Council archive · source document
07/1017 - Response to Info Request [As Published] · 142007.1017
2x AUSbb
4x DIAcae
4x MACluc
1x DORexc
2 medium & 1
small bush rock
as scheduled
2x AUSbb
3x VIOhed
4th FLOOR PLANTING PLAN
Scale 1:100
PLANT SCHEDULE -
CODE SCIENTIFIC NAME COMMON NAME SIZE Qty
Shrubs
ALParu = Alpinia arundelliana Dwarf Ginger 200mm 7
AUSbb — Austromyrtus ‘Blushing Beauty’ Blushing Beauty 200mm 4
CORmb Cordyline rubra ‘Red Red Palm Lily 200mm 4
DORexc Doryanthus excelsa Gymea Lily 300mm 2
LINmon __Linospadix monostachya Walking Stick Palm 300mm 17
MACluc Macrozamia lucida Pineapple Zamia 300mm 2
XANjoh = Xanthorrhoea johnsonii Grass Tree <300 trunk 1
Tussocks & Ground Covers
ANigem Anigozanthus ‘Bush Gem’ Bush Glow Kangaroo Paw 140mm 6
PANjas = Pandorea jasminoides Pink Bower of Beauty 140mm 3
DiAbre _—— Dianella brevipedunculata Flax Lily 140mm 4
{SOnod /solepsis nodosa Knobby Club Rush 140mm 2
ViOhed Viola hederacea Native Violet 140mm 47
1x MAClud in
timber pot as
detailed
1 medium & 2
small bush rock
as scheduled
6x ANigem
1x PAnjas
2x CORrub
1 °
Anjas
2 medium &3
small bush rock
as scheduled
3rd FLOOR PLANTING PLAN Scale 1:100
SPECIFICATION
EXTENT OF WORKS
Contractor should take full account of documentation of Civil Engineering, Hydraulic and. Electrical Engineering Works. Landscape works are
to include the following:
EXCAVATION AND DRAINAGE
Break up and remave any excess concrete slurry from construction works to achieve required planting depths. Excavate site soft to a depth of
100mm. Break up remaining subgrade to a depth of 100mm. Drainage is to be incorporated to all planting areas that are enclosed by hard
edging and not otherwise drained. Contractor should allow for overland gravel drains through mulched areas to stormwater catchment pits.
IRRIGATION
Irrigation for the project shall be carried out by an experienced and reputable irrigation contractor - Tenderers intending to handle the irrigation
themselves will be required to demonstrate proficiency in this area. Submit an irrigation plan to the site supervisor for approval prior to
installation. A fully automated and programmable irrigation system, with rainswitch, is to be provided to all Garden areas. All fittings are to be
fully effective and inconspicuously placed with lines placed through conduits under hard surfaces. Water connection points will be the water
tanks at the rear of each lot. The system should provide requiated application to all areas with no overspray or runoff onto hard surfaces.
Irrigation systems are to be guaranteed for a period of 12 months against faulty materials and workmanship.
TOPSOIL - SUPPLY AND INCORPORATION
Planting areas are to. be progressively filled with premium grade blended organic garden soa mix to. a minimum of 400mm depth. Soi to be an
approved garden organic mix. Soil supplier as well as intended mix is to be nominated. Soil is to be mounded to facittate good drainage to
hardstand areas (max 1:3 grade) and is to finish 50mm below edging after settlement. Organic additive such as ‘Dynamic Lifter’ is to be
incorporated throughout the soil mix at the recommended rate. A slow release fertiliser ‘Osmocote' or equivalent is also to be incorporated
with individual plantings in accordance with the manufacturers recommendations,
EDGING
Provide an extruded concrete edge to all garden beds where adjacent to grass areas. Line of edging to be set out and approved on site prior
to construction.
SHAPING OF GARDEN AREAS
Planting areas are to be finished in a gently mounded fashion to facilitate drainage of excess water and ta show planting to best advantage.
Contractor is to seek confirmation of finished levels prior to final plantings and application of mulch.
CONTAINERISED PLANT MATERIAL
Plant material is to be appraved by superintendent prior to planting. Planting is to be carried out in a manner consistent with good horticultural
practice. All 300 pot and larger plant material is to be guyed and staked as per Detail - Advanced Container Planting. Smaller plant stock is to
be staked as necessary. Stakes shall not pass through the rootball of plant at time af planting or any time thereafier.
Stock may be rejected if plants are:-
a) Undersized proportional to specified container size or is the root system if underdeveloped
b) Oversized proportional to specified container size of severely root bound.
c) Unbalanced or uncharacteristic of normal or specified growth pattern for the species.
d) Not suitably acclimatised for the specific environment
e) Diseased, infested with pests or suffering from other form of significant stress.
