10 The use is conducted in a manner that An Aquaculture Operations Management Plan
minimises risk of environmental harm. is attached as Appendix C.
6.4 Specific Outcomes and Solutions for the Earthworks Code
The slope, aspect and conditions of the site provide that earthworks will be confined
to dam construction. The implementation of the normal Conditions of approval will
alleviate any possible impacts of the earthworks.
6.5 Specific Outcomes and Solutions for the Erosion and Sediment Control
Code
The slope of the site towards the north boundary, the relatively minimal earthworks
and the absence of adjacent significant waterways provide for no unexpected issues
with respect to erosion and sediment.
The implementation of the normal Conditions of approval will alleviate any possible
impacts of the site works.
6.6 Specific Outcomes and Probable Solutions for the Biodiversity Overlay
Code
The overall outcomes sought from the Biodiversity Overlay Code include:
a) The natural resources are conserved.
b) The diversity of native flora and fauna and their habitats are maintained.
c) Wildlife corridors, vegetation links and riparian vegetation are conserved
and habilitated.
d) Management of any impacts upon vegetation.
Comment: The site is partially subject to "Environmental Protection" on the
Biodiversity Overlay map.
The development can be undertaken without impact upon the vegetation within this
area.
It is considered that the Reconfiguration of a Lot achieves compliance with the
Biodiversity Overlay Code.
6.7 Specific Outcomes and Probable Solutions for the Natural Hazard
Overlay Code
All agricultural uses are exempt.
10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.