Condition 11 Security in the form of a cash bond or trading bank guarantee to the sum of
$20,000 must be submitted, to secure performance of all conditions of this
approval, prior to the issue of a Development Permit for operational works.
The cash bond or bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by council in respect of
enforcing performance of this permit.
Representation: A review of recently approved duplex dwelling bond amounts was
undertaken. In this regard the following is noted:
- allowance of $5,000 bond where the proposal complies with
critical developments aspects such as height, GFA or setbacks.
- Implementation of $15,000 bond where critical development
aspects such as height, roof terraces or setbacks are modified.
Examples of this approach include:
- 2008 / 0203 – Duplex at 5 Bluefin Court, Noosaville - $5,000; and
- 2007 / 2357 – Duplex at 20 Belmore Tce, Sunshine Beach -
$15,000.
The first example cited complied with all relevant requirements of the
planning scheme, whereas the second proposed duplex did not comply with
the roofing provisions of the Noosa Plan.
Given the proposal now complies with all aspects of the relevant planning
scheme, it is not considered reasonable nor relevant to require the applicant
to provide a $20,000 bond. Further, Council staff are requested to consider
the additional cost implications of this higher bond amount.
Amended
Condition11: Security in the form of a cash bond or trading bank guarantee to the sum of
$5,000 must be submitted, to secure performance of all conditions of this
approval, prior to the issue of a Development Permit for operational works.
The cash bond or bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by council in respect of
enforcing performance of this permit.
Condition 20 The “guest” spaces shown on drawing number SK 1.1 prepared by Sparks
st
Architects and dated 31 January 2008 are to be relocated and aligned such
that vehicles can access the space in a forward gear, reverse out and exit the
site in a forward gear in a total of 3 movements. The applicant shall
demonstrate compliance by illustrating the vehicle paths on the plans
submitted for both Operational Works approval and building approval.
Representation: The titling of spaces located towards the frontage of the site as ‘guest
parking’ has been done so in error. Consistent with the Preliminary Approval,
the applicant seeks to provide guest parking in tandem with the lock-up
garages. Accordingly, please find attached plans detailing the compliance of
these spaces with the relevant Australian Standards.
Amended
Condition 20: All nominated visitor parking spaces shall be aligned such that vehicles can
access the space in a forward gear, reverse out and exit the site in a forward
gear in a total of 3 movements.
Condition 37 To ensure that polluted run-off does not enter Councils stormwater drainage
system, stormwater run-off from the carparking areas and the driveways shall
have the first flush (the first 12mm of rainfall or hose down) collected in a
grease/oil arrestor/gross pollutant trap provided on site prior to being
permitted to discharge into council’s drainage system.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Representations Received [As Published]Related documentApplication case desk ↗
About this file
- File size
- 19 KB (small file)
- File type
No other editions are linked here.