Original source · versioned page text
23110 Op Works Issue 20-12-2023
50 - 150
NOTES: NOTES GROUNDCOVER PLANTING
STONE STEPPER 40mm THICK
-REFER MATERIALS & FINISHES SCHEDULE FOR - FALL ALL PIPES TO EVENLY TO STORM WATER SYSTEM.
FERTILISER APPLICATION REQUIREMENTS COMPACTED ROAD BASE 150mm DEPTH
- JOIN DRAINS TO UPVC CONDUITS OF SAME DIAMETER WHEN
PLACING UNDER PAVED AREAS OR ANY OTHER AREAS WHICH
TURF REQUIRE A COMPACTED SUB-BASE. IMPORTED SOIL BLEND 150mm DEEP
COMPACTED SUB GRADE
- SUB-SOIL PIPE TO BE 90MM DIAMETER WITH FILTER SOCK.
FSL
IMPORTED SOIL BLEND MIN 100mm DEEP
VARIES
CULTIVATED SUBGRADE -150mm STONE STEPPERS - PA1 & PA2
6 1 : 20
TURF AREA - TU1 BIDIM A12 GEOTEXTILE FABRIC OR
1 APPROVED EQUIVALENT
300
1 : 20 SUB-SOIL PIPE
10-20mm DRAINAGE GRAVEL
NOTES:
- MOUND IMPORTED SOIL BLEND
300
300MM TO CENTRE OF PLANTER WIDTH VARIES
NOTES:
SUBSOIL DRAIN - SSD SCREW CAP TO CLEAN-OUT RISER
-REFER MATERIALS & FINISHES SCHEDULE FOR
FERTILISER APPLICATION REQUIREMENTS
4 1 : 20
FSL
MULCH - TO FINISH LEVEL WITH TOP OF
MULCH PLANTER WALL
IMPORTED SOIL BLEND MIN 300 DEEP NOTES:
- PLACE THE ROOTBALL ON A FIRMED BASE TO ACHIEVE REQUIRED FSL.
- THOROUGHLY WATER THE ROOT BALL IMMEDIATELY AFTER PLANTING.
PLANTER WALL
- NUMBER OF STAKES WILL VARY WITH POT SIZE. REFER PLANT
SCHEDULE.
300
CULTIVATED SUBGRADE -150mm IMPORTED SOIL BLEND - HORIZON A
- CULTIVATE SIDES OF EXCAVATED HOLE 50MM.
WATERPROOFING AND PROTECTION BOARD
PLANT STOCK
PLANTING AREA - PL1
2 1 : 20 HARDWOOD STAKE- 38 X 38 IMPORTED SOIL BLEND - HORIZON B
HEIGHT VARIES
X1800MM. PLACE 600MM OF INTO
THE GROUND. DO NOT PLACE DRAINAGE CELL AND FILTER FABRIC
THROUGH ROOTBALL. SECURE
WITH TIES BY LOOPING IN A
NOTES: FIGURE EIGHT PATTERN.
CLEAN-OUT RISER (WHERE REQUIRED) -
- PLACE THE ROOTBALL ON A FIRMED BASE TO RIGID SLOTTED PVC PIPE SOCKED IN GEO-
ACHIEVE REQUIRED FSL. TOP OF ROOTBALL TO FINISH 20mm TEXTILE FILTER FABRIC
- THOROUGHLY WATER THE ROOT BALL BELOW FINISHED SOIL LEVEL.
IMMEDIATELY AFTER PLANTING. FORM SHALLOW DEPRESSION IN
- CULTIVATE SIDES OF EXCAVATED HOLE 50MM. SOIL AROUND ROOTBALL FOR
WATER RETENTION. SEPARATE
PLANT STOCK -RAISE PLANT 25MM
MULCH 100mm FROM TREE TRUNK.
ABOVE SOIL SURFACE LEVEL.
GEO-TEXTILE FILTER FABRIC
MULCH - PULL AWAY FROM BASE OF FORM EARTHEN BASIN COARSE WASHED SAND
PLANT AROUND BASE OF PLANT.
FORM EARTHEN BASIN AROUND BASE
OF PLANT. FSL
FSL DRAINAGE CELL AND FILTER FABRIC
1 ROOTBALL
FERTILISER- DO NOT ALLOW PLANTER DRAIN
1
CONTACT WITH ROOTS.
1 STRUCTURAL SLAB
ROOTBALL
w 1
IMPORTED SOIL BLEND
2xw
PLANTING AREA - PL2
FERTILISER- DO NOT
ALLOW FERTILISER TO
COME IN CONTACT WITH
7 1 : 20
GENERAL PLANTING
3
ROOTS. WIDTH (w)
2xw
1 : 20
ADVANCED PLANTING
5 1 : 20
[email protected] David Low Way Duplex LANDSCAPE DETAILS Project No. Drawing Issue Scale NOT FOR CONSTRUCTION
23110 LA4-001 C 1 : 20 @A3
9 Fort Lane
Milton Qld 4064
206 David Low Way, Peregian Beach Issue Date Purpose Drawn Approved
PO Box 287 A 11-10-2023 DRAFT ISSUE GG AG
Paddington Qld 4064 B 12-10-2023 OP WORKS ISSUE GG AG
©2022 Wild Studio Australia Pty Ltd. These C 13-12-2023 OP WORKS ISSUE GG AG
urban landscape architecture drawings are protected by copyright and may not
wildstudio.com.au Client: Adam Offermann and Madeleine Swete Kelly be amended or reproduced without authorisation.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original