6. Appendix C - Noosa Assessment Benchmark Assessment
Specific Outcomes Accepted Solutions Heading
areas are revegetated using
species identified in PSP3 -
Landscaping Plants and
Guidelines;
S4.2 To be resolved in construction
Earthworks are undertaken only documentation.
during the hours of 7am to 6pm,
Monday to Friday and 7am to
6pm on Saturday. No work is
undertaken on Sunday or public
holidays.
Vegetative Waste S5.1 To be resolved in construction
O5 Cleared vegetation is transported documentation.
off-site for disposal in an
Vegetation cleared from a
approved green waste disposal
development site is disposed of in
an environmentally responsible facility; OR
manner. S5.2
Cleared vegetation is mulched
on-site and reused for
landscaping of the finished
development;
S5.3
Cleared vegetation is disposed of
for the purpose of firewood.
(Note: Disposal of vegetative
waste by burning off is not an
acceptable method of disposal).
Managing contamination risk S6.1 To be resolved in construction
The fill material is solid clean documentation.
O6
earth, free of putrescible or refuse
Materials used as fill are suitable
material, vegetation, acid sulfate
for development of the land and
soils, building or construction
filling or excavation works do not
material or other material or
result in the contamination of land
contaminants; AND
S6.2
The site is not on the
contaminated land register
Haulage activity and amenity
O7 No solution provided
Haulage of material to and from a
site ensures— a) minimal
disturbance to neighbouring
properties and properties along the
haulage route; and b) Council’s
road infrastructure including
pavements is not adversely
affected.
Extent of earthworks S8.1 As per the proposal.
46