Minor Change Existing Approval 132000 200173.1
*(Refer to Advisory Note)
Fauna Management
18. Prior to felling or pruning, all trees are to be checked for wildlife (i.e. koalas, possums, birds
etc.) If wildlife is present, the tree vegetation must not be felled or pruned until the wildlife
has left vegetation or has been relocated by a qualified fauna spotter catcher.
*(Refer to Advisory Note)
Removal of Existing Trees and Vegetation
19. Removal of existing trees and vegetation must be undertaken by a qualified person* and
must include:
a. Legal disposal of all removed vegetation and debris.
*(Refer to Advisory Note)
Site Access and Driveways
20. A sealed access driveway must be provided from The Esplande to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
an Operational Works approval, be generally in accordance with Westera Partners’
Stormwater Management Plan (S22-174-SW01) and Stormwater Typical Details (S22-174-
SW02) dated January 2023, and must be site to:
a. Minimise impacts on Council’s road reserve (i.e., earthworks, vegetation removal); and
b. Maximise separation from the Arakoon-Esplande intersection.
Stormwater Drainage
21. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with Westera Partners’
Stormwater Management Plan (S22-174-SW01) and Stormwater Typical Details (S22-174-
SW02) dated January 2023 and endorsed through the building permit.
22. Stormwater runoff disposed of on-site must be done so without causing scour or damage to
the subject site or any adjoining property.
Easements
23. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
24. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
25. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
26. All works must be carried out in accordance with the recommendations contained in
Tectonic’s Geotechnical Investigation (22484-001-Rev0) dated 24 February 2023.
The report must be revised to address recommendations for the Coastal Hazard Assessment
by Haskoning Australia Pty Ltd dated 15 March 2024 to ensure the proposal will not be
impacted upon by Coastal Hazard.
27. A footing system and erosion protection system must be designed for the proposed
development to withstand the short-term erosion associated with a 500-year average
recurrence interval storm event combined with shoreline recession due to sea-level rise for
2100 climate change.
Page 4 of 20
Document Set ID: 23086532
Version: 3, Version Date: 02/07/2024