Original source · versioned page text
Pensar Environmental & Waste Management Plan
Plans and drawings: the text below has words only, no drawings.
Environmental Management Plan
Table of Contents
EMP Review Process 3
1. Introduction 5
1.1 Purpose of this Plan 5
1.2 Pensar Environmental Management System Requirements 5
1.3 Control of Copies 5
1.4 Statutory Requirements 5
1.5 Project Scope 6
1.6 Project Environmental Objectives and Targets 6
1.7 Environmental Aspect Identification & Risk Assessment 7
2. Project Specific Data 7
2.1 Measuring Equipment 7
3. Site Environmental Management Requirements 8
3.1 Environmental Control Measures 8
3.2 Consultation with other Stakeholders 8
3.3 Hazardous Substances 8
3.4 Training 9
3.5 Site Access 9
3.6 Erosion and Sediment Control Plans 9
3.7 Water Management 10
3.8 Waste Management 10
4. Monitoring and Review 12
5. Incident and Emergency Management 12
5.1 Incident Reporting and Investigation 12
6. Document Control (for template) 15
List of Appendices
Table of Environmental Aspects/Environmental Risk Assessment 13
Significant Environmental Aspects and Impacts 13
Environmental Management Procedure 14
Environmental Management Plan (ENV-PLN-001-G20-010) April 2019, Rev: 10
215 David Low Way, Peregian Beach/ G20-010 Page 2 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original