Effluent Disposal Approval northern unit
PO Box 4291, Springfield QLD 4300
ABN 37 147 807 420
QBCC Licence Number: 15055672
Proudly Australian Owned
Site and Soil Evaluation
On-Site Wastewater and Effluent Disposal
System Design Solution
53 Martins Road,
Cooroy QLD 4563
APPROVED
NOOSA COUNCIL
PLUMBING SERVICES
PLUMBING & DRAINAGE ACT 2018
PLUMBING PERMIT NO PL21/0290
Date 30/8/2021 Officer
Taylor Environmental No: TE211533
Date: 23 April 2021
Document Set ID: 21598877
Taylor Environmental (Australia) Pty Ltd on behalf of Taylor Environmental Unit Trust
Version: 1, Version Date: 30/08/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 15 pages
Page 2
1 Background
Taylor Environmental (Australia) Pty Ltd was engaged to design an on-site wastewater
treatment and effluent disposal system at 53 Martins Road, Cooroy QLD 4563. This property
is not serviced by a municipal sewer network and requires a wastewater treatment and effluent
disposal system.
The site location is displayed in Figure 1, below.
Figure 1: Site Location
The design was completed by Chris Taylor (Director, Taylor Environmental (Australia) Pty Ltd,
QBCC Licence Number 150 556 72).
2 Legislation and Standards
This report has been completed in accordance with the relevant legislative requirements:
● Plumbing and Drainage Act
● Plumbing and Drainage Regulation
● Queensland Plumbing and Wastewater Code
● AS/NZS 1547:2012 On-site Domestic Wastewater Management
● Plumbing Code of Australia (PCA)
3 Effluent Standards
Table 1 below presents the effluent standards produced by approved wastewater treatment
systems with beds or trenches.
Table 1: Effluent Quality
Parameter Secondary Advanced Secondary
90% < 20 mg/L 90% <10 mg/L
Biochemical Oxygen Demand
100% < 30 mg/L 100% <20 mg/L
90% < 30 mg/L 90% < 10 mg/L
Total Suspended Solids
100% < 45 mg/L 100% < 20 mg/L
Site and Soil Evaluation 53 Martins Road, Cooroy QLD 4563
Taylor Environmental (Australia) Pty Ltd Page 2 of 16
Document Set ID: 21598877
Version: 1, Version Date: 30/08/2021
Page 3
4 Site Details
Details of the subject property are presented in Table 2, below.
Table 2: Property Details
Feature Details
Property Address 53 Martins Road, Cooroy QLD 4563
Real Property Description Lot 4 on RP852013
Local Authority Noosa Shire Council
Property size 15.5797 ha
Dwellings/structures Primary dwelling, sheds, proposed caretakers’ cottage
Water Supply Rainwater
Easements n/a
Vegetation Pasture grasses
Slope 13%
Slope configuration Linear Divergent
Aspect East
Water bodies Dams and intermittent watercourses
Bores n/a
Flood hazard n/a
Environmental Areas Riparian Buffer Area around watercourses
5 Soil Investigation
A geotechnical assessment of the property was undertaken by Geotechnical Soils on 2
November 2020. The soil profile of the proposed land application area (Borehole 3) is
presented in Table 3.
Table 3: Soil Profile
Depth Texture Colour Plasticity Structure Category
300 Sandy Clay Grey yellow brown Low Moderate 4
700 Sandy Clay Red/orange yellow brown Medium Strong 5
1400 Sandy Clay Orange brown Low-medium Strong 5
2000 Sandy Clay Yellow brown Low Moderate 4
Table 4 presents the design characteristics of the receiving soil.
Table 4: Design Soil
Feature Details
Texture Sandy Light Clay
Colour Red/orange yellow brown
Structure Strong
Category 5
Indicative Permeability (Ksat) 0.12 – 0.5m/day
Design Loading Rate (DLR) 12 mm/day
Site and Soil Evaluation 53 Martins Road, Cooroy QLD 4563
Taylor Environmental (Australia) Pty Ltd Page 3 of 16
Document Set ID: 21598877
Version: 1, Version Date: 30/08/2021
Page 4
6 Wastewater System Solution Design
It is proposed to install and AES system for the new caretakers cottage. The septic system for
the primary residence is to be retained.
Table 5 below presents the key features of this design solution.
Table 5: Design Features
Feature Details
Treatment plant Advanced Enviro Septic (AES)
Treatment System Treatment plant approval 15/2019
Treatment level Advanced secondary
Water supply Rain Water (120 L/day)
Number of bedrooms 2 bedrooms
Design Volume
Number of people 4 People
Total Design Volume (Q) 480 L/day
Category 5
Soil Characteristics
Design Loading Rate (DLR) 12 mm/day
Application method Subsurface AES bed
Land Application
Required Land Application Area A = Q / DLR = 480 / 12 = 40 m2
Area
Proposed Land Application Area 40 m2
The design of the AES system is presented in Appendix A.
