Pensar Environmental & Waste Management Plan
Plans and drawings: the text below has words only, no drawings.
Environmental Management Plan
Queensland’s Waste Reduction and
Environmental Protection (Air) Policy 2008
Recycling Strategy 2010-2020
Environmental Protection (Noise) Policy 2008 Environmental Protection (Water) Policy 2009
Biosecurity Act 2014 Water Act 2000
Water Regulation 2016
In addition to the above requirements, the following references have also been addressed in development
of this plan:
• Pensar Integrated Management System Manual (IMS Manual).
• Industry Codes of Practice
• Advisory Standards / Codes of Practice (e.g. ‘Best Practice Erosion & Sediment Control for
building & construction sites’ Nov 2008 – International Erosion Control Association of
Australasia)
• Local government specific laws
• Client contract and/or site specific requirements.
• Pensar aspects and impacts table
- As Principal Contractor, Pensar is responsible for ensuring that all persons on site maintain at all
times a responsible attitude towards environmental management and always act in a manner that
strives to prevent significant environmental impact, and should environmental harm occur,
minimizes the potential for environmental impact – this includes all Pensar employees, employees
of subcontractors and suppliers, and visitors.
1.5 Project Scope
The project scope is defined in the Project Management Plan (PMP), section 2.1
The scope of works for 215 David Low Way, Peregian Beach, includes all design related aspects from
initial conception to issuing of for construction plans, production of as constructed documentation and
final submission to Council (including plan sealing and cadastral survey set out and registering of
properties). In summary the design aspects includes;
• Full Civil Construction design (bulk earthworks stormwater, sewerage, water reticulation,
roadway, etc.)
• Electrical Design including conduit alignment, pit locations, cabling details, location of pad mount
transformers, property connections any additional electrical fixtures;
• Landscaping Design including all revegetation works in accordance with Sunshine Coast
Regional Council’s Development Approval.
1.6 Project Environmental Objectives and Targets
The following environmental objectives and targets apply to this project:
• There will be no significant environmental impact. All environmental aspects and impacts are
identified, and control measures implemented, to minimise the potential for environmental harm.
This is achieved by using the Table of Environmental Aspects / Environmental Risk Assessment
(Appendix A).
• All personnel on the project site at any time are to be fully inducted and adequately briefed on
company and site specific environmental requirements. This includes employees of sub-
contractors and suppliers.
• There will be NIL environmental infringement notices.
Environmental Management Plan (ENV-PLN-001-G20-010) April 2019, Rev: 10
215 David Low Way, Peregian Beach/ G20-010 Page 6 of 15