Geotechnical Report

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

LINDSAY CONSULTING PTY LTD                                                   -


STRUCTURAL AND CIVIL ENGINEERS
ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED
AS TRUSTEE FOR THE LINDSAY FAMILY TRUST



Ref: 231061
16th November 2023

Pools by Design



Attn Gary,
                          GEOTECHNICAL INVESTIGATION FOR
                          PROPOSED POOL
                          5 SEAMIST COURT, SUNSHINE BEACH

We have been engaged to carry out a Geotechnical Stability Review for the above
project. The purpose of the review is to

      •      Identify existing soil types and profiles,
      •      Determine existing soil parameters for the proposed development,
      •      Evaluate site conditions and any affect these site conditions have on the
             proposed development, and
      •      Comment on the Geotechnical Slope Stability of the allotment, existing and post
             construction.

Standards and references used in carrying out the Geotechnical Stability Review include
but are not limited to the following:-

      •      AS 1289 - Methods of testing Soils for Engineering Purposes
      •      AS 1726 - Geotechnical Site Investigations
      •      AS 2870 - Residential Slabs and Footings – Construction
      •      AS 3798 - Guidelines on Earthworks for Commercial and Residential
             developments
      •      Australian Geomechanic Society Practice Note Guidelines for Landslide Risk
             Management 2007
      •      Lindsay Consulting Pty Ltd Design Drawings 231061--PL1 to PL3 inclusive
      •      Lindsay Consulting Pty Ltd site classification report 231061

METHOD AND SCOPE OF INVESTIGATION

Fieldwork for the investigation was carried out by Lindsay Consulting Pty Ltd staff
using a truck mounted drill rig with additional testing carried out by hand. Samples of
soils from the site were taken to Lindsay Consulting Pty Ltd’s laboratory and tested in
accordance with the applicable standards.

QUALIFICATIONS OF COMPANY AND COMPETENT PERSONS

Staff utilized in the preparation of the work includes Mr. Jason Lindsay (RPEQ 4928) a
Civil Engineer whom has worked as a Civil, Structural, and Geotechnical engineer since
1990 performing geotechnical evaluation during his employment with John Wilson and
Partners Tewantin Office which was attached to the John Wilson and Partners Soils and

Off. 2C/82 Parker St, Maroochydore 4558
OFFICE: (07) 54 792 118 MOBILE: 0412 313 645 FAX: (07) 54 510 118
E-MAIL: [email protected]
Log in to download the original file

Geotechnical Report.pdf · 4.9 MB (large file)

The download may take up to a minute.

Full text of the other 38 pages

Page 2

LINDSAY CONSULTING PTY LTD                                                -


STRUCTURAL AND CIVIL ENGINEERS
ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED
AS TRUSTEE FOR THE LINDSAY FAMILY TRUST



Materials Laboratory. In his over 30 year experience Mr. Lindsay has carried out over
ten thousand site and soil evaluations including site classifications in accordance with
AS2870 and geotechnical evaluations for stability on many of these sites.

Field work is carried out by Mr Nathan McFadden in accordance with the above
Australian Standards. Mr Fadden has worked in the engineering field as a soil and site
evaluator or over 15 years, the last 9 years with Lindsay Consulting. Previously Mr
McFadden worked for a NATA registered laboratory carrying out field and laboratory
testing to NATA approved standards for major and minor civil work projects

SITE GEOLOGY

From the borelogging carried out over the site (refer attached Site Classification Report)
the site consists of a consists of peat/clayey sand, overlying sand loose becoming dense
with depth.

The residence is located on dunal area above the Dolphin Bay reserve with the area
falling from the residence towards the reserve. The area to the rear of the residence is
heavily treed with a heavy undergrowth.




Off. 2C/82 Parker St, Maroochydore 4558
OFFICE: (07) 54 792 118 MOBILE: 0412 313 645 FAX: (07) 54 510 118
E-MAIL: [email protected]

Page 3

LINDSAY CONSULTING PTY LTD                                          -


STRUCTURAL AND CIVIL ENGINEERS
ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED
AS TRUSTEE FOR THE LINDSAY FAMILY TRUST




Off. 2C/82 Parker St, Maroochydore 4558
OFFICE: (07) 54 792 118 MOBILE: 0412 313 645 FAX: (07) 54 510 118
E-MAIL: [email protected]

Page 4

LINDSAY CONSULTING PTY LTD                                          -


STRUCTURAL AND CIVIL ENGINEERS
ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED
AS TRUSTEE FOR THE LINDSAY FAMILY TRUST




Off. 2C/82 Parker St, Maroochydore 4558
OFFICE: (07) 54 792 118 MOBILE: 0412 313 645 FAX: (07) 54 510 118
E-MAIL: [email protected]

Page 5

LINDSAY CONSULTING PTY LTD                                                  -


STRUCTURAL AND CIVIL ENGINEERS
ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED
AS TRUSTEE FOR THE LINDSAY FAMILY TRUST



No groundwater was observed during the testing or inspection of the site, however,
possible seasonal water tables or seepage may be possible along the unweathered rock
layer.

STABLITY CONSIDERATIONS

The level of excavation intended over the site leads Lindsay Consulting Pty Ltd to
believe that the stability of the site will be suitable for this type of construction.

There were no signs of instability on the allotment. The location of the pool on this slope
does not in our opinion lead us to believe that slope stability will be a concern. DUE
TO THE NATURE OF THE SITE, ORGANIC PEAT MATERIAL OVER
LOOSE SANDS LINDSAY CONSULTING PTY LTD RECOMEND THE
PROVISION OF SCREW PILES INTO THE DENSE SAND MATERIALS
UNDER.

A landslip Hazard Frequency analysis has been carried out for the site and the proposed
works, refer Appendix E, and we conclude there is a low risk of site instability with the
pool located in its proposed location. The low risk of instability as defined in the
guidelines in the attached appendix does not exclude slope stability problems, only that
in Lindsay Consulting Pty Ltd’s opinion that the risk is low and may be management
through good hillside practises.

In our professional opinion, the present site conditions along with the proposed
earthworks detailed on the drawings specified previously do not pose a slope stability
issue with the site including associated buildings and infrastructure and that the stability
of the site will be maintained during both the construction and operational life of the
development. As such the works proposed, when carried out in a capable manner will
not lead to a slope stability problem.