The Advanced Enviro-Septic Approved Design Calculator is presented in Appendix B.
The AES Treatment Plant Approval is presented in Appendix C.
7 Setback Distances
The Queensland Plumbing and Wastewater Code V1:2019 Appendix Part 2, Table T2 and
Table T5, outlines minimum setback separation distances required for subsurface land
application areas.
These distances are presented in Table 6.
Table 6: Separation Distances
Separation Distance
Feature
Up Slope Down Slope Level
Property boundaries, pedestrian paths, walkways,
2m 4m 2m
recreation areas, retaining walls, footings
Inground swimming pool 6m 6m 6m
Inground potable water tank
6m 6m 6m
(not exposed to primary effluent)
Inground potable water tank
15 m 15 m 15 m
(exposed to primary effluent)
Site and Soil Evaluation 53 Martins Road, Cooroy QLD 4563
Taylor Environmental (Australia) Pty Ltd Page 4 of 16
Document Set ID: 21598877
Version: 1, Version Date: 30/08/2021
Page 5
Separation Distance
Feature Adv.
Secondary Primary
Secondary
Top of bank of watercourse / waterbody 10 m 30 m 50 m
Open stormwater drainage channel or drain 10 m 30 m 50 m
Bore or dam 10 m 30 m 50 m
Permanent water table (vertical) 0.3 m 0.6 m 1.2 m
This design complies with all relevant separation distances.
8 Maintenance
Homeowners have a responsibility to ensure the onsite wastewater treatment and effluent
disposal system is maintained and serviced.
The following servicing and precautions are to be undertaken:
• Septic tanks to be checked annually and pumped out when 1/3 full of solids or once every
5 years, whichever is sooner
• Read and follow the Owner's Manual that is provided with the system
• Comply with local authority’s servicing requirements
• Do not manipulate the system so that it no longer complies with the Council issued permit
or the plans located in Appendix A of this document
• Maintain the land application area e.g. regularly mowed and ensure that there is no
ponding of effluent
• Vehicles, animals and general access to the land application area is to be generally
restricted with warning signs erected
• Use low sodium biodegradable soaps and detergents as per the label instructions and no
paints, solvents, chemicals, food scraps, fats, oils or any other solids to be disposed of
“down the drain”
• It is always good practice to minimise / stagger high wastewater generating activities such
as laundry over a full week
• On-site sewage systems are not designed to cope with the flow from garbage grinders
Chris Taylor MEnvMan, BAppSc(Chem), ADCivEng Cert IV DWM003
Director | Taylor Environmental (Australia) Pty Ltd
23 April 2021
Site and Soil Evaluation 53 Martins Road, Cooroy QLD 4563
Taylor Environmental (Australia) Pty Ltd Page 5 of 16
Document Set ID: 21598877
Version: 1, Version Date: 30/08/2021
Page 6
Appendix A System Design Drawings
Site and Soil Evaluation 53 Martins Road, Cooroy QLD 4563
Taylor Environmental (Australia) Pty Ltd Page 6 of 16
Document Set ID: 21598877
Version: 1, Version Date: 30/08/2021
Page 7
REVISIONS
REV DATE SUBJECT AUTHORISED
PROPOSED CARETAKERS A 23/04/2021 REVISION A C. TAYLOR
COTTAGE WITH AES SYSTEM
20000
RIPARIAN TAYLOR ENVIRONMENTAL
