Skip to the record
Beware of cheap imitations.

Council archive · source document

07/1017 - Response to Info Request [As Published] · 142007.1017

of 13

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

2x AUSbb
4x DilAcae

  
  
  

_< 1X MACluc

By
BS, 1x DORexc

Ze
GF

2 medium & 1
small bush rock
as scheduled
2x AUSbb

3x VIOhed

  

4th FLOOR PLANTING PLAN
Scale 1:100

 

   
  
  
 
   
 

PLANT SCHEDULE -
CODE SCIENTIFIC NAME COMMON NAME SIZE QTy
Shrubs
ALParu = Alpinia arundelliana Dwarf Ginger 200mm 7
AUSbb = Austromyrtus ‘Blushing Beauty’ Blushing Beauty 200mm 4
CORmb = Cordyline rubra ‘Red’ Red Palm Lily 200mm. 4
DORexc Doryanthus excelsa Gymea Lily 300mm 2
LiNmon —_Linospadix monostachya Walking Stick Palm 300mm 17
MACluc Macrozamia lucida Pineapple Zamia 300mm 2
XANjoh = Xanthorrhoea johnsonii Grass Tree <300 trunk 1
Tussocks & Ground Covers
ANigem  Anigozanthus ‘Bush Gem' Bush Glow Kangaroo Paw 140mm 6
PANjas  Pandorea jasminoides Pink Bower of Beauty 140mm 3
DlAbre  —— Dianella brevipedunculata Flax Lily 140mm 4
\SOnod _—_ /solepsis nodosa Knobby Club Rush 140mm 2
ViOhed Viola hederacea Native Violet 140mm 47
1x MAClud in
timber pot as

detailed

1 medium & 2
small bush rock
as scheduled

6x ANigem

1x PAnjas

2x CORrub
1IxPAnjas

    
 
  
 
 

smail bush rock
as scheduled

  

3rd FLOOR PLANTING PLAN Scale 1:100

  

 

 

 

 

SPECIFICATION

EXTENT OF WORKS
Contractor should take full account of documentation of Civil Engineering, Hydraulic and Electrical Engineering Works. Landscape works are
ta include the following:

EXCAVATION AND DRAINAGE

Break up and remove any excess concrete slurry from construction works to achieve Tequired planting depths. Excavate site sod to a depth of
100mm. Break up remaining subgrade to a depth of 100mm. Drainage is to be incorporated to alf planting areas that are enclosed by hard
edging and not otherwise drained. Contractor should allow for overland gravel drains through mulched areas to stormwater catchment pits.

IRRIGATION

Irrigation for the project shail be carried out by an experienced and reputable irrigation contractor - Tenderers intending to handle the irrigation
themsetves will be required to demonstrate proficiency in this area. Submit an irrigation plan to the site Supervisor for approval prior to
installation. A fully automated and programmable irrigation system, with ramswitch, is ta be provided fo all Garden areas. All fittings are to be
fully effective and inconspicuously placed with lines placed through conduits under hard surfaces. Water connection points wi be the water
tanks at the rear of each lot. The system should provide requlated application to all areas with no overspray or runoff onto hard surfaces,
Irrigation systems are to be guaranteed for a period of 12 months against faulty materials and workmanship.

TOPSOIL - SUPPLY AND INCORPORATION

Planting areas are to be progressively filled with premium grade blended organic garden soil mix to a minimum of 400mm depth. Soil to be an
approved garden organic mix. Soil supplier as well as intended mix is to be nominated. Soil is to be mounded to facilitate good drainage to
hardstand areas (max 1:3 grade} and is to finish 50mm below edging after settlement. Organic additive such as ‘Dynamic Lifter is tobe...
incorporated throughout the soil mix at the recommended rate. A slow release fertiliser ‘Osmocote' or equivalent is also to be incorporated
with individual plantings in accordance with the manufacturers recommendations.

EDGING
Provide an extruded concrete edge to all garden beds where adjacent to grass areas. Line of edging to be set out and approved on site prior
ta construction.

SHAPING OF GARDEN AREAS
Planting areas are to be finished in a gently mounded fashion to facilitate drainage of excess water and to show Planting to best advantage.
Contractor is to seek canfirmation of finished levels prior to final plantings and application of mulch.

CONTAINERISED PLANT MATERIAL

Plant material is to be approved by superintendent prior to planting. Planting is to be carried out in a manner consistent with good horticultural
practice. All 300 pot and larger plant material is to be guyed and staked as per Detail - Advanced Container Planting. Smatier plant stock is to
be staked as necessary. Stakes shall not pass through the rootball of plant at time of planting or any time thereafier.

Stock may be rejected if plants are:-

a) Undersized proportional to specified container size or is the root system if underdevelaped

b) Oversized proportional to specified container size or severely root bound.

c) Unbatanced or uncharacteristic of normal or specified growth pattem for the species.

d) Not suitably acclimatised for the specific environment.

e) Diseased, infested with pests or suffering from other form of significant stress.