GARDEN MULCH
Mulch shail be one inch hoop pine mulch to predominant depth of 100mm. Mulch is ta be graded to avoid placement against green plant
stems and overflow from purpose formed edges, kerbs and pathways.
TURF
a) "SIR WALTER" minimum sod depth 25mm
b) Turf to be laid within 24 hours of being cut
c) Allow for ground preparation and deposition of 50mm imported garden loam topsoil
d) Turf to be closed butted and rolled in accordance with accepted practice to ensure a smooth even surface
CONCRETE & PAVING - SUPPLY AND INSTALLATION
To all areas as shown on drawings, supply and install exposed aggregate coloured concrete and pavers. Concrete colour, aggregate
selection paver selection and installation details as nominated on the plan Paving Schedule. Installation to follow industry best practices
including ground preparation, compaction, minimal slump allowances and minimum joint distances.
GRAVEL - SUPPLY AND INSTALLATION
Supply and instatl minimum 80mm depth approved 46mm-20mm Cream River Gravel to a compacted sub base to all areas shown on the
plan.
MAINTENANCE
a) Obtain signoff of all landscape construction works prior to commencement of the maintenance period. The maintenance period will not be
deemed to have cammenced without signoff.
b) Monitor plant performance and stress constantly and take appropriate remedial action. Soil moisture levels are critical during early
establishment
c) Mow turf every 1-2 weeks or as required to ensure turf does not exceed 80mm height.
d) Prune and shape all shrubs and trees as required. Replace at the contractors cost all plants which display a loss of condition or are stolen
& vandalised.
) Monitor irrigation performance and take remedial action where required.
f) Fertilise al garden beds at completion of maintenance period (12 weeks).
g) Contractor shall maintain an up to date written log book to record inspection observations and actions
h) Contractor must obtain signoff of all landscape works at the completion of the 12 week maintenance period. To obtain signoff all plants
must display health and establishment, mulch must be at the specified depths, imigation must be in complete working order, timber elements
must be re-stained within 2 weeks of maintenance completion, electrical elements must be in complete working order, concrete is to be clean
and free of cracks and depressions, turf is to display a healthy dense even sward to 95% cover and generally the landscape must dispray
compliance with industry standards. If at the final inspection, the landscape does not obtain signoff, the landscape contractor must continue to
maintain until the landscape is compliant with the above standards.
Planter box shown without lining
for information purposes. Both
boxes require lining
Stainless steel angle
brackets with ss. coach head
bolts connecting battens
TIMBER POTS - DETAIL SECTION
BUSH ROCK SCHEDULE
Small 200-300mm in any direction
Medium 500-600 in any direction
Large 700-800 in any direction
* Bush rock to be smooth/round faced and
free from chips and scraps.
* Bury all rock generally 1/2 the rock depth.
* Rock selection and burying depths to be
approved prior to installation..
impermeable rigid
membrane lining
timber boxes
Stainless steel angle
brackets with ss. coach
head bolts connecting
battens
100x35 Hardwood
timber battens
TIMBER POTS - DETAIL PLAN Scale 1:20
100mm mulch as specified
and imported podium
topsoil mix in planter boxes
WALL OF UNIT
impermeable rigid membrane
lining timber boxes
100x35 Hardwood
timber battens
400mm mulch as
specified & imported
podium topsoil mix
Sos
= Poe
L508
LLG8
LOGS
Maia
BON
Concrete blocks
supporting planter boxes
at their required height
is
os
nite
LVS
05
SID
Od
$s
es
LX
XS
XJ
He
Ks
os
ee
USC
bo
4
ie
OX
Drainage medium
(by others)
EDGE OF PODIUM GARDEN BED
Scale 1:20
LEGEND -
80mm depth gravel as.
detailed & specified
Bush boulders as scheduled
Tree planting as scheduled
Shrubs & Groundcovers as
scheduled
ro
~6 JUL 2007
5545 a
FRONT COUR.
oe
’-
c a ad
LANDGRAPHICS
LANDSCAPE ARCHITECTS
Principal: Robert J, Burred
2nd Floor Esplanade and Secand Buikding. Mar
P.O. Box 18 Maroochydore 4558
landgraphicegPfexinet.com.au
wrune Jandgraphics.com.ay
Tel: (07) 5443 4044
Fay: (07) 5443 4534
COPYRIGHT ; No reproduction al all o¢ part a his crawing may be unooraken wlhout
The express wnitien permission of the ausher.
SUNVIEW VILLAS
roachydore
‘Client
Mr. J CAMERON & Mr. J McComax
Architect
WILL FRANKLIN DESIGN
Drawing Tie
LANDSCAPE PLANTING PLAN,
DETAILS & SPECIFICATION
03 OF 03
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1017 - Response to Info Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.