BUFFER AREA
14000
50
00
0
180000
QBCC LICENCE NUMBER 150 556 72
ABN NUMBER 95268308955
Phone: +61 400 301 364
Email: [email protected]
Web: www.taylorenviro.com.au
PRIMARY
DWELLING
WASTE WATER TREATMENT &
EFFLUENT DISPOSAL SYSTEM
AUTHORISED FOR ISSUE DATE
23/04/2021
APPROVED STREET ADDRESS
53 MARTINS ROAD, COOROY 4563
LOT & PLAN 4 RP852013
NAME OF CLIENT
NOOSA COUNCIL ECO COTTAGES
COUNCIL
NOOSA SHIRE
PLUMBING SERVICES DESIGNER
C. TAYLOR
DATE
23/04/2021
DRAWN DATE
PLUMBING & DRAINAGE ACT 2018 M. MAHONY
DRAWING DETAILS
23/04/2021
Site Layout
MARTINS PLUMBING PERMIT NO PL21/0290 SCALE
ROAD
1:2000
CLIENT REFERENCE #
JOB NUMBER REVISION DWG #
Date 30/8/2021 Officer TE211533 A SL1
Document Set ID: 21598877
Version: 1, Version Date: 30/08/2021
Page 8
GENERAL NOTES:
- LOCATION OF HSTP, ORG, VENT PIPE AND OTHER 135m REVISIONS
WASTE PIPES TO BE DETERMINED BY PLUMBER REV DATE SUBJECT AUTHORISED
- REFER TO COMPLIANCE PERMIT FOR CONDITIONS OF A 23/04/2021 REVISION A C. TAYLOR
COUNCIL APPROVAL
REDUCED LEVELS: 135m
- AES FSL = 135.1
- MIN INVERT OF SEPTIC TANK OUTLET = 135.175
- MIN INVERT OF SEPTIC TANK INLET = 135.225 134m
- MIN TOP OF SEPTIC TANK = 135.65
- DWELLING FFL = 137.00 133m
AES SYSTEM: TAYLOR ENVIRONMENTAL
- EXCAVATE BED WITH LASER LEVEL
- RIP LEVEL OF BASE ≈300 to 400mm
- RE-EXCAVATE BED BACK TO CORRECT LEVEL USING
A LASER LEVEL POOL
12200
- GYPSUM BASE AT 1kg/m2
- PLACE AES APPROVED SAND
- USE JIG TO ENSURE THAT AES PIPES ARE STRAIGHT
AND LEVEL
136m
- PLACE AES APPROVED SAND OVER PIPES TO THE
20000
CORRECT DEPTH
- REPLACE EXCAVATED SOIL IN BED 100% RESERVE AREA
- TOP SOIL AND GRASS
- NO TREES WITHIN 2m OF BED
SEPTIC TANK:
PROPOSED
930
- TO BE INSTALLED AS PER MANUFACTURERS
SPECIFICATION CARETAKERS
0
- SWIVEL KNUCKLE AND EXPANSION JOINTS TO BE 950
COTTAGE BH2 0
INSTALLED ON INLET AND OUTLET PIPES
- 75mm MIN DIFFERENCE IN LEVEL BETWEEN BOTTOM
OF SEPTIC TANK OUTLET AND FINAL SURFACE AREA QBCC LICENCE NUMBER 150 556 72
OF AES BED TE2 ABN NUMBER 95268308955
9400
DRAINAGE: Phone: +61 400 301 364
- ∅100 uPVC DWV (MIN GRADE 1:60) UNLESS 3000L (min) ALL-WASTE Email: [email protected]
TE1 Web: www.taylorenviro.com.au
OTHERWISE NOTED SEPTIC TANK
24000
CARPORT BH1
WASTE WATER TREATMENT &
RAINWATER TANK
EFFLUENT DISPOSAL SYSTEM
BH3 14300
Ensure AES bed is installed AUTHORISED FOR ISSUE DATE
outside of the Riparian Buffer
Zone 23/04/2021
APPROVED
SLO
PE
13%
STREET ADDRESS
0
780 53 MARTINS ROAD, COOROY 4563
LOT & PLAN 4 RP852013
NAME OF CLIENT
NOOSA COUNCIL AES BED
ECO COTTAGES
COUNCIL
GRAVEL [9.6m x 4.17m] = 40m²
NOOSA SHIRE
PLUMBING SERVICES DRIVEWAY DESIGNER DATE
C. TAYLOR 23/04/2021
DRAWN DATE
PLUMBING & DRAINAGE ACT 2018 M. MAHONY 23/04/2021
DRAWING DETAILS
BH4
PART SITE PLAN
PLUMBING PERMIT NO PL21/0290 RIPARIAN BUFFER AREA SCALE
1:200
CLIENT REFERENCE #
JOB NUMBER REVISION DWG #
Date 30/8/2021 Officer TE211533 A SL2
Document Set ID: 21598877
Version: 1, Version Date: 30/08/2021
Page 9
REVISIONS
REV DATE SUBJECT AUTHORISED
RAISED CONNECTOR INSPECTION POINT COUPLINGS OFFSET ADAPTER A 23/04/2021 REVISION A C. TAYLOR
1350
LOW VENT TAYLOR ENVIRONMENTAL
4170
2820
INSPECTION POINT
300 9000 300
