Skip to the record
Accept no substitutions.

Original source · versioned page text

Minor Change Existing Approval 132000 200173.1

of 20

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                      Damage to Services and Assets
               39.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
                      Coastal Protection
               40.    Any rear fencing adjacent to the beachfront must not exceed 1.2 metres in height, be of open
                      construction, constructed of light weight materials (e.g. timber) and be dark in colour to blend
                      with the natural landscape.
               41.    Gates must not be installed along the eastern property boundary to gain direct access to the
                      beachfront.
               42. External colours and finishes must be of muted/environmental tones that blend with the
                   natural environment and low-reflective roofing and cladding materials.
               5.     REFERENCE DOCUMENTS

                      Document/Plan      Rev.         Document Name                            Date
                      No.

                      PA3303             S0/P01.01 Coastal     Hazard    Assessment 15 March 2024
                                                   prepared by Haskoning Australia Pty
                                                   Ltd

                      2248-001           0            Geotechnical Investigation prepared 24 February 2023
                                                      by    Tectonic   Geotechnical     &
                                                      Environmental Engineers

                      SS22-003           1            Stormwater Management Report 30 October 2023
                                                      prepared by Westera Partners

                      S22-174-SW01       -            Stormwater    Management          Plan January 2023
                                                      prepared by Westera Partners

                      S22-174-SW02       -            Stormwater Typical Details prepared January 2023
                                                      by Westera Partners

                      -                  2            Arboricultural Impact Assessment, 22/02/2023
                                                      prepared by, Consult Arborist




                                                                                                       Page 6 of 20
Document Set ID: 23086532
Version: 3, Version Date: 02/07/2024
Log in to download the original file

Minor Change Existing Approval 132000 200173.1.pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.