Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

MCU12/0041 Development Application part 2 of 2 Plans and covering letters 429 Kennedys Rd Pomona

of 36

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (21.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
4.      STOCKING PROTOCOLS
        4.1 Stocking Protocols
Once fingerlings have reach the predetermined size for stocking and are
ready for stocking out, fingerlings would be collected from different
spawning troughs, for example, 500 from 5 different spawnings to make
up 2500 stocking at a particular site, therefore ensuring genetic diversity.




5.      FISH ESCAPE PREVENTION MEASURES
        5.1 Prevention Measures
A number of measures would be used to prevent fish escape from

production areas ofthe aquaculture enterprise. These would include:

     The use of screened stand pipes in the production ponds and tanks
     All ponds to be equipped with concrete drain sumps
     Further concrete drain sumps located prior to water reaching
     settlement ponds (diagram 1)allowing a fabricated net to be placed
     over outlet to ensure no fish escape.




6.      WATER MANAGEMENT AND REUSE
        6.1 Water Management
Water for the proposal would be sourced from the existing 5.67ha storage
dam. The supply for the storage dam originates in the adjacent state
forest and has passed tests for chemical contaminants. Bore water would
also be sourced for the proposal. The selected property has extensive
underground irrigation infrastructure and is capable of moving large
volumes of water throughout the property.
        6.2 Water Reuse
Water that has passed through production ponds etc would be collected in

specific settlement ponds. This water would then be reused for irrigation
of pasture land and fodder crops. The water would also have the potential
to be used back in the plankton ponds to stimulate blooms for larval

feeding.




                    Prepared for Aquaculture Extension Officer
         Department of Employment, Economic Development and Innovation
                                 18 February 2012
                               By Darren Knowles
Log in to download the original file

MCU12_0041 Development Application part 2 of 2 Plans and covering letters 429 Kennedys Rd Pomona.pdf · 21.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.