9600
QBCC LICENCE NUMBER 150 556 72
ABN NUMBER 95268308955
Phone: +61 400 301 364
Email: [email protected]
AES BED PLAN VIEW Web: www.taylorenviro.com.au
WASTE WATER TREATMENT &
EFFLUENT DISPOSAL SYSTEM
INSPECTION POINT LOW VENT
TOP SOIL/GRASS
APPROVED
APPROVED SAND AUTHORISED FOR ISSUE DATE
INSPECTION POINT
150 23/04/2021
BACK FILL
STREET ADDRESS
53 MARTINS ROAD, COOROY 4563
NOOSA COUNCIL 13% SLOPE
LOT & PLAN 4 RP852013
300
750
NAME OF CLIENT
150 ECO COTTAGES
300
PLUMBING SERVICES COUNCIL
NOOSA SHIRE
DESIGNER DATE
PLUMBING & DRAINAGE ACT 2018 C. TAYLOR 23/04/2021
RIP & SCARIFY 300mm DRAWN DATE
300 150 300 300 APPLY GYPSUM 1kg/m^2 M. MAHONY 23/04/2021
PLUMBING PERMIT NO PL21/0290 DRAWING DETAILS
1350 2820 Bed Plan & Section
SCALE
N/A
4170 CLIENT REFERENCE #
Date 30/8/2021 Officer JOB NUMBER REVISION DWG #
TE211533 A SL3
AES BED SECTION VIEW
Document Set ID: 21598877
Version: 1, Version Date: 30/08/2021
Page 10
SOIL CHARACTERISTICS GENERAL NOTES 100 LOW VENT INSTALL
WITH A MOSQUITO
PROOF STAINLESS
TEXTURE LIGHT CLAY 1. THE SYSTEM INSTALLER IS RESPONSIBLE TO ESTABLISH THE LOCATION, LEVELS AND DEPTHS OF ALL EXISTING SERVICES STEEL MESH. FIXED TO
ON-SITE PRIOR TO COMMENCING ANY WORKS
TURF ALL FINAL GRADES. NO DEEP
ROOTED PLANT MATERIALS ON SYSTEMS
BOLLARD REVISIONS
STRUCTURE STRONG OR OVERFILL AREAS
2. LOCATIONS AND SETOUT DIMENSIONS SHOWN ARE APPROXIMATE ONLY AND ARE TO BE CONFIRMED ON SITE. ELBOW LEVEL WITH REV DATE SUBJECT AUTHORISED
SOIL CATEGORY 5 3. ACCESS AND LAY DOWN AREAS ARE TO BE CONFIRMED BY THE SYSTEM INSTALLER TOP OF OFFSET
A 23/04/2021 REVISION A C. TAYLOR
150
ADAPTER
4. EXISTING BUILDINGS AND EXTERNAL STRUCTURES SHOWN ON THESE DRAWINGS ARE OBTAINED FROM THE AVAILABLE
INDICATIVE PERMEABILITY 0.12 - 0.5 m/DAY INFORMATION AND MAY NOT BE COMPLETE AND ACCURATE
5. ALL DIMENSIONS ARE IN MM U.N.O
DESIGN LOADING RATE 12 mm/DAY 6. NO TREES TO REMAIN WITHIN 2.0m OF AES FOOTPRINT 50mm - 100mm
GEOTEXTILE
7. PLUMBING AND DRAINAGE TO QLD PLUMBING & WASTEWATER ACT, AS / NZS 3500 FIBER WRAP
DESIGN VOLUME 8. ALL PIPE WORK TO AS / NZS 4020 LEVEL
9. ALL TANKS TO BE INSTALLED AND ANCHORED IN COMPLIANCE WITH THE MANUFACTURERS SPECIFICATIONS RANDOMLY
WATER SUPPLY RAIN WATER [120 L/P/DAY] 10. FLEXIBLE JOINTS ON ALL INSTALLED TANKS (AS / NZS 3500) ORIENTED FIBER
SLOPE
MAT
11. THERE SHALL BE NO CROSS CONNECTION BETWEEN ANY WASTEWATER / EFFLUENT PIPEWORK AND ANY POTABLE WATER
NUMBER OF BEDROOMS 2 BEDROOMS SUPPLY PIPEWORK ENVIRO - SEPTIC OFFSET
12. MINIMUM DISTANCE BETWEEN TANKS AND BUILDINGS TO BE MAINTAINED (AS/NZS 3500) ADAPTER
NUMBER OF PEOPLE 4 PEOPLE
13. USE ONLY A LICENSED DRAINER THAT HAS BEEN ACCREDITED BY THE AES SYSTEM SUPPLIER. THE SUPPLIER WILL NOT
PIPE
TAYLOR ENVIRONMENTAL
ORIGINAL SOIL
PROVIDE THE AES PIPES UNLESS THE LICENSED DRAINER HAS BEEN TRAINED AND ACCREDITED APPROVED SAND
TOTAL DESIGN VOLUME 480 L/DAY
14. AES PIPES MUST BE INSTALLED AS PER AES INSTALLATION INSTRUCTIONS.
DISPOSAL AREA 15. FINAL LOCATION OF AES BEDS AND ASSOCIATED PIPE WORK CAN ONLY BE ALTERED ON SITE TO MEET THE SITE CONDITIONS
AFTER APPROVAL FROM TAYLOR ENVIRONMENTAL (AUSTRALIA) PTY LTD
TOTAL DISPOSAL AREA 48.0 m² 16.
