23110 Op Works Issue 20-12-2023
Code Item Description / Comments Supplier Location Image
Boulder & Gravel
PE1 Nambucca Type: Nambucca River Pebble Centenary
River Pebble Landscaping
Size: Oversize
Depth 75mm Installed gravel over water permeable
weed mat
Furniture & Fixtures
TR1 Wire Trellis Refer Architect
Irrigation
Irrigation to All planting areas to be irrigated
Planting Areas
Connection Supply all pipework to connect system to tank
to Rainwater
Tank
Irrigation Description of system as specified
system
IC Irrigation Type: 100 mm UPVC
Conduits
Marker pins for Brass. Set into concrete with the arrow
conduits: indicating the direction of conduit. Allow 1
(one) marker per conduit.
Establishment / Maintenance Period
All planting 12 weeks
and turf areas
Advanced tree 52 weeks
planting (200lt
and above)
[email protected] David Low Way Duplex MATERIALS AND FINISHES Project No. Drawing Issue NOT FOR CONSTRUCTION
23110 LA5-002 D
9 Fort Lane
206 David Low Way, Peregian Beach SCHEDULE Issue Date Purpose Drawn Approved
Milton Qld 4064
A 11-10-2023 DRAFT ISSUE GG AG
PO Box 287
B 12-10-2023 OP WORKS ISSUE GG AG
Paddington Qld 4064
©2023 Wild Studio Australia Pty Ltd. These C 13-12-2023 OP WORKS ISSUE GG AG
urban landscape architecture drawings are protected by copyright and may not D 20-12-2023 OP WORKS ISSUE GG AG
wildstudio.com.au Client: Adam Offermann and Madeleine Swete Kelly be amended or reproduced without authorisation.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original