Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

RFI 9.3.20 - L07 Add info Minor change · OPW19/0082

of 4

Text shows just the words. Original shows the document exactly as it was published.

 Page 2

2. Application details

As detailed above, all works are to be undertaken within Lot 2 and no works are proposed to be
undertaken in the common property. The applicants engineers indicate that all stormwater will be
contained in Lot 2 and effluent connected to existing systems on site. The existing vehicular access for
the site will be utilised with all car parking associated with the use located on Lot 2.


3. Proposal Report

The applicant submits revised proposal plans and engineering plans that detail all works being located
wholly within Lot 2. The revised the proposal plans detail:

       A reduction in the size of the proposed cabins
       Removal of the reception building
       Minor re-arrangement of cabin location
       All stormwater water works to be contained within Lot 2

Advice from Council dated 25th July 2013 states that a new site plan was approved as part of an
infrastructure agreement approved in April 2007. An extract of the approved site plan and the proposed
plan is detailed below:

2007 Approved Plan                              Proposal Plan




Differences between the proposal plans are detailed in the table below:

Used in these records

About this file

File size
575 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI 9.3.20 - L07 Add info Minor change.pdf · 575 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.