Lindsay Consulting Pty Ltd further certifies that at the time of this report there were
no signs of stability issues with adjoining lands and as such the site is not subject to
risk of landslip activity originating from these other land. Lindsay Consulting Pty Ltd
clarify this statement in that any adjoining works or changes to existing works on
adjoining lands must be carried out in a professional manner and in accordance with
good hillside practices so as to not affect the stability of the adjoining land which may
inturn affect the stability of the subject allotment.

Should you require any further information please do not hesitate to contact me at the
above address.

On and Behalf of
LINDSAY CONSULTING PTY LTD



Jason Lindsay
RPEQ


Off. 2C/82 Parker St, Maroochydore 4558
OFFICE: (07) 54 792 118 MOBILE: 0412 313 645 FAX: (07) 54 510 118
E-MAIL: [email protected]

Page 6

LINDSAY CONSULTING PTY LTD                                          -


STRUCTURAL AND CIVIL ENGINEERS
ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED
AS TRUSTEE FOR THE LINDSAY FAMILY TRUST




     APPENDIX A – ENGINEERING DESIGN DRAWINGS
                    AND SOIL TEST




Off. 2C/82 Parker St, Maroochydore 4558
OFFICE: (07) 54 792 118 MOBILE: 0412 313 645 FAX: (07) 54 510 118
E-MAIL: [email protected]

Page 7

LINDSAY CONSULTING PTY LTD                                                              -


STRUCTURAL AND CIVIL ENGINEERS
ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED
AS TRUSTEE FOR THE LINDSAY FAMILY TRUST



                                              SITE CLASSIFICATION REPORT

         JOB NUMBER                           231061
         CLIENT                               POOLS BY DESIGN
         SITE LOCATION                        No. 5 SEAMIST COURT, SUNSHINE BEACH
         REPORT DATE                          NOVEMBER 2023

1.           INTRODUCTION

             The purpose of this report is to classify the subject allotment in accordance with
             Australian Standard 2870-2011 'Residential Slabs and Footings. From this classification
             a footing system has been recommended for the structure so as to allow adequate
             performance of the footings under the soil conditions determined at the site.

             This report relates exclusively to the proposed pool at subject allotment, as detailed on
             the architectural drawings supplied by the client. This document has been prepared for
             the express purpose stated above. This document does not cover any other elements
             related to construction on the site.


2.           SITE DESCRIPTION

             The subject allotment is a residential lot fronting a sealed road, there is an existing
             residence at the site and the proposed pool is to be located towards the rear. The
             proposed site has average grass cover with dense undergrowth and many shrubs and
             small trees present, the site falls towards the rear of the block at an approximate slope
             of 15%.


3.           SOIL PROFILE

             The borelogs carried out at the site, refer attached Site Plan for localities, indicate that
             the soil profile consists of clayey sand (high organic content - peat) overlying silty sand.
             A WATERTABLE was encountered at the time of testing at a depth of 900mm.


             Whilst every effort has been made to ensure that the borelogs carried out at the subject
             allotment are indicative of the soil profile over the site any discrepancy between the
             profile detailed in the borelogs and that observed during construction shall be referred
             to the Consulting engineer for immediate attention.


4.           MATERIALS LABORATORY TEST RESULTS

             Determination of the classification for the site in this situation is based upon test results
             from Dynamic Cone Penetrometer testing performed over the site and shrink/swell test
             results.




Off. 2C/82 Parker St, Maroochydore 4558
OFFICE: (07) 54 792 118 MOBILE: 0412 313 645 FAX: (07) 54 510 118
E-MAIL: [email protected]

Page 8

5.   SITE CLASSIFICATION AND TARGET STRATA

     Based on the findings of the site investigation and the footing system design proposed
     on the client supplied information, the classification of the site is considered to conform
     to: -

                                     CLASS " P "
      This classification is due to poor bearing capacity of the existing soil and
                                  the presence of peat.
         However, if this was not the case the soil type and reactivity would
                       be comparable to that of a CLASS " M ".

     in accordance with Australian Standard 2870-2011, 'Residential Slabs and Footings,
     Construction'.

     An allowable bearing capacity of 100kPa is reached with the medium dense SILTY
     SAND which occurs at a depth of 1200mm from the existing ground level at location
     BH1 and at a depth of 1300mm at location BH2. Any fill placed over the existing
     ground shall be piered through the fill into the existing material. Further note that the
     placement of reactive material as fill may change the site’s classification.


6.   FOOTING SYSTEM DESIGN

     The footing system shall be designed to conform to the performance limits stated in AS
     2870 – 2011 and reprinted in the C.S.I.R.O.'s Publication 10/91, 'Guide to Home
     Owners on Foundation Maintenance and Footing Performance', a copy of which
     attached to this report. It should be noted that footings designed in accordance with
     AS2870-2011 does not guarantee no movement of footings, shrinkage cracking or other
     damage to the building.

     Foundation preparation and footing construction shall be in accordance AS 2870 -2011
     and AS 3798-1990 'Guidelines on Earthworks for Commercial and Residential
     Developments'.

     Where necessary, subsoil drainage shall be incorporated in the construction of the
     building to ensure that subsurface water is properly drained away from the footings.

     Potential seepage or subsoil drainage problems cannot always be recognised from the
     results of a site investigation. Problems with respect to subsurface water flow or
     seepage may not be evident until after the site has been subject to the first significant
     wet period.

     After construction of the footing system the ground surface around the residence shall
     be sloped away from the footings at a fall of 1 in 20 minimum for a distance of 2000
     mm.


7.   ARTICULATION

     It is recommended that masonry walls on Class M, H, E and P sites be articulated at all
     or some openings. Articulation joints shall be constructed in accordance with the
     Cement and Concrete Association's Publication 'TN61 - Articulated Walling'.

Page 9

8.    SERVICES

      Expansive or collapsing soils require special considerations at service connections to
      ensure flexibility to prevent damage or breakage. In areas where known expansive or
      collapsing soils are present flexible connections and impervious plugs shall be provided
      to all services including all drainage, stormwater and septic system.

On and Behalf of
LINDSAY CONSULTING PTY LTD




Jason Lindsay
RPEQ 4928

Page 10

                                    LIMITATIONS
Recommendations given in this report are based on the information supplied by the client
regarding the proposed building construction in conjunction with the findings of the
investigation. Any change in construction type, building location or omission in the client
supplied information, may require additional testing and/or make the recommendations invalid.

