                      a.      The short-term erosion associated with a 500-year average recurrence interval storm
                              event combined with shoreline recession due to sea-level rise for 2100 climate change
                              to be considered for the design as per the recommendations of the Royal Haskoing
                              DHV report Coastal Hazards Assessment by Royal Haskoning DHV dated 13 February
                              2023.
                      b.      The footing system and erosion protection system must in accordance with the works
                              detailed in the Tectonic report Geotechnical Investigation dated 24 February 2023 and
                              other supporting documents referenced in the Tectonic report.
                      c.      The design must include the protection of the northern and southern boundaries of the
                              site to prevent erosion on neighbouring properties exposing the side boundaries of the
                              site to erosion.
                      d.      The design must be accompanied by certification by a Registered Professional
                              Engineer of Queensland (RPEQ) specialising in geotechnical engineering that the
                              design is satisfactory and will provide a long-term factor of safety concerning slope
                              stability of no less than 1.5.
               28.    Following construction, certification must be supplied to Council by an RPEQ specialising in
                      geotechnical engineering that the works have been constructed in accordance with the
                      approved design.
               29.    A dilapidation survey shall be carried out of all adjacent properties and structures before the
                      commencement of construction of the proposed development on the site.
               30.    Due to the risk of instability on the existing dune slope and the potential for settlement of
                      loose sand on the adjacent properties, vibrations must be kept to a minimum and must be
                      monitored during the construction of the development. Driven piles (both sheet piles and pile
                      footings) are not permitted on the site.
               31.    Landscaping at the rear of the property and the crest of the existing dune slope shall be
                      limited to a maximum surcharge of 5kPa unless a site-specific slope stability analysis is
                      carried out to demonstrate that higher loads are acceptable.
               32.    Under no circumstances shall building materials be temporarily stockpiled in the area of the
                      crest of the existing dune slope or on the slope.
               33.    Discharge of concentrated stormwater flows onto the dune slope must be avoided, and under
                      no circumstances will subsurface disposal of water be permitted using infiltration pits.
               34.    Stormwater runoff from gutters, down-pipes, driveways, and paved areas must be collected
                      and directed by pipes into the Council stormwater system along Seaview Terrace.
               35.    The existing dune slope and any areas disturbed by the construction of the proposed
                      development shall be revegetated as soon as possible to reduce the potential for erosion.
                      Earthworks and Retaining Walls
               36.    All earthworks must be carried out in accordance with the letter by Westera Partners dated
                      31 Oct 2023 and accompanying plans.
               37.    All earthworks and associated retaining structures/batters, both above and below ground,
                      both temporary and permanent, must be contained entirely within the subject site unless
                      written permission form the respective landowner(s) is provided to Council. All earthworks
                      must be undertaken in accordance with the provisions of Australian Standard AS3798:
                      Guidelines on Earthworks for Commercial and Residential Developments.
               38.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.




                                                                                                       Page 5 of 20
Document Set ID: 23086532
Version: 3, Version Date: 02/07/2024
Log in to download the original file

Minor Change Existing Approval 132000 200173.1.pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.