Original source · versioned page text
6. Appendix C - Noosa Assessment Benchmark Assessment
Division 15 – Erosion and sediment control
Table 24.53 – Erosion and sediment control
Specific Outcomes Accepted Solutions Heading
14.124 Effects of works
Erosion and drainage control, S1.1 To be resolved in construction
sediment capture and
Construction works are designed, documentation
stormwater runoff
planned and executed with
O1 respect to the principles of
Development design, density, erosion reduction, drainage
management and sediment
layout, and staging provide for
capture in accordance with
erosion control, drainage control
Appendix 2, Table A of the
and sediment capture and
treatment during the construction Queensland State Planning Policy
phase. and International Erosion Control
Association Best Practice Erosion
and Sediment Control (BPESC)
2008; AND
S1.2
Construction works are designed
and managed to restrict the
extent of clearing and soil
exposure to that necessary for
access, and safe construction; To be resolved in construction
AND documentation
S1.3
Clean stormwater is diverted or
managed around or through the
site without increasing the
concentration of total suspended
solids or other contaminants in
the flow and without causing To be resolved in construction
erosion (onsite or offsite); AND documentation
S1.4
Cleared areas are effectively
stabilised prior to rainfall if works
are delayed or works are not
intended to occur immediately; To be resolved in construction
AND documentation
S1.6
For buildings,
a) upstream runoff must be
diverted around the construction
site; and
b) sediment barriers are provided
downslope of disturbed areas to
prevent sediment washing into
gutters, drains and watercourses To be resolved in construction
either on or off the site; and documentation
48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original