Skip to the record
Every meeting, every word.

Original source · versioned page text

6. Appendix C - Noosa Assessment Benchmark Assessment

of 111

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Specific Outcomes                Accepted Solutions                     Heading
                                 c) exposed soil and construction
                                 access must be managed in
                                 accordance with International
                                 Erosion Control Association Best
                                 Practice Erosion and Sediment
                                 Control (BPESC) 2008; and
                                 d) temporary or permanent
                                 downpipes are connected to the
                                 stormwater system before laying
                                 the roof; or
                                 e) localised erosion is avoided by
                                 directing flow from downpipes
                                 over non-erosive areas
O2 Works in a watercourse        S2.1                                   To be resolved in construction
                                                                        documentation
Construction activities within   Work within waterways must be
watercourses are planned to      undertaken in accordance with
prevent erosion, construction    Best Practice Erosion and
failure and associated           Sediment Control, Appendix I –
sedimentation.                   Instream works, Sections 14 and
                                 16 International Erosion Control
                                 Association 2008.
                                 S2.2                                   To be resolved in construction
                                                                        documentation
                                 Temporary vehicular crossings of
                                 waterways must be designed and
                                 constructed to convey flows for
                                 the 50%AEP event and remain
                                 stable for all rainfall events up to
                                 10%AEP event.




                                                                                                         49
Log in to download the original file

6. Appendix C - Noosa Assessment Benchmark Assessment.pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.