08/0200 - Operational Works - Landscaping, Caparking & Access, Frontage Works, Stormwater Drainage, Site Civil Works & Erosion & Sediment Control [As Published] · 142008.200
=a
fs
rl
I
T1398
@:
|
WI
——
HLTH
dani
peel yp
--——-——
: jas
REFER HYDRAULICS *
CONSULTANTS DOCUMENTATION} > — - —— -
FOR SITE DRAINAGE DETAILS
ii iiiltl
4 /
iil
| 0 ra
/
hel
HEEL a
PLE
Fae
VISITO
FRevistor| i mt Date
4 48 46 4 rm 42°3820" : 43 HT
af Les wifi i - } iY fey : ae 4 , . 40730 RP BOUNDARY a ag tT]
ald [| Ore Aff OO “]
oO IIL caeoer OF fe 77 ( |
PTET EG ST Foy
GROSS eau
ORIVEWAY CROSS OVER DETAIL!
JO BE IN ACCORDANCE WITH
NOOSA SHIRE COUNCIL'S STD
DRAWINGS 9005 & 9019,
EXISTING DRIVE WAY TO BE REMOVED.
NEW KERB AND CHANNELUNG TO BE
REINSTATED TO NOOSA SHIRE COUNCIL
REQUIREMENTS
~ LAY_BACK KERB & CHANNEL
4a
\ TRAP 10 HYDRAULIC)
[flit iiepiel PARKIN me ora nthe
- - = = - ~ a - - _ ~ - - J -. = - GENERAL:
{ he LT TTTT Tt |- a I Ir t | 40.535 ~~ 1, Do not scale from this dosing
O80 4g 48 . “4 RP BOUNDARY ‘pean 43 ; 2. AN dimensions fv ilfetres
. : 125 Thick ~™ 4. Setting cut dimensions are to be abtoined from the architectural drawings.
* PARK WAY PLA . driveway sab. PROVIDE KERB ADAPTOR ‘ ey Geogr be the og ad te ecard drain
t to be ref mi
Scale 1: 100 B WALL WIDTH DIMENSION (m) TONS. SPEGRICATION 2 Tae eae ts mening feng erveea stn on alo
0 1 2 3 35 - 4 tha aotment and shot! engura that of new works ore in occondence wih the |
Y ‘ attached critica depth line diagrom,
IF THE SLOPE IS ~ 1 FOOTPATHS AND DRIVEWAYS:
GREATER THAN 10:1 p Cut every 2nd 1. Existing footpaths to be sow cut prior to removd
SEE NOTE 2. wire along line 2. Crossings are not designed for commercial vehicles
Ground Level of pint, a Concrete drivency to be 125mm thk. exchiding ary fished treatments, eg.
[— Tu) TOOLED JOINT DETAI ‘Cotte ssc lene 450m, oe” 0
5, Concrete N25 in accordance with AS 1379 and AS. 3600
. a 6, Reinforcement fabric to AS 1304, placed central stab depth.
€& Grated ‘ 7. Exponsion joints to be 10mm wide wet tooled xith every 2nd mesh wire cut
= ; along joint
Kb ain [9 Is 8 fe IR 3 fa. & One access point permitted for eoch olotment.
= g st BY gi sl ¢ 8 t 9, For carved driveways, maximum grades apply to inside edge of curve
1 Ss | } 10. All services to be located and protected 3 required prior to work
@ i | cavetenng
t | ¥
\lA z = = d ‘LEGEND
= “ ~ ee = : a i _ = 777 INDICATES EXISTING SURFACE
; x. 2 i 19.09 CONTOUR AND LEVEL TO AHD.
x= E 3 fq ~—s INDICATES PROPOSED FINISHED SPOT
ROCK SIZE REFER a g SURFACE LEVELS TO AHD.
Kk To NOTES. | te fm) (25 TAK. DRIVEWAY SLAB ON
an t Crossover Detod Abgve COMPACTED MATERIAL, SL82 MESH, TOP
WALL’ DESIGN CHART ana | 40 COVER, FLEXIBLE JOINT AGAINST
FINISHED GL Rt 32.00 I \. MASONRY /CONCRE TE.
" wore: DRIVE WAY LONGITUDINAL SECTION toy bast Kee Tul DENOTES WET TOOLED JOINT TO TERRACE
‘oundation to be approved for a safe bearing copacity of ———e—eE—eE—E—E—E—e—=E—E— ‘an | SLAB, REFER T T N WING $2
100 kPa prior to construct a EXISTING. MATCH EXISTING . , stoners LAB, REFER TO DETALS ON DRA ‘Ty
. 2. Where the surface slope ined material is between 101 3 CROSS FALL CROSS FALL 4 I ~
(| & 4:1 the wall base dimension is to be increased by 0:5 q nate 8 150 Ssue: TENDER ~ NOT FOR CONST.
meters. ; I
— . | 3. Rock is to be sound and durable and ot least 0.5 square | r | Extend CONSULTING ENGINEERS ¢
. : metres in plan area; b SCG = Pitt « ‘i
200mm FREE ORAINING 4, Bock fill is to be granular, free draining and compacted ond bel SE sirwciral cil geateciecal
BACKFILL WITH GEO FABRIC 100 KEYED INTO ROCK @ minimum of 300mm wide; . é Z back of
WRAPPING AG PIPE 450 KEYED INTO SOIL 5. A continuous 100mm diameter subsoil droin wrapped in determined on=site. kerb. 18 DUKE STREET SUNSHINE BEACH QLD.4567 -
TO cPTs. B geotextile is to be installed at the rear of the wall; Saw cut ond 4 * Cempocted Ph (07) 5447 5544 Fax (07) 5447 2634
— 6, Rocks shall be placed in such o manner that they are stoble breakout BARREER, SEMT-MOUNTABLE, MOUNTABLE snd bed PAVEMENT WATERIALS Sudgrade
and interlocking & laid roughly coursed ond embedded on’ their Dock of erp KERB 4 CHARMEL OR VERT CROSSE Bsa Asphalic Surfacing to NSC specications PRI. =| Title. §—s CAR PARKING & DRIVE WAY PLAN
150 THK C20 broadest base, , . | ; . / 150 Bose course type 21 CBR 80 rel er gener
CONCRETE. BED BASE. 7. Where the width nominated is made up with o series of CROSSOVER DETAI 150 Sub-bose course type 2.5 CBR 45 /, Project 15 Duke Street,
. . rocks, rocks should be concrete routed together to ensure (Sedte 1:20) ‘Sub-grade preperation in accordance with specifications /notes Sunshine Beach QLD 4567
5 ; intertocking can occur. .
‘ TYPICAL ROCK WALL GEOMETRY , $
Date: Jan 2008 Drg No, 17273-OW2
\
}
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0200 - Operational Works - Landscaping, Caparking & Access, Frontage Works, Stormwater Drainage, Site Civil Works & Erosion & Sediment Control [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.