                                                                                         2009/578



      09007 S0.03                A       Bulk Earthworks – Building Platform          25 May 2009
                                         Plan – Blakeney Munns Consulting
                                         Engineers
      09007 S0.04                A       Temporary Piled Retaining Wall Details       25 May 2009
                                         –    Blakeney    Munns     Consulting
                                         Engineers
      09007 S0.05                A       Site Layout Plan – Blakeney Munns            26 May 2009
                                         Consulting Engineers
      09007 S0.06                A       Site Layout Plan Stormwater Services –       25 May 2009
                                         Blakeney Munns Consulting Engineers
      09007 S0.07                A       New Driveway Layout & Section Incl.          29 May 2009
                                         External Works – Blakeney Munns
                                         Consulting Engineers
      09007 S0.08                A       Entry Retaining Wall Details – Blakeney      25 May 2009
                                         Munns Consulting Engineers
      ETC 09-0715                01      Traffic Control Plan 1 – Evolution Traffic   25 May 2009
                                         Control

19.   The works shall be carried out in accordance with the Construction Management Plan as
      prepared by Blakeney Munz Consulting Engineers.
20.   All construction works on site shall be in accordance with the recommendations and onsite
      instruction by Morrison Geotechnic or a certified geotechnical engineer approved by Council.
      An experienced geotechnical engineer is required to be on site for the whole of the time during
      any excavation and house foundations. Such work shall only be carried out during dry weather
      conditions. The geotechnical engineer shall also inspect the site periodically throughout the
      construction of the dwelling and certify the stability of the structure upon its completion.
      Should any risk of sand movement occur - all work shall be suspended until steps (approved
      by the Geotechnical engineer in conjunction with Council’s Manager of Building Services)
      have been taken to ensure that no further slippage or sand movement will result.
21.   At the completion of construction the consulting geotechnical engineer will certify that all works
      were carried out in accordance with their recommendations and that all structures and the site
      are stable. A copy of this certification shall be submitted to Council to be placed on Council
      records.
22.   Access to the site shall be constructed such that vehicles do not ‘scrape’ the pavement whilst
      entering or leaving the site.
23.   Roof and surface runoff connection to Council’s kerb and channel/drainage system shall be as
      shown on drawing No. 09007-S0.01A. Kerb adaptors shall be used in the kerb.
24.   The Traffic Management Plan (TMP) Plan No ETC 09-0715 by Evolution Traffic Control for the
      development addressing all construction phases shall be supported by documentation
      prepared by suitably qualified persons and submitted to Council for approval prior to the pre
      start meeting. The documentation shall address, but not be limited to, all items listed below,
      and shall be flexible in that it addresses all stages of the development:-
      24.1    A single nominated access location to and from the site.
      24.2   The plan should detail the routing of trucks to and from the site, bearing in mind the
             load limit on Park Road of 9 tonnes.
      24.3   Provision of onsite parking for personnel working on this development, as there is
             limited parking available in adjacent streets.

                                                                                       Page 3 of 9

Used in these records

About this file

File size
66 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001AB810.001.pdf · 66 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.