Original source · versioned page text
6. Appendix C - Noosa Assessment Benchmark Assessment
Specific Outcomes Accepted Solutions Heading
O8 All earthworks, including cut and
fill batters, retaining walls etc are
Earthworks are contained within
contained within the subject site.
the subject property.
Sloping sites S9.1 Some fill under buildings of over
2m depth required to achieve
O9 Cut or fill is less than 2m in depth
appropriate floor level for flood
On sloping sites, excavation or relative to the natural ground
protection.
filling are designed to maximise the surface
use of natural slope and minimise
the need for cut and fill.
Environmental protection No solution provided To be resolved in construction
documentation.
O10
Earthworks minimise any adverse
impact upon groundwater,
watercourses, drainage lines,
wetlands, and native vegetation.
Dams S11.1 Not applicable
O11 Where the site is in the Rural
Dam location and construction Zone—
does not impact upon neighbouring a) the land has a slope of less
properties in terms of— than 25% (1:4); and
a) hydrology; b) the earthworks including cut
and fill batters and retaining walls
b) alteration of existing overland
are setback a minimum of 50m
flowpaths and patterns;
from the property boundary; and
c) landslide or failure of dam wall;
c) the size of the lot is greater
and
than 5 hectares;
d) effluent disposal areas.
S11.2 Not applicable
Where the site is in the Rural
Settlement Zone or the Rural
Zone where the lot is less than 5
hectares—
a) the land has a slope of less
than 1:6; and
b) the earthworks including cut
and fill batters and retaining walls
are setback a minimum of 20m
from the property boundary; and
c) involving less than 500m3 of
material;
S11.3 Not applicable
For all other zones— No solution
provided.