17.
GRADE ALL BATTERS EVENLY AT 1 IN 5, UNLESS NOTED OTHERWISE
ANY SOILS ENCOUNTERED WHICH SHOW EVIDENCE OF CONTAMINATION ARE TO BE STOCKPILED SEPARATELY. CONTAMINATED LOW VENT
TYPE OF FACILITY ADVANCED ENVIRO SEPTIC SOIL SHALL BE HANDLED IN ACCORDANCE WITH ALL WORKPLACE HEALTH & SAFETY AND ENVIRONMENTAL REGULATIONS
18. IT IS THE INSTALLERS RESPONSIBILITY TO PROVIDE ACCURATE 'AS CONSTRUCTED' DRAWINGS TO RELEVANT LOCAL 90 DEGREE ELBOW
TREATMENT PLANT APPROVAL 15 / 2019
AUTHORITY AND INCUR ASSOCIATED COST
TREATMENT LEVEL ADVANCED SECONDARY 19. ALL DISTURBED AREAS TO BE RE-GRASSED AND RECTIFIED
20. EXISTING TOPSOIL IS TO BE RETAINED AND SET ASIDE (WINDROWED) TO PREVENT DAMAGE FROM MACHINERY AND DO NOT INSERT PVC PIPE MORE THAN 100mm PVC PIPE
AES CALCULATOR OUTCOMES REDISTRIBUTED ONCE INSTALLATION IS COMPLETE 100MM INTO OFFSET ADAPTER
21. AT LEAST A 5 TONNE MACHINE WITH POSI-TRACK SYSTEM IS REQUIRED FOR EARTHWORKS TO ELIMINATE POTENTIAL TRACK
GRAVITY OR PUMPED GRAVITY INDENTATIONS INTO GROUND LEVEL
22. IT IS THE RESPONSIBILITY OF THE INSTALLER TO ENGAGE THE DESIGNER TO UNDERTAKE INSPECTIONS DURING INSTALLATION. OFFSET ADAPTER
NUMBER OF AES PIPE ROWS 2 FAILURE TO DO SO WILL RESULT IN THE FORM 8 / COMMISSIONING CERTIFICATE NOT BEING ABLE TO BE COMPLETED
END VIEW
LENGTH OF AES PIPE ROW 9m
INSTALLATION ELBOW LEVEL WITH TOP OF
OFFSET ADAPTER
NUMBER OF AES PIPES/ROW 3 GEOTEXTILE FIBER
2
WRAP
- IT IS THE INSTALLERS RESPONSIBILITY TO ENSURE THAT ALL COMPONENTS COMPLY WITH THESE GUIDES UPON
BUFFER CAPACITY 1272 L COMMISSIONING OF THIS SYSTEM RANDOMLY
ORIENTED FIBER QBCC LICENCE NUMBER 150 556 72
BILL OF QUANTITIES - ALL BURIED PIPE WORK IS TO BE IDENTIFIED WITH UNDERGROUND MARKING TAPE PLACED ABOVE THE PIPE WORK MAT ABN NUMBER 95268308955
- ALONG THE BOUNDARY OF THE LAND APPLICATION AREA THERE SHALL BE AT LEAST 2 WARNING SIGNS CLEARLY TOP VIEW ENVIRO-SEPTIC OFFSET
AES PIPES 6 VISIBLE TO ADVISE THAT RECYCLED WATER IS USED (EACH SIGN SHALL COMPLY WITH AS1319 AND HAVE THE ADAPTER Phone: +61 400 301 364
WORDING RECYCLED WATER - AVOID CONTACT DO NOT DRINK) Email: [email protected]
COUPLINGS [AESC] 4 Web: www.taylorenviro.com.au
OFFSET ADAPTOR [AESO] 4 MAINTENANCE SIDE VIEW
OXYGEN DEMAND VENT [AESODV] 1 - SEPTIC TANKS TO BE CHECKED FOR SOLIDS BUILD UP ANNUALLY
INSPECTION POINT BASE [AESIPB] 2 - SEPTIC TANKS TO PUMPED OUT IF 31 FULL OF SOLIDS OR 5 YEARS (WHICHEVER IS SOONER) RAISED CONNECTION WASTE WATER TREATMENT &
- LAND APPLICATION IS IMPORTANT AND IS TO BE REGULARLY MOWED AND ANIMALS AND VEHICLES EXCLUDED
CLEAN COURSE SAND 17 m² EFFLUENT DISPOSAL SYSTEM
AES FOOTPRINT
LENGTH WIDTH AREA AUTHORISED FOR ISSUE DATE
AES SYSTEM 9.6 m 1.35 m 13.0 m² 23/04/2021
EXTENSION AREA 9.6 m 2.82 m 27.0 m²
STREET ADDRESS
TOTAL 9.6 m 4.17 m 40.0 m² 53 MARTINS ROAD, COOROY 4563
LOT & PLAN 4 RP852013
NAME OF CLIENT
INSPECTION OPENING, SWIVEL KNUCKLE,
EXPANSION JOINT ON INLET AND OUTLET OF ECO COTTAGES
SEPTIC TANK COUNCIL
