All other clean stormwater, such as roof water, can be collected on site and
discharged through a single underground drain line directly into the existing
drainage system, by bypassing the grease/oil arrestor/gross pollutant trap.
To this end, a detailed maintenance plan shall be prepared for the proposed
grease/oil/arrestor/gross pollutant trap, which shall be submitted to the
council for approval prior to obtaining a development permit for Operational
Works.
The approved maintenance plan shall be incorporated in the Community
Management Scheme for the development sand a copy of this shall be
provided for Council’s records prior to commencement of the approved Use.
A Development Permit for Building Works shall not be granted until a
Development Permit for Operational Works has been issued in regard to the
drainage scheme.
Representation: The requirement to install a grease / oil arrestor on the subject site is not
considered reasonable nor relevant to the proposal. In this regard the
applicant seeks only to construct two residential premises, which in
accordance with Council’s car parking provisions generate an average of
three vehicles in total (ie. 2 residents + 1 guest). Further, it is noted that the
residential parking areas are entirely covered and therefore will not be
subjected to rainfall.
The applicant appreciates the need for the inclusion of a grease / oil arrestor
in commercial and/or higher density residential developments given the high
number of cars accessing the premises. However the requirement to provide
this expensive and maintenance intensive facility on the subject site is
considered completely irrelevant and unnecessary additional cost to the
development process.
Amended
Condition 45: Delete
Condition 45 A registered easement shall be created over the zone of influence of all
sewers within the subject site and over those parts of the subject site that are
impacted upon by sewers on any adjoining sites. The easements shall
generally be parallel to and centred over the sewer main and be equivalent in
width to twice the depth to invert level of the sewer at the deepest point within
the allotment (measured from the finished surface) and to be no less than
3.0m wide overall. In this regard a licensed surveyor shall accurately locate
all sewer mains and determine the necessary width of the easement, which
shall be shown on any plans submitted for Operational Works / Building
Works approval. To this extent the surveyor shall certify that the sewer and
the zone of influence is wholly contained within the easement to be created.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an
appropriate undertaking in writing that the Title Deed and the easement
documents will be lodged at the Land Titles Office and any additional Titles
Office forms or requestions requiring the consent of the Council will be
attended to promptly.
A duly executed copy of the easement shall be submitted to council for
perusal prior to the use commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
Representation: Given the sewer line is located largely within Council property and the
neighbouring property, the applicant has been required to rely on Council
data with regard to its location and invert level. Should these records be
incorrect and the zone of influence be greater than that currently detailed, the
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Representations Received [As Published]Related documentApplication case desk ↗
About this file
- File size
- 19 KB (small file)
- File type
No other editions are linked here.