S
SATURATE GROUND ADJACENT
EXCAVATION FOR A MINIMUM OF
24 HOURS PRIGR TO WORKS
COMMENCING,
THIS FOOTING (S FOUNDED GELOW CRITICAL:
DEPTH UNE AND IS STABLE,
PIERS OR UNDERPINNING FOUNDED BELOW THE
CRINCAL DEPTH LINE WOULD BE NEEDED 10
‘SUPPORT ANY FOOTING THAT IS FOUNDED
AGOVE THE CRITICAL DEPTH UNE.
CRITICAL_DEPTH LINE
‘CONCRETE FACING
/- S172 MESH MIDOLE
|
{
|
a + oni TRENCH,
'
vos
ope ,
“oe
hb’ sy fos
Nf fle Z Ze
4 . 4
REFERHYDRAUUCS/” 7” |.”
CONSULTANTS DOCUMENTATION’
FOR SITE DRANAGE DETAILS |
“Lf
Sof ft 4 fie
4 4 4 4
oof 4 4
“_AEXBING
DEMOMSHED # REMOVED,“
Co% 4 4 yoo4
y 7
“ 4 4 4 4
4 4 Z 4 y
house to BE”
YD)
4
{ENSTING STRUCTURE /OWELLING INCLUDING
NEIGHBOURING ALLOTMENTS
THE BUILDER /CONTRACTOR SHALL
CONFIRM ALL RELEVANT LEVELS
PRIOR TO COMMENCING WORKS.
THIS FOOTING WITHOUT PIERS IS FOUNDED:
‘ABOVE CRITICAL OEPTH UNE AND IS UNSTABLE.
UNE OF PROPOSED EXCAVATION EXCAVATION OR
NOTE:
THS DETAIL ALSO APPLES TO EXISTING
FOUNDATIONS ON NEIGHBOURING PROPERTIES.
SHEET PILING MUST BE INSTALLED WHERE
EASTING FOOTINGS WILL BE FOUNDED ABOVE
ANY EXCAVATION CRITICAL DEPTH UNE
4500 RC PIERS 6/NI6
FULL HT R8 SPIRAL 300
PITCH, SO COVER
IZ 400 centre,
fy ‘Longthaing
Pe rearcerent N12 0
; cro
SAE2 Mesh top 40
cover,
{
t 4 Z 4 s Z 7 Z ,
Bei 8 OS ig! “ys
S | pun ML pecs nnnncn nen nncmnnensrrrnnreg
BU et POEL IMLS ELEN
*| a: vv on ' / mo /|\ :
7 if ee een pence ene tenemos ‘eat — . ¢ (i
ITITTTTTT TT be at o . CREATE BUNOING IN
| | o te aA 1 TEMPORARY HARDSTAND) /
[en ey all “tt ut! LI) Eee" /
2g
GIT TT IT TTT tpt t+ t eer - STN ~ Spe pounoary 40538 (Ny - - > re
BLOCK RETAINING WALL, REFER DETAIL es 1,
AUGERED CONCRETE PILE WALL AND ANCHORED OPERATIONAL WORKS PLAN 4
CAPPING BEAM FOR SOWL RETAENTION, REFER Seale 1: 100
SECTION FOR DETALS, wc caren aca
a FULL LGTH OF WALL ROWE wnat
AONTS AT 6.0m CTRS.
SPRAYED 25NPo 900(W) GEO-FABRIC SILT
FENCE, FIXED TO SPIKES
AND BURIED 300 INTO
‘STABLE “GROUND.
1200(L) 50 Sq. HOWD
SPIKES, 1800 ctrs DRIVE
600 INTO GROUND.
i
SILT RENTENTION: FENCE DETAIL
Noturol Ground j
‘SILT RETENTION.
THE CONTRACTOR iS TO INSTALL APPROVED SLT RETENTION
1490
BSR RIC
2
i
5
:
z
OF SURFACE BUNDING OR SCOUR PROTECTED
THE FENCE MUST REMAIN IN PLACE UNTIL SUCH
B - Bose Width
10mm Joint, mastic. Besser control
(A if wall rendered, rt blocks.
Vertical bars, (size on
pln) in grout filed "tt
both sides of joint.
MOVEMENT JOINT DETAIL,
TYPICAL SECTION ~ RETAINING WALL
THAT FINISHED LANDSCAPING AND DRAINAGE MEASURES,
ONSTALED 5
LEGEND
LEVEL TO AHD.
zt
SILT RETENTION FENCE. TO DETAIL
i .
{fm INDICATES PROPOSED FINISHED SPOT
SURFACE LEVELS TO AHD..
%
< i
+” EXISTING SURFACE SPOT LEVELS.
{
CONTOUR AND
su
ORIVEWAY CROSS OVER DETAILS}
TO BE IN ACCORDANCE WITH
NOOSA SHIRE COUNCIL'S $ID
ORAWNGS 9005 & 9019.
20-40mm AGGREGATE
HARD STAND OVERLAY
FOR DEUVERY'S OURING
CONSTRUCTION,
EXISTING DRIVE WAY TO BE REMOVED.
NEW KERB AND CHANNELLING 10 8E
REINSTATED TO NOOSA SHIRE COUNCIL|
REQUIREMENTS,
CONSTRUCTION NOTES.
GENERAL:
4. Do nat sede from this drawing.
2. A dimensions in milimetres
3. Setting cut dimensions ore to be obtained from the archi
drawings.
4. Any discreponcies between these drawing and the architectural drawings
are to be retored to the engheer immediately
5. The builder is respotsibe for locating ofl existing services within ond
adjocent the allotment and shall ensure that aif new works ore in
accordance with the attached critied depth fine diagram,
FOOTPATHS AND DRIVEWAYS:
1, Existing foatpaths to be saw cut prior to removal
2. Crossings are mot designed for commerciol vehicles
3. Concrete driveway to be 125mm thk. excluding any finished treatments,
69. stomping
4. Concrete surface tolerance +5.0rmm_over 3.0m
5. Conarete N25 in occordonce with AS 1379 ond AS 3600
8. Reinforcement fabric to AS 1304, placed central ob depth,
7, Expansion jpints to be 10mm wide wet tooled vith every 2nd mesh wire
cut dong joint,
8. One access point permitted for each afotment
ture
9. For curved driveways, maxenum grades apply to inside edge of curve
10, All services to be located and protected ax required prior to work
SCG enema NS ENGINEERS
ABN 40 098 481 899
©
'ssue: TENDER ~ NOT FOR CONST.
18 DUKE STREET SUNSHINE SEACH QLD.4567
DESMO TK
Ph (07) 5447 5544 Fax (07)5447 2634
Title: OPERATIONAL WORKS & DRAINAGE.
Project 15 Duke Street,
Sunshine Beach QLD 4567
Date: Jan 2008 Drg No. 17273-OW1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0200 - Operational Works - Landscaping, Caparking & Access, Frontage Works, Stormwater Drainage, Site Civil Works & Erosion & Sediment Control [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.