2009/578
09007 S0.03 A Bulk Earthworks – Building Platform 25 May 2009
Plan – Blakeney Munns Consulting
Engineers
09007 S0.04 A Temporary Piled Retaining Wall Details 25 May 2009
– Blakeney Munns Consulting
Engineers
09007 S0.05 A Site Layout Plan – Blakeney Munns 26 May 2009
Consulting Engineers
09007 S0.06 A Site Layout Plan Stormwater Services – 25 May 2009
Blakeney Munns Consulting Engineers
09007 S0.07 A New Driveway Layout & Section Incl. 29 May 2009
External Works – Blakeney Munns
Consulting Engineers
09007 S0.08 A Entry Retaining Wall Details – Blakeney 25 May 2009
Munns Consulting Engineers
ETC 09-0715 01 Traffic Control Plan 1 – Evolution Traffic 25 May 2009
Control
19. The works shall be carried out in accordance with the Construction Management Plan as
prepared by Blakeney Munz Consulting Engineers.
20. All construction works on site shall be in accordance with the recommendations and onsite
instruction by Morrison Geotechnic or a certified geotechnical engineer approved by Council.
An experienced geotechnical engineer is required to be on site for the whole of the time during
any excavation and house foundations. Such work shall only be carried out during dry weather
conditions. The geotechnical engineer shall also inspect the site periodically throughout the
construction of the dwelling and certify the stability of the structure upon its completion.
Should any risk of sand movement occur - all work shall be suspended until steps (approved
by the Geotechnical engineer in conjunction with Council’s Manager of Building Services)
have been taken to ensure that no further slippage or sand movement will result.
21. At the completion of construction the consulting geotechnical engineer will certify that all works
were carried out in accordance with their recommendations and that all structures and the site
are stable. A copy of this certification shall be submitted to Council to be placed on Council
records.
22. Access to the site shall be constructed such that vehicles do not ‘scrape’ the pavement whilst
entering or leaving the site.
23. Roof and surface runoff connection to Council’s kerb and channel/drainage system shall be as
shown on drawing No. 09007-S0.01A. Kerb adaptors shall be used in the kerb.
24. The Traffic Management Plan (TMP) Plan No ETC 09-0715 by Evolution Traffic Control for the
development addressing all construction phases shall be supported by documentation
prepared by suitably qualified persons and submitted to Council for approval prior to the pre
start meeting. The documentation shall address, but not be limited to, all items listed below,
and shall be flexible in that it addresses all stages of the development:-
24.1 A single nominated access location to and from the site.
24.2 The plan should detail the routing of trucks to and from the site, bearing in mind the
load limit on Park Road of 9 tonnes.
24.3 Provision of onsite parking for personnel working on this development, as there is
limited parking available in adjacent streets.
Page 3 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001AB810.001.pdfRelated documentPublic source context ↗
Decision Notice - 010.2009.00000578.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 66 KB (small file)
- File type
No other editions are linked here.