Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

DA Form 1

of 12

Page text shows just the words. Original shows the document exactly as it was published.

 9.1) What is the total number of existing lots making up the premises?


 9.2) What is the nature of the lot reconfiguration? (tick all applicable boxes)
     Subdivision (complete 10))                                          Dividing land into parts by agreement (complete 11))
     Boundary realignment (complete 12))                                 Creating or changing an easement giving access to a lot
                                                                         from a construction road (complete 13))

 10) Subdivision
 10.1) For this development, how many lots are being created and what is the intended use of those lots:
 Intended use of lots created               Residential              Commercial              Industrial              Other, please specify:


 Number of lots created
 10.2) Will the subdivision be staged?
     Yes – provide additional details below
     No
 How many stages will the works include?
 What stage(s) will this development application
 apply to?

 11) Dividing land into parts by agreement – how many parts are being created and what is the intended use of the
 parts?
 Intended use of parts created              Residential              Commercial              Industrial              Other, please specify:


 Number of parts created

 12) Boundary realignment
 12.1) What are the current and proposed areas for each lot comprising the premises?
                                   Current lot                                                                Proposed lot
 Lot on plan description                     Area (m2)                               Lot on plan description                 Area (m2)



 12.2) What is the reason for the boundary realignment?



 13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
 (attach schedule if there are more than two easements)
 Existing or              Width (m)         Length (m)        Purpose of the easement? (e.g.                     Identify the land/lot(s)
 proposed?                                                    pedestrian access)                                 benefitted by the easement




Division 3 – Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
 14.1) What is the nature of the operational work?
     Road work                                                Stormwater                             Water infrastructure
     Drainage work                                            Earthworks                             Sewage infrastructure
     Landscaping                                              Signage                                Clearing vegetation
     Other – please specify:

                                                                                                                                             Page 5
                                                                                                          DA Form 1 – Development Application details
                                                                                                                        Version 1.1— 22 JUNE 2018
Log in to download the original file

DA Form 1.pdf · 151 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.