RFI 9.3.20 - L07 Add info Minor change · OPW19/0082
Page 2
2. Application details
As detailed above, all works are to be undertaken within Lot 2 and no works are proposed to be
undertaken in the common property. The applicants engineers indicate that all stormwater will be
contained in Lot 2 and effluent connected to existing systems on site. The existing vehicular access for
the site will be utilised with all car parking associated with the use located on Lot 2.
3. Proposal Report
The applicant submits revised proposal plans and engineering plans that detail all works being located
wholly within Lot 2. The revised the proposal plans detail:
A reduction in the size of the proposed cabins
Removal of the reception building
Minor re-arrangement of cabin location
All stormwater water works to be contained within Lot 2
Advice from Council dated 25th July 2013 states that a new site plan was approved as part of an
infrastructure agreement approved in April 2007. An extract of the approved site plan and the proposed
plan is detailed below:
2007 Approved Plan Proposal Plan
Differences between the proposal plans are detailed in the table below:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI 9.3.20 - L07 Add info Minor change.pdfRelated documentApplication case desk ↗
About this file
- File size
- 575 KB (small file)
- File type
No other editions are linked here.