The recommendations herein identify a target soil stratum into which the footings are to be
founded. The target stratum has been located by the depth in mm of the target stratum's upper
horizon boundary below the existing ground surface level at the time of the site investigation.
Any cutting or filling works and any surface erosion or deposits subsequent to the site
investigation, will alter the measured location of the stratum relative to the surface. Where
required, the author should be notified in such cases to confirm the location of the target stratum.

The description of the soil given in the Soil Profile section of this report is intended as a brief
overview of the soil's primary constituents. For a detailed classification of the soil, the reader
should refer to the Soil Profile Reports and/or Borehole Reports attached to this report.

Every reasonable effort has been made to locate the test sites so that the borehole profiles are
representative of the soil conditions within the area investigated. The client should be made
aware however, that exploration is limited by time available and economic restraints. In some
cases soil conditions can change dramatically over short distances, therefore, even careful
exploration programs may not locate all the variations.

If soil conditions different from those shown in this report are encountered or are inferred from
other sources, then the author must be notified immediately.

This report may not be reproduced except in full. The information and drawings provided with
this report shall only be used and will only be applicable for the development shown on the
client supplied information provided for this site.

Any dimensions, contours, slope directions and magnitudes shown on the Test Locality Plan
shall not be used for any building construction or costing calculations. The purpose of the plan
is to show approximate location of field tests only.

Any changes made to these recommendations by persons unauthorised by the author will legally
be interpreted as that person assuming the responsibility for the long-term performance of the
footing system.

The recommendations contained in this report have not taken into consideration the long term
effects of any previous, current or potential subsurface work by mining companies or potential
slope instability problems. At the time of writing this report neither our client (nor his agent)
nor the local authority had made the author aware that these problems may be affecting this
allotment. If a mining subsidence or slope stability assessment is required for this allotment,
the recommendations of a suitably qualified geotechnical engineer should be sought.

Page 11

Foundation Maintenance
and Footing Performance:
A Homeowner's Guide

(i)

CSIRO

BIF 18
replaces
Information
Sheet 10/91

Buildings can and often do move. This movement can be up, down, lateral or rotational. The fundamental cause
of movement in buildings can usually be related to one or more problems in the foundation soil. It is important for

the homeowner to identi

the soil type in order to ascertain the measures that should be put in place in order to

ensure that problems in the foundation soil can be prevented, thus protecting against building movement.

This Building Technology File is designed to identify causes of soil-related building movement, and to suggest

methods of prevention of resultant cracking in buildings.

Soil Types

The types of soils usually present under the topsoil in land zoned for
residential buildings can be split into two approximate groups —
granular and clay. Quite often, foundation soil is a mixture of both
types. The general problems associated with soils having granular
content are usually caused by erosion. Clay soils are subject to
saturation and swell/shrink problems.

Classifications for a given area can generally be obtained by
application to the local authority, but these are sometimes unreliable
and if there is doubt, a geotechnical report should be commissioned.
‘As most buildings suffering movement problems are founded on clay
soils, there is an emphasis on classification of soils according to the
amount of sweil and shrinkage they experience with variations of
water content. The table below is Table 2.1 from AS 2870, the
Residential Slab and Footing Code.

Causes of Movement

Settlement due to construction

There are two types of settlement that occur as a result of

construction:

* Immediate settlement occurs when a building is first placed on its
foundation soil, as a result of compaction of the soil under the
weight of the structure. The cohesive quality of clay soil mitigates
against this, but granular (particularly sandy) soil is susceptible.

* Consolidation settlement is a feature of clay soil and may take
place because of the expulsion of moisture from the soil or because
of the soil’s lack of resistance to local compressive or shear stresses.
This will usually take place during the first few months after
construction, but has been known to take many years in
excuptlonal sen

These problems are the province of the builder and should be taken

into consideration as part of the preparation of the site for construc-

tion. Building Technology File 19 (BTF 19) deals with these
problems.

Erosion
All soils are prone to crosion, but sandy soil is particularly susceptible
to being washed away. Even clay with a sand component of say 10%
or more can suffer from erosion.

Saturation

This is particularly a problem in clay soils. Saturation creates a bog-
like suspension of the soil that causes it to lose virtually all of its
bearing capacity. To a lesser degree, sand is affected by saturation
because saturated sand may undergo a reduction in volume —
particularly imported sand fill for bedding and blinding layers.
However, this usually occurs as immediate settlement and should
normally be the province of the builder.

Seasonal swelling and shrinkage of soil
All clays react to the presence of water by slowly absorbing it, making
the soil increase in volume (see table below). The degree of increase
varies considerably between different clays, as does the degree of
decrease during the subsequent drying out caused by fair weather
periods. Because of the low absorption and expulsion rate, this
phenomenon will not usually be noticeable unless there are
prolonged rainy or dry periods, usually of weeks or months,
depending on the land and soil characteristics.

The swelling of soil creates an upward force on the footings of the
building, and shrinkage creates subsidence that takes away the
support needed by the footing to retain equilibrium.

Shear failure

This phenomenon occurs when the foundation soil does not have

sufficient strength to support the weight of the footing. There are

ewo major post-construction causes:

* Significant load increase.

* Reduction of lateral support of the soil under the footing due to
crosion or excavation.

* In clay soil, shear failure can be caused by saturation of the soil
adjacent to or under the footing.

 

 

 

 

 

 

 

 

 

 

 

GENERAL DEFINITIONS OF SITE CLASSES
Class Foundation
A Most sand and rock sites with little or no ground movement from moisture changes
s Slightly reactive clay sites with only slight ground movement from moisture changes
M Moderately reactive clay or silt sites, which can experience moderate ground movement from moisture changes
H Highly reactive clay sites, which can experience high ground movement from moisture changes
E Extremely reactive sites, which can experience extreme ground movement from moisture changes
AtoP Filled sites
Pp Sites which include soft soils, such as soft clay or silt or loose sands; landslip; mine subsidence; collapsing soils; soils subject
to erosion; reactive sites subject to abnormal moisture conditions or sites which cannot be classified otherwise

 

 

Page 12

Tree root growth
‘Trees and shrubs that are allowed to grow in the vicinity of footings
can cause foundation soil movement in two ways:

* Roots that grow under footings may increase in cross-sectional
size, exerting upward pressure on footings.

