Skip to the record
Accept no imitations.

Council archive · source document

07/0694 - Lot reconfiguration [As Published] · 152007.694

of 33

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

a

va

INTEGRATED PLANNING ACT 1997
Works in tidal areas, coastal

-—. -Mmanagement districts and-fish- habitat

areas

tf you answered YES to Q5, and ticked any

, boxes in Q6), your application is required to be
assessed against and must comply with the Wild
Rivers Code.

If you answered YES to Q5 and ticked box i) in
Q6, your application is required to be referred to
the EPA.

Nate: If specified works are proposed in a local -
govemment area, itis prescribed tidal work — the
felevant locatgovernment will be the
assessment manager with the EPA as a
concurrence agency

Ifyou answered YES to Q5, and ticked box ii) or
a us Q6, your application requires referral to

ty you answered NO: to Q§ and ticked box j) in
* Q6, the application will not be accepted. .

If you answered NO to Q5, ticked box ii} in Q6
and the development is necessary to install.
authorised works or infrastructure where a
development permit is not required, or if a
fequired permit is held, the application must be
assessed against and. must comply with:the Wild
Rivers Code. Applications for purposes other
than specified works or as described: above will
not be accepted,

Hyou answered NO at Q5 and ticked box iii) in
Q6, the application may ba made if the works are
-in aPA. These applications must be assessed
against and must comply with the Wild-Rivers
‘Code. The application will not be accepted if the
development fs proposed to be located in a HPA.

For more information about ‘specified works refer
to Guide 27
Residential, commercial or industrial
development
(fyou answered YES to Q7, your application is

not subject to wild river requirements. Provided
there are no other aspects of this development

* that requite assessment against the relevant wild

. fiver deciaration or Wild Rivers Code, you do not
- need to complete the remaining questions in
Section 2.
lf you answered NO to'Q7 and ticked either box
- i) or ti) in Q8, the assessing agency is the
felevant local goverment. The application must
be assessed against and must campy with the
Wild Rivers Code,

Animal husbandry activities

 Ityou answered YES to Q9 your application

fequires assessment against and must comply

with-the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for animal husbandry

activities will not be accepted if proposed ina

HPA. For more details and a definition of animal

« husbandry activities see the Wild Rivers Act
20085 and refer to Guide 27.

 

IDAS Assessment Checklist, Version 20, 2 April 2007

|5. Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide.27. __
~——~~Development ina wild tiver area)

Cino Clyes

6. The application is for one or more of the following:

{1 i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); Or

(7 ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1), Or

Oo iii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).

 

7. _ |s the application for residential, commercial or industrial development in a designated urban

area?
CINo Lyes

8. If NO, does the application for residential, commercial or industrial development involve:

(Ji) a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 1); or

oO ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).

9. Does the application involve a material change of use for animal husbandry activities (as defined
under the Wild Rivers Act 2005) in a PA?

, CIJNO | YES (ensure you have completed Part R of Form 1)

 

: Agricultural activities

Hfyou answered YES to Q10, your application
:fequires assessment against a and must comply
. With the Wild Rivers Code,
The assessing agency is NRW.
Note: Applications for agricultural activities wilt
not be accepted if proposed in a HPA. For more
: details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
2.

The production of fodder in a PA, and pasture
improvement using tow impact soil disturbance
* techniques is not an agricultural activity as

- defined under the Wild Rivers Act 2005. For
more information see Guide 27.

 

10. Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
aPA?

L)no

{71 YES (ensure you have completed Part Q of Form 1)

‘11. If YES is the application for:

oO i) a material change of use; or
oO ii) operational works.

Page 12

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0694 - Lot reconfiguration [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.