Environmental Management Plan
EMP Review Process
The Environmental Management Plan (EMP) must be reviewed after any of the following:
• Changes to the scope of works or if there are any:
• Changes to the design that create additional safety risks;
• Changes to relevant legislation, Codes of Practice or industry standards;
• Changes to the Client’s Environmental Systems;
• Environmental alerts from external bodies that are relevant to the scope of works;
• After Environmental incidents, not limited to the project, where internal system changes are
implemented.
Any additional risks must be documented on the project risk assessment (WHS-RA-003), which is filed
with the WHSMP.
The Project Manager (PM) is responsible for ensuring that any changes to the EMP are communicated
to the members of the Project Management Team (PMT) and relevant workers and subcontractors.
This communication is to be recorded on the toolbox meeting record (WHS-FRM-014) and kept in: Folder
9: Minutes (Refer to PMP, Section 1.3 Folder Structure: Site Office”)
EMP REVIEW
Changes Reviewed
Project Relevant
Rev Reason for Changes made workers
Date Mgt. Status
No. Review and sub- By
(if applicable) Team
contractor whom
Y/N Y/N
A 25/11/201 Initial Draft – Nil – Initial Draft Y N/A RV Closed
9 Issued for
Review
Environmental Management Plan (ENV-PLN-001-G20-010) April 2019, Rev: 10
215 David Low Way, Peregian Beach/ G20-010 Page 3 of 15