* Roots in the vicinity of footings will absorb much of the moisture
in the foundation soil, causing shrinkage or subsidence.

| Unevenness of Movement

The types of ground movement described above usually occur
unevenly throughout the building's foundation soil. Settlement due
to construction tends to be uneven because of:

* Differing compaction of foundation soil prior to construction.
* Differing moisture content of foundation soil prior to construction.

Movement due to non-construction causes is usually more uneven
still. Erosion can undermine a footing that traverses the flow or can
create the conditions for shear failure by eroding soil adjacent to a
footing that runs in the same direction as the flow.

Saturation of clay foundation soil may occur where subfloor walls
create a dam that makes water pond. It can also occur wherever there
is a source of water near footings in clay soil. This leads to a severe
reduction in the strength of the soil which may create local shear
failure.

Seasonal swelling and shrinkage of clay soil affects the perimeter of
the building first, then gradually spreads to the interior. The swelling
process will usually begin at the uphill extreme of the building, or on
the weather side where the land is flat. Swelling gradually reaches the
interior soil as absorption continues. Shrinkage usually begins where
the sun’s heat is greatest.

_Effects of Uneven Soil Movement on Structures

 

Erosion and saturation

Erosion removes the support from under footings, tending to create
subsidence of the part of the structure under which it occurs.
Brickwork walls will resist the stress created by this removal of
support by bridging the gap or cantilevering until the bricks or the
mortar bedding fail. Older masonry has little resistance. Evidence of
failure varies according to circumstances and symptoms may include:

* Step cracking in the mortar beds in the body of the wall or
above/below openings such as doors or windows.

* Vertical cracking in the bricks (usually but not necessarily in line
with the vertical beds or perpends).

Isolated piers affected by erosion or saturation of foundations will
eventually lose contact with the bearers they support and may tilt or
fall over. The floors that have lost this support will become bouncy,
sometimes rattling ornaments etc.

Seasonal swelling/shrinkage in clay

Swelling foundation soil due to rainy periods first lifts the most
exposed extremities of the footing system, then the remainder of the
perimeter footings while gradually permeating inside the building
footprint to lift internal footings. This swelling first tends to create a
dish effect, because the external footings are pushed higher than the
internal ones,

The first noticeable symptom may be that the floor appears slightly
dished. This is often accompanied by some doors binding on the
floor or the door head, together with some cracking of cornice
mitres. In buildings with timber flooring supported by bearers and
joists, the floor can be bouncy. Externally there may be visible
dishing of the hip or ridge lines.

As the moisture absorption process completes its journey to the
innermost areas of the building, the internal footings will rise. If the
spread of moisture is roughly even, it may be that the symptoms will
temporarily disappear, but it is more likely that swelling will be
uneven, creating a difference rather than a disappearance in
symptoms. In buildings with timber flooring supported by bearers
and joists, the isolated piers will rise more easily than the strip
footings or piers under walls, creating noticeable doming of flooring.

Seer ee Sd

 

 

 

 

 

 

 

 

(eu)
mS
ROLL
Wall cracking
due to uneven
footing settlement

As the weather pattern changes and the soil begins to dry out, the
external footings will be first affected, beginning with the locations
where the sun’s effect is strongest. This has the effect of lowering the
external footings. The doming is accentuated and cracking reduces
or disappears where it occurred because of dishing, but other cracks
open up. The roof lines may become convex.

Doming and dishing are also affected by weather in other ways. In
areas where warm, wet summers and cooler dry winters prevail,
water migration tends to be toward the interior and doming will be
accentuated, whereas where summers are dry and winters are cold
and wet, migration tends to be toward the exterior and the
underlying propensity is toward dishing.

Movement caused by tree roots

In general, growing roots will exert an upward pressure on footings,
whereas soil subject to drying because of tree or shrub roots will tend
to remove support from under footings by inducing shrinkage.

Complications caused by the structure itself

Most forces that the soil causes to be exerted on structures are
vertical — i.e. either up or down. However, because these forces are
seldom spread evenly around the footings, and because the building
resists uneven movement because of its rigidity, forces are exerted
from one part of the building to another. The net result of all these
forces is usually rotational. This resultant force often complicates the
diagnosis because the visible symptoms do not simply reflect the
original cause. A common symptom is binding of doors on the
vertical member of the frame.

Effects on full masonry structures

Brickwork will resist cracking where it can. It will attempt to span
areas that lose support because of subsided foundations or raised
points. It is therefore usual to see cracking at weak points, such as
openings for windows or doors.

In the event of construction settlement, cracking will usually remain
unchanged after the process of settlement has ceased.

With local shear or erosion, cracking will usually continue to develop
until the original cause has been remedied, or until the subsidence
has completely neutralised the affected portion of footing and the
structure has stabilised on other footings that remain effective.

In the case of swell/shrink effects, the brickwork will in some cases
return to its original position after completion of a cycle, however it
is more likely that the rotational effect will not be exactly reversed,
and it is also usual that brickwork will settle in its new position and
will resist the forces trying to return it to its original position. This
means that in a case where swelling takes place after construction
and cracking occurs, the cracking is likely to at least partly remain
after the shrink segment of the cycle is complete. Thus, each time
the cycle is repeated, the likelihood is that the cracking will become
wider until the sections of brickwork become virtually independent.

With repeated cycles, once the cracking is established, if there is no
other complication, it is normal for the incidence of cracking to
stabilise, as the building has the articulation it needs to cope with
the problem. This is by no means always the case, however, and
monitoring of cracks in walls and floors should always be treated
seriously.

Upheaval caused by growth of tree roots under footings is not a
simple vertical shear stress. There is a tendency for the root to also
exert lateral forces that attempt to separate sections of brickwork
after initial cracking has occurred.

Page 13

The normal structural arrangement is that the inner leaf of brick-
work in the external walls and at least some of the internal walls
(depending on the roof type) comprise the load-bearing structure on
which any upper floors, ceilings and the roof are supported. In these
cases, it is internally visible cracking that should be the main focus
of attention, however there are a few examples of dwellings whose
external leaf of masonry plays some supporting role, so this should
be checked if there is any doubr. In any case, externally visible
cracking is important as a guide to stresses on the structure generally,
and it should also be remembered that the external walls must be
capable of supporting themselves.

