Decision Notice - 010.2008.00000425.001 [As Published] · 142008.425
-3-
If any Council property or facilities should be damaged by the Applicant or any of its
Consultants or Contractors through any cause whatsoever in the course of, directly or
indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
forthwith notify the Manager Land Development and shall forthwith rectify the damage to that
property or facility at its cost and to the satisfaction of the Manager Land Development.
All rectification works are to be completed prior to the sealing of the survey plan or,
alternatively, the Applicant may request the Council to carry out the rectification work at the
Applicant’s cost, such cost being paid by the Applicant to the Council prior to the sealing of the
survey plan.
In the case of any emergency the Council shall be entitled to rectify such damage at the cost
of the Applicant, such cost being paid prior to the sealing of the survey plan.
14. The development of the site shall be carried out in such a manner as to prevent dust and/or
sand nuisance to residents and/or tenants in the vicinity of the development.
15. Construction work and other associated activities are permitted only during the hours of 7.00
am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays
except where extended hours are approved by the Manager, Land Development, or his
nominee.
16. All signage, including that for safety during construction shall be in accordance with the
Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
17. A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
be imposed on construction works during the maintenance period, which is a minimum period
of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
Developer for the works.
18. The works to become Council assets will not be accepted "On Maintenance" until the
landscaping is completed.
19. These works are also to be in compliance with the relevant conditions of Development Permit
No. 2006/1594.
20. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations from Council's standards exist, then Council standards shall apply.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Not Applicable.
6 APPROVED PLANS
The approved plans and for this development approval are listed in the following table:
Plan No. Rev. Plan Name Date
LA01 A Feb 2008
Site Plan: Land Graphics
LA02 A Feb 2008
Landscape Part Plan 1: Land Graphics
LA03 A Feb 2008
Landscape Part Plan 2: Land Graphics
LA04 A Feb 2008
Landscape Part Plan 3: Land Graphics
LA05 A Feb 2008
Landscape Part Plan 4: Land Graphics
Page 3 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000425.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 55 KB (small file)
- File type
No other editions are linked here.