Council archive · source document
17494 SARA Early Referral · OPW20/0237
2010-19429 SER
7. The works to which this approval relates are to be for a private At all times
purpose only.
8. Any operator and contractor involved in the works to which this During construction
approval relates must:
(a) be provided a copy of these referral agency conditions;
(b) install all measures, plant and equipment necessary to
ensure compliance with the conditions of this approval;
(c) maintain such measures, plant and equipment in a proper
and efficient condition; and
(d) operate such measures, plant and equipment in a proper
and efficient manner.
9. For the operational works only use materials which are free from During construction
contaminants as defined under section 11 of the Environmental
Protection Act 1994.
10.
Should the pontoon collapse, fail or otherwise suffer structural As soon as reasonably
consequences which impact their integrity or ability to function as practicable subsequent
intended, the works must be: to the damage
(a) reinstated in accordance with this development approval; or
(b) removed and disposed of at an appropriately licensed facility.
11.
Submit “As Constructed drawings” to [email protected] or mail Within two (2) weeks of
to: the completion of the
works
Department of Environment and Science
Permit and License Management
Implementation and Support Unit
GPO Box 2454
Brisbane Qld 4001
State Assessment and Referral Agency Page 4 of 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
17494 SARA Early Referral.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.