Effects on framed structures

Timber or steel framed buildings are less likely to exhibit cracking
due to swell/shrink than masonry buildings because of their

flexibility. Also, the doming/dishing effects tend to be lower because
of the lighter weight of walls. The main risks to framed buildings are
encountered because of the isolated pier footings used under walls.
Where erosion or saturation cause a footing to fall away, this can
double the span which a wall must bridge. This additional stress can
create cracking in wall linings, particularly where there is a weak
point in the structure caused by a door or window opening. It is,
however, unlikely that framed structures will be so stressed as to suffer
serious damage without first exhibiting some or all of the above
symptoms for a considerable period. The same warning period should
apply in the case of upheaval. It should be noted, however, that where
framed buildings are supported by strip footings there is only one leaf
of brickwork and therefore the externally visible walls are the
supporting structure for the building. In this case, the subfloor
masonry walls can be expected to behave as full brickwork walls.

Effects on brick veneer structures

Because the load-bearing structure of a brick veneer building is the
frame that makes up the interior leaf of the external walls plus
perhaps the internal walls, depending on the type of roof, the
building can be expected to behave as a framed structure, except that
the external masonry will behave in a similar way to the external leaf
of a full masonry structure.

Water Service and Drainage

Where a water service pipe, a sewer or stormwater drainage pipe is in
the vicinity of a building, a water leak can cause erosion, swelling or
saturation of susceptible soil. Even a minuscule leak can be enough
to saturate a clay foundation. A leaking tap near a building can have
the same effect. In addition, trenches containing pipes can become
watercourses even though backfilled, particularly where broken
rubble is used as fill. Water that runs along these trenches can be
responsible for serious erosion, interstrata seepage into subfloor areas
and saturation,

Pipe leakage and trench water flows also encourage tree and shrub
roots to the source of water, complicating and exacerbating the
problem.

Poor roof plumbing can result in large volumes of rainwater being
concentrated in a small area of soil:

* Incorrect falls in roof guttering may result in overflows, as may
gutters blocked with leaves etc,

* Corroded guttering or downpipes can spill water to ground.

* Downpipes not positively connected to a proper stormwater
collection system will direct a concentration of water to soil that is
directly adjacent to footings, sometimes causing large-scale
problems such as erosion, saturation and migration of water under
the building.

Seriousness of Cracking

In general, most cracking found in masonry walls is a cosmetic
nuisance only and can be kept in repair or even ignored. The table
below is a reproduction of Table C1 of AS 2870.

AS 2870 also publishes figures relating to cracking in concrete floors,
however because wall cracking will usually reach the critical point
significantly earlier than cracking in slabs, this table is not
reproduced here.

| Prevention/Cure

Plumbing

Where building movement is caused by water service, roof plumbing,
sewer or stormwater failure, the remedy is to repair the problem.

It is prudent, however, to consider also rerouting pipes away from
the building where possible, and relocating taps to positions where
any leakage will not direct water to the building vicinity. Even where
gully traps are present, there is sometimes sufficient spill to create
erosion or saturation, particularly in modern installations using
smaller diameter PVC fixtures. Indeed, some gully traps are not
situated directly under the taps that are installed to charge them,
with the result that water from the tap may enter the backfilled
trench that houses the sewer piping. If the trench has been poorly
backfilled, the water will either pond or flow along the bottom of
the trench. As these trenches usually run alongside the footings and
can be ata similar depth, it is not hard to see how any water that is
thus directed into a trench can easily affect the foundation's ability to
support footings or even gain entry to the subfloor area.

Ground drainage

In all soils there is the capacity for water to travel on the surface and
below it. Surface water flows can be established by inspection during
and after heavy or prolonged rain. If necessary, a grated drain system
connected to the stormwater collection system is usually an easy
solution.

It is, however, sometimes necessary when attempting to prevent
water migration that testing be carried out to establish watertable
height and subsoil water flows. This subject is referred to in BTF 19
and may properly be regarded as an area for an expert consultant.

Protection of the building perimeter

Ic is essential to remember that the soil that affects footings extends
well beyond the actual building line. Watering of garden plants,
shrubs and trees causes some of the most serious water problems.

For this reason, particularly where problems exist or are likely to
occur, it is recommended that an apron of paving be installed
around as much of the building perimeter as necessary. This paving

 

CLASSIFICATION OF DAMAGE WITH REFERENCE TO WALLS

 

 

 

 

 

 

 

 

Description of typical damage and required repair Approximate crack width Damage
limit (see Note 3) category

Hairline cracks <0.1 mm 0
Fine cracks which do not need repair <l mm 1
Cracks noticeable but easily filled. Doors and windows stick slightly <S mm 2
Cracks can be repaired and possibly a small amount of wall will need 5-15 mm (or a number of cracks 3.
to be replaced. Doors and windows stick. Service pipes can fracture. 3 mm or more in one group)
‘Weathertightness often impaired
Extensive repair work involving breaking-out and replacing sections of walls, 15-25 mm but also depend 4
especially over doors and windows. Window and door frames distort. Walls lean on number of cracks
or bulge noticeably, some loss of bearing in beams. Service pipes disrupted

 

 

 

 

Page 14

Clump of trees;
1 height selected

 

 
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

% for distance
Saal Paint Ln from house
poe fertile

nage erator" BEIM Ye ene pm Mh
poeta fn Narn tegatana)

SS eee ST ri GL
meyer TTT
ee Patio.

{UHH
—| Drained
Carport pathway
Path—@
Garden bed
P _—— covered with
Driveway et mulch
fraternal

 

 

 

 

should extend outwards a minimum of 900 mm (more in highly
reactive soil) and should have a minimum fall away from the
building of 1:60. The finished paving should be no less than 100
mm below brick yent bases.

Ic is prudent to relocate drainage pipes away from this paving, if
possible, to avoid complications from future leakage. If this is noc
practical, earthenware pipes should be replaced by PVC and
backfilling should be of the same soil type as the surrounding soil
and compacted to the same density.

Except in areas where freezing of water is an issue, it is wise to
remove taps in the building area and relocate them well away from
the building — preferably not uphill from it (see BTF 19).

It may be desirable to install a grated drain at the outside edge of the
paving on the uphill side of the building. If subsoil drainage is
needed this can be installed under the surface drain.

