Council archive · source document
Decision Notice - 010.2009.00001658.001 [As Published] · 142009.1658
2009/1658
Plan / Document Rev. Plan / Document Name Date
No.
09/179-1 Working DRG - John Norden and November 2009
Associates
208014PW C PWC Dock Section – Oz Dock 15/02/06
208014EX B PWC Dock Extension Section – Oz 27/04/04
Dock
2. Structures shall be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall.
3. The existing jetty structure shall be removed.
4. The jetty shall have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the
revetment wall.
5. A rigid handrail shall be fitted on one side of the walkway.
6. No posts or vertical supports of the proposed jetty are to extend vertically from the structure
unless they provide support for the handrail.
7. The boat lifting device is to be located in conjunction with the approved jetty and shall not
extend beyond the end of the approved jetty and with an overall width no greater than 2.0m.
8. There shall be no electrical reticulation system carrying electricity in excess of 24 volts beyond
the revetment wall.
9. Lighting associated with the use shall be designed, installed, operated, and maintained in
accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
10. Rock scour protection, wrapped in geotextile, extends 750mm from the face of the revetment
wall in this locality. Piles are to be located clear of this rock protection.
11. The jetty and boatlift is to be used for private purposes only with no commercial operations to
be undertaken.
12. Boat repair activities will not be permitted on site.
13. Wastewater and sullage shall only be disposed of at approved pumpout facilities.
14. The mooring facility shall not be utilised for live-aboard purposes.
15. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
(1994) and the Environmental Protection (Water) Policy 1997.
16. The approval or conditions do not constitute a ruling on structural safety and the applicant
must make their own arrangement to ensure adequacy of design and work. Also any approval
granted does not warrant that such plans and specifications have been checked in detail, nor
does it absolve the owner of the land from complying with all the conditions of this approval
and/or relevant Council By-Laws and Policies and/or relevant statues and/or statutory
regulations in the execution and/or performance of said works. The Council does not accept
any responsibility for the accuracy of such plans and specifications as approved.
17. Certification by a Registered Professional Engineer of Queensland that states that the jetty
and boat lift are constructed in accordance with best practice methods and are structurally
sound shall be submitted to Council prior to the return of any bond monies held by Council. A
final inspection and approval of the structures by Council’s Inspector is also required prior to
the return of any bond monies held by Council. Please contact Council’s Land Development
Section to arrange the inspection.
Page 2 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2009.00001658.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 56 KB (small file)
- File type
No other editions are linked here.