Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

DA Form 1

of 12

Page text shows just the words. Original shows the document exactly as it was published.

14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
    Yes – specify number of new lots:
    No
14.3) What is the monetary value of the proposed operational work? (include GST, materials and labour)



PART 4 – ASSESSMENT MANAGER DETAILS
15) Identify the assessment manager(s) who will be assessing this development application
Noosa Council
16) Has the local government agreed to apply a superseded planning scheme for this development application?
    Yes – a copy of the decision notice is attached to this development application
    Local government is taken to have agreed to the superseded planning scheme request – relevant documents
attached
    No


PART 5 – REFERRAL DETAILS
17) Do any aspects of the proposed development require referral for any referral requirements?
Note: A development application will require referral if prescribed by the Planning Regulation 2017.
   No, there are no referral requirements relevant to any development aspects identified in this development
application – proceed to Part 6
Matters requiring referral to the Chief Executive of the Planning Regulation 2017:
   Clearing native vegetation
   Contaminated land (unexploded ordnance)
   Environmentally relevant activities (ERA) (only if the ERA have not been devolved to a local government)
   Fisheries – aquaculture
   Fisheries – declared fish habitat area
   Fisheries – marine plants
   Fisheries – waterway barrier works
   Hazardous chemical facilities
   Queensland heritage place (on or near a Queensland heritage place)
   Infrastructure – designated premises
   Infrastructure – state transport infrastructure
   Infrastructure – state transport corridors and future state transport corridors
   Infrastructure – state-controlled transport tunnels and future state-controlled transport tunnels
   Infrastructure – near a state-controlled road intersection
   On Brisbane core port land near a State transport corridor or future State transport corridor
   On Brisbane core port land – ERA
   On Brisbane core port land – tidal works or work in a coastal management district
   On Brisbane core port land – hazardous chemical facility
   On Brisbane core port land – taking or interfering with water
   On Brisbane core port land – referable dams
   On Brisbane core port land - fisheries
   Land within Port of Brisbane’s port limits
   SEQ development area
   SEQ regional landscape and rural production area or SEQ rural living area – tourist activity or sport and
recreation activity



                                                                                                                                          Page 6
                                                                                                       DA Form 1 – Development Application details
                                                                                                                     Version 1.1— 22 JUNE 2018
Log in to download the original file

DA Form 1.pdf · 151 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.