Condensation

In buildings with a subfloor void such as where bearers and joists
support flooring, insufficient ventilation creates ideal conditions for
condensation, particularly where there is little clearance between the
floor and the ground. Condensation adds to the moisture already
present in the subfloor and significantly slows the process of drying
out. Installation of an adequate subfloor ventilation system, either
natural or mechanical, is desirable.

Warning: Although this Building Technology File deals with
cracking in buildings, it should be said that subfloor moisture can
result in the development of other problems, notably:

+ Water that is transmitted into masonry, metal or timber building
elements causes damage and/or decay to those elements.

¢ High subfloor humidity and moisture content create an ideal
environment for various pests, including termites and spiders.

* Where high moisture levels are wansmitted to the flooring and
walls, an increase in the dust mite count can ensue within the
living areas. Dust mites, as well as dampness in general, can be 2
health hazard to inhabitants, particularly those who are
abnormally susceptible to respiratory ailments.

The arden
The ideal vegetation layout is to have lawn or plants that require
only light watering immediately adjacent to the drainage or paving
edge, then more demanding plants, shrubs and trees spread out in
that order.

Overwatering due to misuse of automatic watering systems is a
common cause of saturation and water migration under footings. If
ir is necessary to use these systems, it is important to remove garden
beds to a completely safe distance from buildings.

Existing trees

Where a tree is causing a problem of soil drying or there is the
existence or threat of upheaval of footings, if the offending roots are
subsidiary and their removal will not significantly damage the tree,
they should be severed and a concrete or metal barrier placed
vertically in the soil to prevent future root growth in the direction of
the building. If it is not possible to remove the relevant roots
without damage to the tree, an application to remove the tree should
be made to the local authority. A prudent plan is to wansplant likely
offenders before they become a problem.

Information on trees, plants and shrubs

State departments overseeing agriculture can give information
regarding root patterns, volume of water needed and safe distance
from buildings of most species. Botanic gardens are also sources of
information, For information on plant roots and drains, see Building

Technology File 17.

Excavation

Excavation around footings must be properly engineered. Soil
supporting footings can only be safely excavated at an angle that
allows the soil under the footing to remain stable. This angle is
called the angle of repose (or friction) and varies significantly
between soil types and conditions. Remoyal of soil within the angle
of repose will cause subsidence.

 

Where erosion has occurred that has washed away soil adjacent to
footings, soil of the same classification should be introduced and
compacted to the same density. Where footings have been
undermined, augmentation or other specialist work may be required.
Remediation of footings and foundations is generally the realm of a
specialist consultant.

Where isolated footings rise and fall because of swell/shrink effect,
the homeowner may be tempted to alleviate floor bounce by filling
the gap that has appeared between the bearer and the pier with
blocking. The danger here is that when the next swell segment of the
cycle occurs, the extra blocking will push the floor up into an
accentuated dome and may also cause local shear failure in the soil.
Ifit is necessary to use blocking, it should be by a pair of fine
wedges and monitoring should be carried out fortnightly.

This BTF was prepared by John Lewer FAIB, MIAMA, Partner,
Construction Diagnosis.

 

The information in this and other issues in the series was derived from various sources and was believed to be correct when published.

 

The information is advisory. It is provided in good faith and not claimed to be an exhaustive treatment of the relevant subject.

 

 

Further professional advice needs to be obtained before taking any action based on the information provided.

 

Distributed by
CSIRO PUBLISHING PO Box 1139, Collingwood 3066, Australia

Freecall 1800 645 051

Tel (03) 9662 7666 Fax (03) 9662 7555 www.publish.csiro.au

Email: [email protected]

© CSIRO 2003. Unauthorised copying of this Building Technology file is prohibited

Page 15

SITE PHOTOGRAPHS

 

Page 16

Lindsay Consulting Pty Ltd
Off. 2C/82 Parker Street, Maroochydore


                                                                                      NO. 5 SEAMIST COURT,
 CLIENT               POOLS BY DESIGN                         SITE LOCATION
                                                                                       SUNSHINE BEACH
                                                                                                                            REFERENCE           231061
                    BORELOG 1                                                    BORELOG 2                                    PENETROMETERS
 Depth                                                         Depth
 below                                                         below
          Group                                                         Group
ground                           Soil Description             ground                           Soil Description             PN1    PN2    PN3   PN4   PN5
          Symbol                                                        Symbol
  level                                                         level
 (mm)                                                          (mm)
  0        SC      Clayey SAND, fine to medium, dark grey,      0        SC      Clayey SAND, fine to medium, dark grey,
                   high plasticity fines, moist, soft (HIGH                      high plasticity fines, moist, soft (HIGH
 100               ORGANIC CONTENT-PEAT)                       100               ORGANIC CONTENT-PEAT)                      0.25   0.25

 200                                                           200                                                          0.25   0.25

 300                                                           300                                                          0.25   0.25

 400                                                           400                                                          0.25   0.25

 500                                                           500                                                          0.3    0.3

 600                                                           600                                                          0.3    0.3
                   Silty SAND, fine to medium, pale grey,
 700       SM      low plasticity fines, moist, loose          700               Silty SAND, fine to medium, pale grey,     0.3    0.3

 800                                                           800       SM      low plasticity fines, moist, loose         0.5    0.5
                   WATERTABLE                                                    WATERTABLE
 900       SM      Silty SAND, fine to medium, pale grey,      900       SM      Silty SAND, fine to medium, pale grey,     0.5    0.5
                   low plasticity fines, saturated, loose                        low plasticity fines, saturated, loose
 1000                                                         1000                                                           1      1
                                                                                 Hole Terminated – Collapsing
 1100              Hole Terminated – Collapsing               1100                                                           1      2

 1200                                                         1200                                                           3      1

 1300                                                         1300                                                           4      3

 1400                                                         1400                                                           5      6

 1500                                                         1500                                                           6      5