C:\Users\Chris\Downloads\CEA#15_2019_AES Advanced Secondary.png
NOOSA SHIRE
∅100 uPVC DWV TO AES BED DATE
DESIGNER
[MIN GRADE 1:60] AES BED C. TAYLOR 23/04/2021
GROUND 75mm MIN DIFFERENCE IN LEVEL
BETWEEN BOTTOM OF SEPTIC TANK DRAWN DATE
LEVEL
OUTLET AND FINAL SURFACE AREA OF M. MAHONY 23/04/2021
AES BED
DRAWING DETAILS
75 LOW VENT
50
MATERIALS
SCALE
N/A
∅100 uPVC DWV TO SEPTIC TANK CLIENT REFERENCE #
[MIN GRADE 1:60] SEPTIC TANK
REDUCED LEVELS
AES FSL 0.00 m
MIN INVERT OF SEPTIC OUTLET + 0.075 m
MIN INVERT OF SEPITC INLET + 0.05 m JOB NUMBER REVISION DWG #
MIN TOP OF SEPTIC TANK + 0.425 m
TE211533 A SL4
Document Set ID: 21598877
Version: 1, Version Date: 30/08/2021
Page 11
Appendix B Advanced Enviro-Septic Approved Calculator
Site and Soil Evaluation 53 Martins Road, Cooroy QLD 4563
Taylor Environmental (Australia) Pty Ltd Page 11 of 16
Document Set ID: 21598877
Version: 1, Version Date: 30/08/2021
Page 12
Advanced Enviro-septic Design Calculator V8.8 ©
Leader in Passive Solutions
Site
53 Martins Road Cooroy QLD 4563 State QLD Post Code 4563
Address
Client
MAIN BED Date of Site Visit
Name
Designer Lic
Designers Designers Ph
Chris Taylor | Director | Taylor Environmental (Aust) Mb,0400 301 364 Number 15055672
Name Number
Lic (eg.QBCC)
Plumber Ph Plumb / Drainer
Plumber TBA TBA TBA
Number Lic Number
Name
Council Designers AES
Sunshine Coast QLD00011 Date 23/4/21
Area Cert Number
This Calculator is a guide only, receiving soil classification, surface water, water tables and all other site constraints addressed by the qualified designer.
System Designers site and soil calculation data entry IMPORTANT NOTES
Enter AES L/m loading rate, "30" for ADV Secondary or "38" Secondary 30 >> This design is for an ADVANCED SECONDARY system
Is this a new installation Y or N Y >> Minimun single vent size is 80mm or 2 x 50mm house vents
Number of person 4 a septic tank outlet filter is NOT RECOMMENDED
Daily Design Flow Allowance Litre/Person/Day 120
Number of rows required to suit site constrants 2 >>The maximum length of a single AES pipe run is 30 meters
Infiltration surface Soil Cat as est by site/soil evaluation. CATEGORY 5 >> Catagory may require design considerations. Ref AS1547
Design Loading Rate based on site & soil evaluation DLR (mm/day) 12 >> Soil conditioning may be necessary. Ref AS1547 & Comments.
Bore log depth below system Basel area 600 >>Min depth below basel area 600mm check water table/restrictive layer
Enter System footprint Slope in % for std AES systems to calc extension 0
Is this design a gravity system with no outlet filter? Y or N y >> A House Vent & LOW VENT required on this system
PLEASE CHECK YOU HAVE FALL FROM TANK TO AES SYSTEM PIPES
40
COMMENTS :- " The outcome must be important to everyone. "
- Ripping of receiving surface required in clay soil structures in Cat 4,5,6. In addition refer to AS 1547. Always excavate & rip parallel to the site slope/AES pipe.
