6. Appendix C - Noosa Assessment Benchmark Assessment
Specific Outcomes Accepted Solutions Heading
c) exposed soil and construction
access must be managed in
accordance with International
Erosion Control Association Best
Practice Erosion and Sediment
Control (BPESC) 2008; and
d) temporary or permanent
downpipes are connected to the
stormwater system before laying
the roof; or
e) localised erosion is avoided by
directing flow from downpipes
over non-erosive areas
O2 Works in a watercourse S2.1 To be resolved in construction
documentation
Construction activities within Work within waterways must be
watercourses are planned to undertaken in accordance with
prevent erosion, construction Best Practice Erosion and
failure and associated Sediment Control, Appendix I –
sedimentation. Instream works, Sections 14 and
16 International Erosion Control
Association 2008.
S2.2 To be resolved in construction
documentation
Temporary vehicular crossings of
waterways must be designed and
constructed to convey flows for
the 50%AEP event and remain
stable for all rainfall events up to
10%AEP event.