COMMENTS




AUTHORISED SIGNATORY

Page 17

Lindsay Consulting Pty Ltd
Off. 2C/82 Parker Street, Maroochydore


                                                                                      NO. 5 SEAMIST COURT,
 CLIENT               POOLS BY DESIGN                         SITE LOCATION
                                                                                       SUNSHINE BEACH
                                                                                                                            REFERENCE           231061
                    BORELOG 1                                                    BORELOG 2                                    PENETROMETERS
 Depth                                                         Depth
 below                                                         below
          Group                                                         Group
ground                           Soil Description             ground                           Soil Description             PN1    PN2    PN3   PN4   PN5
          Symbol                                                        Symbol
  level                                                         level
 (mm)                                                          (mm)
  0        SC      Clayey SAND, fine to medium, dark grey,      0        SC      Clayey SAND, fine to medium, dark grey,
                   high plasticity fines, moist, soft (HIGH                      high plasticity fines, moist, soft (HIGH
 100               ORGANIC CONTENT-PEAT)                       100               ORGANIC CONTENT-PEAT)                      0.25   0.25

 200                                                           200                                                          0.25   0.25

 300                                                           300                                                          0.25   0.25

 400                                                           400                                                          0.25   0.25

 500                                                           500                                                          0.3    0.3

 600                                                           600                                                          0.3    0.3
                   Silty SAND, fine to medium, pale grey,
 700       SM      low plasticity fines, moist, loose          700               Silty SAND, fine to medium, pale grey,     0.3    0.3

 800                                                           800       SM      low plasticity fines, moist, loose         0.5    0.5
                   WATERTABLE                                                    WATERTABLE
 900       SM      Silty SAND, fine to medium, pale grey,      900       SM      Silty SAND, fine to medium, pale grey,     0.5    0.5
                   low plasticity fines, saturated, loose                        low plasticity fines, saturated, loose
 1000                                                         1000                                                           1      1
                                                                                 Hole Terminated – Collapsing
 1100              Hole Terminated – Collapsing               1100                                                           1      2

 1200                                                         1200                                                           3      1

 1300                                                         1300                                                           4      3

 1400                                                         1400                                                           5      6

 1500                                                         1500                                                           6      5

COMMENTS




AUTHORISED SIGNATORY

Page 18

 

LINDSAY CONSULTING ¢7;,

fvjl Engineers)
LTA ED 4928

OFF. 20/82 PARKER TREET, MAROQGAYDORE PH 5h 792 118

POOLS BY DESIGN
PROPOSED POOL

NO.5 SEAMIST COURT
SUNSHINE BEACH

CLIENT AND PROJECT DESCRIPTION

SCALES

REVISION LIST.

 

>

ORIGINAL ISSUE

 

 

 

 

 

 

SURVEY DATUM

 

 

 

 

 

 

 

 

 

THIS DRAWING REMAINS HE PROPERTY OF
LINDSAY CONSULTING PTY LTD AND IS FOR
THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD

 

DRAWING TITLE

SITE PLAN

 

ASSOCIATED CONSULTANTS

 

 

 

 

 

 

[Computer Fite

231061SP.DWG

 

 

DRAWING NUMBER

23-1061-S1

 

 

Bo

st

4oomm Coping ——

 

 

2nd Storey house Steel columns

NG Existing home ist Floor

 

 

wors

=
o
B
8
S
°
mS
—
B
s
=
S
.
a
n
bu
an
2
°
<

GRAVEL PIT

 

Easement with

HOUSE SEWER CONNECTION

4.00m

 

 

 

 

 

 

 

 

Page 19

                                                             EXISTING RESIDENCE                                                                                                              LINDSAY CONSULTING PTY
                                                                                                                                                                                                                LTD




                                                                                                                                                             LINDSAY CONSULTING HAVE NOT
                                                                                                                                                             BEEN PROVIDED WITH CONTOUR
                                                                                                                                                             SURVEY PLAN OR ACCURATE
                                                                                                                                                             LOCATION OF EASEMENT/SEWER



A SITE NOTE THAT THE FINAL LAYOUT, SHAPE AND SIZE SHALL BE
CONFORMED ON-SITE PRIOR TO CONSTRUCTION, DRAWN TO
INFORMATION PROVIDED BY CLIENT. LINDSAY CONSULTING DOES
NOT HOLD ANY RESPONSIBILITY FOR THE INFORMATION NOT
PROVIDED.


POOL FENCING IN ACCORDANCE WITH AS1926- 2007.
SELF LOCKING GATE LOCATIONS TO BE CONFIRMED ON-SITE

                                                                                                                DECK BY OTHERS
 POOL CONTRACTOR IS TO ENSURE THAT THE PROPOSED POOL IS
 EITHER OUTSIDE THE TREE ZONE OF INFLUENCE OR PROVIDE                                                                            APPROX 2.1 m OOG
 PROTECTIVE MEASURES AGAINST THE TREE EFFECTS SUCH AS
 INSTALLING ROOT BARRIER OR SIMILAR. TREE ZOI IS "DISTANCE
 FROM TREE = TREE HEIGHT X 2.0". ALTERNATIVELY THE POOL
 CONTRACTOR IS REQUIRED TO INFORM ENGINEER OF TREE
 LOCATION AND HEIGHTS FROM POOL ALONG WITH A SOIL
 REPORT TO DETERMINE THE SOIL EFFECTS APPLIED TO THE                                                               1.2 m DEEP
 POOL SHELL. THE POOL CONCRETE & REINFORCEMENT SHALL BE


                                                              APPROX EASEME
 DESIGNED TO SUPPORT INCREASED SURFACE MOVEMENT                                                                                       Centre block wall to support pool
                                                                        SEWER APPROX                                                  base without internal shell piers
                                                                            NT- AS PROVIDE




                                                                                                                                                  600 Wide Strip footing as per details
                                                                                                                   1.8 m DEEP
                                                                                      900mm DEEP
                                                                                           D BY POOL BUILD




                                                                                                                                                  RED CIRCLES Indicate 120kN safe
                                                                                                                                                  working load screw piles. Install 1-S12
                                                                                                                                                  bars through the top of pile 1m long min




                                                                                                                                 APPROX 2.7 m OOG
                                                                                                           ER

Page 20

N16 corner bars @ 125 crs (Above Ground)
350mm min lap
Radius 155mm




                                           LINDSAY CONSULTING PTY
                                                              LTD




     WALL REINFORCEMENT AS PER
     DETAILS

Page 21

 

 

$12 @ 150 CRS each
way in base

 

D

VERTICAL BARS

 

1500 MAX

S12 @ 300 crs

 

 

1800 MAX

 

$12 Bars @ 300 crs
S12 Intermediates @ 300 crs

 

 

200

D - 1800 mm MAX

 

 

Water Level

 

 

500
f

 

 

1a} fo

Vertical bars refer table. ———|
$12 Horizontals @ 125 crs I.
75mm cover to inside of pool |

ting beam

100 Max

4-S12 in

 

400 Radius min

 

 

N12 [email protected] to pool base. r
450 min. lap.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

UNCONTROLLED GRAVEL BACKFILL

NATURAL SURFACE

| constaucridn

 

 

1400 MAX

 

 

 

 

 

 

3400 mm MAX OVERALL HEIGHT

JOINT

190mm core filled blockwork with N12 @

400 crs each|wa
Lo y

N12 starters/@ 400 CRS
450mm min. lap.