 

GARDEN MULCH
Mulch shail be one inch hoap pine muich to predominant depth af 100mm. Mulch is to be graded to avokd placement against green plant
stems and overflow from purpose formed edges, kerbs and pathways.

TURF

a) "SIR WALTER" minimum sod depth 25mm

b) Turf to be laid within 24 hours af being cut

c) Allow for ground preparation and deposition of 50mm imported garden loam topsoil

d) Turf to be closed butted and rolled in accordance with accepted practice to ensure a smooth even surface

CONCRETE & PAVING - SUPPLY AND INSTALLATION

To all areas as shown on drawings, supply and install exposed aggregate coloured concrete and pavers. Concrete colour, aggregate
selection paver selection and installation details as nominated on the plan Paving Schedule. Instalfation to follow industry best practices
including ground preparation, compaction, minimal slump allowances and minimum joint distances.

GRAVEL - SUPPLY AND INSTALLATION
Supply and instal! minimum 80mm depth approved 16mm-20mm Cream River Gravel to a compacted sub base to all areas shown on the
plan.

MAINTENANCE

a) Obtain signoff of all landscape construction works prior to commencement of the maintenance period. The maintenance period will not be
deemed to have commenced without signoff.

b) Monitor plant performance and stress constantly and take appropriate remedial action. Sol moisture levels are critical during early
establishment

c) Mow turf every 1-2 weeks or as required to ensure turf does nat exceed 80mm height.

d) Prune and shape all shrubs and trees as required. Repiace at the contractors cost all plants which display a loss of condition or are stolen
& vandalised.

@) Monitor irrigation performance and take remedial action where required.

1} Fertilise all garden beds at completion of maintenance period (12 weeks).

g) Contractor shall maintain an up to date written log book to record inspection observations and actions

h) Contractor must obtain signoff of all landscape works at the completion of the 12 week maintenance period. To obtain signoff all plants
must display heaith and establishment, mulch must be at the specified depths, irrigation must be in complete working order, timber elements
must be re-stained within 2 weeks of maintenance completion, electrical elements must be in complete working order, concrete is to be clean
and free of cracks and depressions, turfis ta display a healthy dense even sward to 95% cover and generally the landscape must display
compliance with industry standards. if at the final inspection, the landscape does nat obtain signoff, the landscape contractor must continue to
maintain until the landscape is compliant with the above standards.

 

 

Planter box shown without lining
for information purposes. Both
boxes require lining

Stainless steel angle
brackets with ss. coach head
bolts connecting battens

BUSH ROCK SCHEDULE

Small 200-300mm in any direction
Medium 500-600 in any direction

Large 700-800 in any direction

* Bush rock to be smooth/round faced and
free from chips and scraps.

* Bury all rock generally 1/2 the rock depth.
* Rock selection and burying depths to be
approved prior to installation..

 

   
  

Impermeable rigid
membrane lining
timber boxes

Stainless steel angle
brackets with ss. coach
head bolts connecting
battens

100x35 Hardwood
timber battens

TIMBER POTS - DETAIL PLAN Scale 1:20

    

100mm mulch as specified
and imported podium
topsoil mix in planter boxes

 

WALL OF UNIT

 
  

Impermeable rigid membrane
lining timber boxes

 

   
   
  
 
  
  
 
 
 
 

100x35 Hardwood
timber battens

    
  
 

   

Q
OY
ORR’
SRR

100mm mulch as
specified & imported
podium topsoil mix

    

Concrete blocks
supporting planter boxes
at their required height

 

Drainage medium

 

 

 

 

EDGE OF PODIUM GARDEN BED

TIMBER POTS - DETAIL SECTION

 

 

(by others)

Scale 1:20

LEGEND -

AMENDMENTS

80mm depth gravel as
detailed & specified

Bush boulders as scheduled

” Tree planting as scheduled

Shrubs & Groundcovers as
scheduled

description

 

dats
27.06.07

Cc a
LANDGRAPHICS

dawn
ORIGINAL ISSUE ALS

d

LANDSCAPE ARCHITECTS

Principal: Robert J. Burrell

2nd Fino. Esplanade and Sacand Auiding. baroocnydore

P.O. Box 18 Mavoochydore 4558
handgraphics@ fexinat com,au
plandgré comau
Tet (07) 5443 4044
Far. (07} 5443 4534

COPYRIGHT: No reproduction of all or pat of this crawing may be undertaken wanout
the express wittien permission of he aur,

SUNVIEW VILLAS

 

Client

Mr. J CAMERON & Mr. J McComax

 

Architect

WILL FRANKLIN DESIGN

 

Drawing Tile

LANDSCAPE PLANTING PLAN,
DETAILS & SPECIFICATION

Drawing.

 

Job No...
LA1201

LA03 03 OF 03

 

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1017 - Response to Info Request [As Published].pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.