Attachment D - SDAP Module-10-

of 15

Page text shows just the words. Original shows the document exactly as it was published.

Performance outcomes                            Acceptable outcomes                                             Response   Comment
    alternative exists
(3) coastal protection work or work
    necessary to protect coastal
    resources or physical coastal
    processes.


Table 10.1.2: Operational work
Performance outcomes                            Acceptable outcomes                                             Response   Comment
PO1 Tidal works that is private marine          AO1.1 The location and design of tidal works that is
development does not result in adverse          private marine development:
impacts to tidal land.                          (1) is on private land abutting state tidal land and used
Editor’s note: In addressing this performance        for property access purposes
outcome, the applicant should also have         (2) occupies the minimum area reasonably required for
regard to requirements for private marine
                                                     its designed purpose
development in the prescribed tidal works
code in the Coastal Protection and              (3) is not to be roofed or otherwise covered
Management Regulation 2003.                     (4) does not require the construction of coastal protection
                                                     works, riverbank hardening or dredging for marine
Editor’s note; Applications should be                access
supported by a report certified by an RPEQ to
                                                (5) does not adversely impact on public safety or public
demonstrate compliance with this performance
outcome.                                             access and use of the foreshore.
PO2 Development does not result in the          No acceptable outcome prescribed.
disposal of material dredged from an
artificial waterway into coastal waters,
with the exception of:
(1) reclamation works, or
(2) coastal protection works, or
(3) the maintenance of an existing
      artificial waterway and the at-sea
      disposal of material that has
      previously been approved for the
      waterway.
PO3 Development includes and complies           AO3.1 A dredge management plan for the development:
with a dredge management plan that              (1) directs the operation of the development
demonstrates how environmental                  (2) identifies disposal methods and disposal sites for the
impacts will be managed and mitigated,              removed material for the construction and operational
and how the requirements of the National            phases of the development
Assessment Guidelines for Dredging,             (3) outlines how any adverse effects from extraction
Australia Government Department of the              activities on sediment transport processes and/or
Environment, Water, Heritage and the                adjacent coastal landforms will be mitigated or
Arts, 2009 will be met.                             otherwise remediated by suitably planned and


State development assessment provisions                                        Module 10 — Coastal protection                 21 June 2013   Page 12 of 15
10.1 Tidal works, or development in a coastal management district state code
Log in to download the original file

Attachment D - SDAP Module-10-.pdf · 82 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.