Decision Notice - 010.2009.00001658.001 [As Published] · 142009.1658

of 6

Text shows just the words. Original shows the document exactly as it was published.

                                                                                          2009/1658



18.     The Development Permit for Operational Works (Jetty and boatlift) lapses if the works have
        not been completed by 3 February 2012, unless an application to extend the relevant period
        is approved by Council.
19.     The jetty shall be licensed with the Council upon completion of the structural work and shall be
        licensed annually thereafter

5       REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger               Referral Status   Referral Agency        Referral Address

 Not applicable.

6       APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.        Rev.     Plan / Document Name                      Date
                                     Working DRG - John Norden and             November 2009
                                     Associates
 208014PW                   C        PWC Dock Section – Oz Dock                15/02/06
 208014EX                   B        PWC Dock Extension Section – Oz           27/04/04
                                     Dock

7       ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. Should any changes or modifications to the approved plans be required as a result of
   construction constraints, a Change to an Existing Approval Application under the Integrated
   Planning Act must be made. Amended plans clearly indicating the changes must be lodged with
   this application along with the appropriate fees.
2. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
   Local Law No. 12, prevents a builder or building contractor carrying out building work on a
   building site in a way that makes or causes audible noise to be made from the building work:-
      2.1. On a Sunday or public holiday, at any time; or
      2.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
      A maximum penalty of $1,500 applies to an offence under this legislation.
3. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the
   cost of operational works exceeds $80,000, then a portable long service leave levy is required to
   be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved
   form issued by the Building and Construction Industry (Portable Long Service Leave) Authority
   that confirms that the requirements of the Act have been satisfied. A statutory declaration
   outlining the cost of the operational works must be submitted to Council prior to commencement
   of work
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).

                                                                                       Page 3 of 6

Used in these records

About this file

File size
56 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2009.00001658.001 [As Published].pdf · 56 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.