- Specialist soils advice & special design techniques will be required for clay dominated soil having dispersive or shrink/swell behaviour. Refer AS1547
- Plumbers are reminded that good construction techniques as per AS1547 are especilly important in these soil types. Refer AS1547 & AES installation Instructions
AES System Calculator Outcomes AES dimensions
Total System load - litres / day (Q). 480 l/d AES System System Extension
Min Length of AES pipe rows to treat loading 8.0 lm Lth m : (L) 9.6 9.6
Number of FULL AES Pipe lengths per row 3 lths Width m:(W) 1.35 2.82
Sand
Total Capacity of AES System pipe in Litres 1272 ltr. 0.75 0.15
Depth :
AES Additional infiltration extension required 27.0 m2 Area m2 13.0 27.0
USE CUT LENGTHS OF PIPE IN THIS DESIGN? (ENTER Y) y
IF YOU WISH TO USE A TRENCH EXTENSION DESIGN OPTION ENTER "Y" Enter Custom Width in metre
AES INFILTRATION FOOT PRINT AREA - L = Q / ( DLR x W) Length Width Minimum AES foot print required .
for this Basic Serial design is 9.6 x 4.17 = 40.0 m2 total
Code AES System Bill of Materials. Chankar Environmental Use Only
AES-PIPE AES 3 mtr Lths required 6 lths Digitally signed by
AESC AESC Couplings required 4 ea Steve Dennis
DN: cn=Steve
AESO AESO Offset adaptors 4 ea
Dennis, o=Chandar
AESODV AES Oxgen demand vent 1 ea Enviromental,
AES-IPB AES 100mm Inspection point base 2 ea
ou=Resign Review,
“Nature's Wastewater Solutions” email=designrevie
AES Equ AES Speed Flow Equaliser ea w@enviro-
AES DESO Double Offset Adaptors ea septic.com.au,
c=AU
TOTAL SYSTEM SAND REQUIRED (Guide Only) 17 m3
Date: 2021.04.23
PLEASE email your AES CALC and Drawings to 15:39:49 +10'00'
[email protected] [email protected]
> The AES Calculator is a design aid to allow checking of the AES components and configuration and is a guide only. Site and soil
conditions referencing the AS 1547 standard are calculated and designed by a Quailified Designer.
> Chankar Environmental has no responsibility for the soil evaluation, loading calculations or DLR entered by the designer for this calculator.
> AES pipes can be cut to length on site. They are supplied in 3 meter lths only.
AES-Design-V8.8-Calculator © Copy Right - Chankar Environmental pty ltd 14/3/2016
Document Set ID: 21598877
Version: 1, Version Date: 30/08/2021
Page 13
Appendix C Treatment Plant Approval
Site and Soil Evaluation 53 Martins Road, Cooroy QLD 4563
Taylor Environmental (Australia) Pty Ltd Page 13 of 16
Document Set ID: 21598877
Version: 1, Version Date: 30/08/2021
Page 14
TREATMENT PLANT APPROVAL 15/2019
Plumbing and Drainage Act 2018
Amendment No.1
Approval
1. The Advanced Enviro-septic (AES) (“the System”) described in the Specifications and
Drawings in the attached Schedule and manufactured by Presby Environmental Inc.
Whitefield, New Hampshire (“the manufacturer”) and supplied by Chankar
Environmental Pty Ltd (ACN 148 175 455) (“the supplier”) has been assessed in
accordance with the Queensland Plumbing and Wastewater Code (QPW Code) dated
15th January 2013.
2. The supplier applied to the Chief Executive on 12 February 2020 for an amendment to
the system as specified below.
3. Approval is granted for previous Condition 10, to be amended to state: ‘A septic tank
conforming to AS/NZS1546.1 and sized in accordance with AS/NZS1547 for the
influent hydraulic load from the dwelling is a component of the system’.
4. Approval is granted for an advanced secondary quality wastewater treatment system,
subject to compliance by the manufacturer/supplier with the requirements of the
Plumbing and Drainage Act 2018 and the conditions of approval detailed below.
5. This approval, the conditions of approval and the Schedule comprise the entire
Treatment Plant Approval document.
6. Any modification by the manufacturer/supplier to the design, drawings or
specifications scheduled to this approval must be approved by the Chief Executive.
Conditions of approval
7. The manufacture, installation, operation, service and maintenance of the systems
must be inconformity with the conditions of this Treatment Plant Approval.
8. The advanced secondary quality wastewater treatment system, which is an example
of the approved systems, may only be used on premises that generate per day:
a) a maximum hydraulic loading of 90L / 3 metre length of AES piping system
b) a maximum organic loading of 240mg/L BOD5
c) a maximum total suspended solids of 300mg/L.
