Council archive · source document
07/0694 - Lot reconfiguration [As Published] · 152007.694
*
we
a rene
INTEGRATED PLANNING ACT 1997
“ Works that take overland flow water
vit arta an
—: The retevant wild river declaration will state” ~~"
warks that take overland flow water are either
self assessable or assessable, or are exempt
from wild fiver fequirements.
Ifyou ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the-code.
Mfyou ticked Q13 ii) an apptication is not required
to be made however the works must comply with
the relevant setf-assessable section of the Wild
Rivers Code, otherwise the works become
$ assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code.
and must comply with the code.
tfyou ticked 013 iii) your application is not
7 Subject to wild river requirements. «
Applications for development that is ather than
, that stated to be assessable, self-assessable or
exempt will not be accepted.
. Works that interfere with overland
* flow water :
j The retevant wild river declaration will state
{ Works that interfere with overland flow water that
are either self assessable, assessable or exempt
from wild river requirements.
\fyou ticked Q15 i), your application must be -
> assessed by NRW against the Wild Rivers Code:
* and must comply with the code.
Ifyou ticked Q15 ii) an application is not required
4 to be made however the works must comply with
, the relevant self-assessable section of the Wild
_ Rivers Code, otherwise the works become
assessable development for which an application
“is required and.must be assessed by NRW
” against the relevant part of the Wild Rivers Code
+ and must compty with the code.
y lf you ticked Q15 fil) your application is not
Subject to wild river requirements.
Appiications for development that is other than
that stated to be assessable, self-assessable or
exernpt will not be accepted.
: Waterway barrler works
, Applications for building or raising waterway
* barrier works in a HPA will not be accepted.
Ifyou answered YES to Q16, your appfication
‘ must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
IDAS Assessment Checklist, Version 20, 2 April 2007
12. Does the application involve works that take overland flow water in a HPA or an FMA? __
S—ONo <o
13. If YES, is the application for works stated in the relevant wild river declaration to be?
(Ji) assessable works
(J ii) seif-assessable works
C1 iii) exempt works
im YES (ensure you have completed Part Ke of Form 1)
- 114. Does the application involve works that interfere with overland flow water in a FMA?
mie
15. IF YES, is the application for works stated in the relevant wild rivers declaration to be?
(Ji) assessable works
L ii seif-assessable works
(iil) exempt works
LJ YES (ensure you have completed Part Kio of Form 1)
16. Does the application involve building or raising waterway barrier works in a PA?
Oo NO oO YES (ensure you have completed Part Os of Form 1)
Aquaculture (non ERA)
; Applications for aquacutture in a HPA will not be
accepted,
Ifyou answered YES to Q17, your application
, Must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Works that interfere with water in a
watercourse
} Note: If the.development is proposed in a HPA,
applications for all works that interfere with water
* in a watercourse (including dams or weirs,
Stream realignment or stream diversion) will nat
«be accepted. .
tna PA, applications for instream dams'and
weirs may be accepted in nominated waterways.
If you ticked box ii} in Q19, your application will ,
not be accepted.
Note: Operational works outside a HPA or
nominated waterway are not subject to wild
fiver requirements.
More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website
www. new.didl.gov.aut or contacting the
department by email on:
17. Does the application involve aquaculture in a PA?
(no
(C1 YES (ensure you have completed Part Os of Form 1)
18, Does the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?
Ono
19. IFYES,
(.] i) The application is for an instream dam or weir; or
(J ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.
O YES (ensure you have completed the relevant Part K of Form 1)
_ Wild. [email protected].
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0694 - Lot reconfiguration [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.