Code Item Description / Comments Supplier Location Image Code Item Description / Comments Supplier Location Image
Earthworks Planting
Excavation To adjust civil profiles to desired shape and trim Trees NatSpec Certified
/ Filling to
Shrubs NatSpec Certified
adjust civil
profiles Groundcovers NatSpec Certified
Grading and All landscape assumes bulk levels are left within 125mm of RB Rootbarrier Nylex or approved similar.
Trim (all required finished levels
landscape)
Garden Edging
ED1 Steel Garden Material: BlueScope REDCOR Steel Edging (Corten)
Softscape Edge
Height: 100mm
TU1 Turf Area Turf: Palmetto Soft Leaf Buffalo
Turf rolls are to be laid immediately upon Gauge: 3.0mm steel
arrival to site. Safety edge: 7.5mm rounded top
Fertiliser Pre-laying: 22:1:5 NPK fertiliser installed at Staking: 400mm tapered stake
2.5kg/100m2
Establishment: 22:1:5 NPK fertiliser installed
at 2.5kg/100m2
Imported soil 100mm depth to Soils for Landscape
blend: Development Specification C1 Turf Media
and AS4419
No addition of imported soil blend within TPZ
of existing trees
Cultivated 150mm depth and add gypsum at 200g/m2.
Subgrade: The contractor needs to supply a sample of
the proposed slow release fertilizer to the Drainage
landscape architect and water management
consultant before installation and within three DC Drainage Type: 100 mm UPVC
weeks of taking procession of site for review. Conduit
Marker pins for Brass. Set into concrete with the arrow
This sample is to include all relevant data conduits: indicating the direction of conduit. Allow 1
sheets and MSDS sheets. (one) marker per conduit.
No cultivation of existing subgrade within TPZ
SSD Subsoil Pipe: High density polyethylene slotted corrugated
of existing trees
Drainage drainage pipe wrapped in 10-20mm dia.
PL1 Planting Area Mulch: 75mm depth of 25mm (screened) Hoop Pine Drainage gravel. Pipe to be socked in geo-
- In Ground Mulch textile filter fabric
Fertiliser 20:4.3:4.1 NPK fertiliser tablets installed at
min. 2 tablets per plant
Pavement
Imported soil 300mm deep to Soils for Landscape
blend: Development Specification D2 Garden Bed PA1 Stone Stepper Type: Bluestone Organic Stepper Eco Outdoor
Planting Soil and AS4419 - Organic
Finish: Sawn
No addition of imported soil blend within TPZ
Size: Random L x Random W x H30mm
of existing trees
Sample Min. 1m2 in-situ sample panel required at
Cultivated 150mm depth
least 7 days in advance for approval
Subgrade: No cultivation of existing subgrade within TPZ
of existing trees. Sub-Base: 200mm deep compacted road base
Joints: 50-150mm joints excavated and backfilled
with minimum 200mm deep imported soil
PL2 Planting Horizon A Imported soil blend to Soils for Landscape blend
Area - -300mm Development Specification E1 On-Slab Soil Slip Rating: P4 to AS4586 (2013)
Containerised Imported soil Media “A” Horizon and AS4419
blend:
Horizon B - Imported soil blend to Soils for Landscape
Imported soil Development Specification E2 On-Slab PA2 Stone Stepper Type: Bluestone Stepper
blend - depth Soil Media “B” Horizon and AS4419 - depth - Linear
Finish: Sawn
varies: varies to achieve desired planter depth
Size: L900mm x W600mm x H30mm
Drainage 100mm coarse washed river sand
layer: Sample Min. 1m2 in-situ sample panel required at
Geotextile membrane Bidim A14G least 7 days in advance for approval
90mm overflow/inpsection pipe with PVC
Sub-Base: 200mm deep compacted road base
storm grate and gravel surround to be
installed over all planter drains Joints: 50-150mm joints excavated and backfilled
30mm Atlantis Flo-Cell to sides and base of with minimum 200mm deep imported soil
planter. Connect planter drain to stormwater blend
Waterproofing and protection by Architect Slip Rating: P4 to AS4586 (2013)
[email protected] David Low Way Duplex MATERIALS AND FINISHES Project No. Drawing Issue NOT FOR CONSTRUCTION
23110 LA5-001 D
9 Fort Lane
206 David Low Way, Peregian Beach SCHEDULE Issue Date Purpose Drawn Approved
Milton Qld 4064
A 11-10-2023 DRAFT ISSUE GG AG
PO Box 287
B 12-10-2023 OP WORKS ISSUE GG AG
Paddington Qld 4064
©2023 Wild Studio Australia Pty Ltd. These C 13-12-2023 OP WORKS ISSUE GG AG
urban landscape architecture drawings are protected by copyright and may not D 20-12-2023 OP WORKS ISSUE GG AG
wildstudio.com.au Client: Adam Offermann and Madeleine Swete Kelly be amended or reproduced without authorisation.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original