9. The system must continue to meet the requirements of advanced secondary quality
wastewater treatment system, producing the following effluent quality —
a) 90% of the samples taken must have a BOD5 less than or equal to 10 g/m³
with no sample greater than 20 g/m³.
b) 90% of the samples taken must have total suspended solids less than or equal
to 10g/m³ with no sample greater than 20g/m³.
10. Each system must be serviced in accordance with the details supplied in the owner’s
operation and maintenance manual.
Treatment Plant Approval
Approved by: Lindsay Walker
Delegated Authority
Department of Housing & Public Works
Document Set ID: 21598877
Version: 1, Version Date: 30/08/2021
Page 15
11. The system design is based upon secondary quality effluent design loading rate as
defined in AS/NZ1547 using the AES Design Calculator prepared by a qualified
designer. System designs must be verified and signed by the supplier before being
submitted to the Local Government.
12. A septic tank conforming to AS/NZ 1546.1 and sized in accordance with AS/NZ 1547
for the influent hydraulic load from the dwelling is a component of the system. Waste
from the septic tank is to be diverted to the AES piping system prior to the system
sand and basal area. The septic tank that feeds into the system must be regularly
monitored and maintained (including de-sludging) in accordance with AS/NZ 1547 to
ensure optimum operation of the system.
13. When granting a compliance permit, the local government must satisfy itself that the
designer’s choice of the system configuration is optimal for the proposed use and site
conditions and that the effluent can be retained within the land application area.
14. Each application for a compliance permit to install a system must also be accompanied
by a copy of a completed Advanced Enviro-Septic Design Calculator Report endorsed
by the supplier, showing the footprint/basal area of the proposed system and number
of pipe modules for the site.
15. An inspection/sampling point must be installed permanently in the sand immediately
below the half-way point of the AES piping system. Where a system is installed in a
sloping basal area an additional inspection/sampling point must be installed at the
lowest point of the system extension.
16. Routine maintenance of the system at set intervals, other than septic tank sludge
levels, is not stipulated by the manufacturer/supplier. However, routine monitoring may
be required by the Local Government. In the event of failure of the system’s land
application area an AES authorised person may need to follow the rejuvenation
procedures set out in the manufacturer/supplier’s Design and Installation Manual.
17. Where a system installed at a site, has been found not to operate satisfactorily during
its service life, and as a result requires modification to achieve the required
performance requirements, in particular, water quality limits, the installed system is to
be modified accordingly. Any modifications including any of the supplier’s rejuvenation
procedure outcomes must be recorded on the service report.
18. Permitted use of the effluent is for sub-surface absorption only.
19. Each system must be supplied with —
(a) a copy of this Treatment Plant Approval document;
(b) details of the system;
(c) instructions for authorised persons for its installation;
(d) a copy of the owner’s manual to be given to the owner at the time of installation;
and
(e) detailed instructions for authorised service personal for its operation and
maintenance.
Treatment Plant Approval
Approved by: Lindsay Walker
Delegated Authority
Department of Housing & Public Works
Document Set ID: 21598877
Version: 1, Version Date: 30/08/2021
Page 16
20. At each anniversary of the Treatment Plant Approval date, the supplier must submit to
the Chief Executive a list of all systems installed in Queensland during the previous 12
months. Where the Chief Executive is notified of any system failures the Chief
Executive may randomly select a number of installed systems for audit. The Chief
Executive will notify the supplier’s nominated NATA accredited laboratory which
systems are to be audited for BOD5 and TSS. The sampling and testing of the
selected systems, if required, is to be done at the supplier’s expense. The following
results must be reported to the Chief Executive;
a) Address of premises;
b) Date inspected and sampled;
c) Sample identification number;
d) BOD5 for influent and effluent; and
e) TSS for influent and effluent.
21. The Chief Executive may, by written notice, cancel this approval if the
manufacturer/supplier fails —
a) to comply with one or more of the conditions of approval; or
b) within 30 days, to remedy a breach, for which a written notice been given by the
Chief Executive.
22. This approval may only be assigned with the prior written consent of the Chief
Executive.
23. This approval expires on 1 January 2024 unless cancelled earlier in accordance with
paragraph 21 above.
Lindsay Walker
Director Level 7,
63 George Street Brisbane
Plumbing, Drainage and Special Projects
Building Legislation and Policy GPO Box 2457, Brisbane Qld 4001
Date approved: 03 March 2020 Telephone +61 7 3008 2557
Facsimile +61 7 3237 1248
Website www.hpw.qld.gov.au
ABN 61 331 950 314
Treatment Plant Approval
Approved by: Lindsay Walker
Delegated Authority
Department of Housing & Public Works
Document Set ID: 21598877