 

 

 

LYAXYYAY AY | FO

 

 

 

 

 

 

 

 

Screw Piles (120 kN SWL)) |

 

SECTION THROUGH ABOVE GROUND POOL

 

 

 

YPXYXRYDYILYYXY YY

 

 

 

 

 

 

lt 600 x 600 footing
with 4-N12 top and bottom
R10 ligs at 200 CRS

 

 

 

Screw Piles (120 kN SWL)) ed

 

$12 bar through
top of screw pile (1000 mm long)

 

LINDSAY CONSULTING #7
CLI

   
 

RPEO 4928

 

THIS DRAWING REMAINSAHE PROPERTY OF
LINDSAY CONSULTING PTY LTD AND IS FOR
THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD

 

CLIENT AND PROJECT DESCRIPTION

POOLS BY DESIGN
PROPOSED POOL
NO.5 SEAMIST CRT
SUNSHINE BEACH

 

DRAWING TITLE

TYPICAL REINFORCEMENT
DETAILS

 

SCALES

 

SURVEY DATUM

 

ASSOCIATED CONSULTANTS

 

REVISION LIST

 

>

ORIGINAL ISSUE 16/1723,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

[computer File

231061PL.DWG

 

DRAWING NUMBER SHEET] REV.

23-1061-PL3 3A

 

 

 

 

 

 

Page 22

LINDSAY CONSULTING PTY LTD                                          -


STRUCTURAL AND CIVIL ENGINEERS
ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED
AS TRUSTEE FOR THE LINDSAY FAMILY TRUST




                                                    APPENDIX B –

       PRACTICE NOTE GUIDELINES INTO LANDSLIDE
                  RISK MANAGEMENT




Off. 2C/82 Parker St, Maroochydore 4558
OFFICE: (07) 54 792 118 MOBILE: 0412 313 645 FAX: (07) 54 510 118
E-MAIL: [email protected]

Page 23

4002 YEW Lb ON Zr IA SojUBYDStUDeS Uel}EnSNYy

6

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

  

 

 

 

 

 

 
 

 

 

 

 

 

ksI9A 9214 10U “UDidL2S9G UBIsse OF UONdLOSSG 20 aBeuME Jo 1805 TeUNKeAddy Jsn TUBE or YOY Woy pasn_aq pInOYs sige 74L <b)
“Suadoid ayy ia2yye ABUL YAIYAS SOPHISPUEY 4942 SSUPPH 0} SOM HONESHLGMS |ELOLEPPE IPN|SuI I0U s90p Ip "UONEpouTEATe
Aseroduisi “saa; [eBO] se ORS sys0a yENUSNbosUOS PUL “SooJ UTISOpP [WUOISSQJOId PUY PaNs.O SEY YOIYM SpPHSpUE] IYI JOJ [PAD] YSU FIQeIDIOI O1 SIS 94) JOPUDS OF PaumNbas sys0ns
wonesipquys '(soamongys snyd puxl) Suadosd om yo uoruod paBeuep oi yo wuawoTeIstIA JO 1909 DY) Sv YONs “ABRUEp 941 JO SOD Jaap ayi fo BeuUNSS UN aq 0} St ISOD BeUunxouddy sq), tay
‘soamionas pasayeun
au sid pury otp sopnjam qonpw Ausdosd poroayeun ay) Jo anja paroudur ag) Jo 109 OM) Fu19q “onpRA yoyseuL Jo aFema2u0d w se passaadxa st aSeumg Jo oD oeuNxesddy 2y_ —(Z)_—=SMION
ti Casta 3: "930 Atepunog [euonou =
5 LNVOIINDISNI BP paplarpans aq seu GoTaws siyp (urea IsoWy) 12. iene Rar the tons mee apy SO
e ONDA SOM UONESHIqejs TEAMS estas SOs SULT para] el Ses
“SEeurEp s2Uanbosuos IOUT ALodosd jUsSEIpE Sue [Seal 1 ASHES P[noy *o0t ~
€ woidaw “Sym vONESI ACIS 826] SuuNbas ous Jo ued juvsy{UTIs 20/puE “AIMIINUNS 50 2WEs 0} aBvUP aIDPOW 207
“SauuiEp souanbasios winipow Avadoud jasEIpe SuO Sea] I SsNeS PINeD “SHO UORESTIqUIS ‘HO,
z MOV quwaryrudis TuMbas SoUpunog ay puosog Zurpuayxa 10 /pure “aunr9NAS Jo SOU! 01 DSeusup aatsua1xy %09
“SamaEp souonbasuos ioleu Auedoud jusoulpe suo Ise9] Te SsNUD Pinos “UoHUsTIqers OF :
t SIHdOMLSVLVD 40) Som BuysaurSus 2ofeur Subs: oFeuup sess Vue] 10/pue p2Xoxsep <jmo[dwoo (s)oamanns OE.
Saepunog, ae
peed andiassg aondusseg peworON aAneoipey
aBeurng jo ys0> PEuNxoaddy
ALUAATOUd OL SHINANOASNOD AO STANSVAW FALLVLITKAO
“‘PSJ9A SOTA YOU “JOIALDSIG] UBisse oO} UONNMISOG 40 AWyiquqolg jenuUY sRtUTxOIddy asn YysE OF Yd] WIOLY PoSN oq PINOYs Bqe) FL wD 290N
a Aiaidauo ATauva 301 USISOp Sip ISA [AFDUN) JO aIqUAISSUOSUT ST WANT AML | ean yogroue s189% 900 0001 aire 201
: 7 aH Usisap sy) Ao = eee
a ARIVY | ssouvisumoate jeuondaoxe iapun <juo ang apquasaouoa St 1UIAa AU, d aoo'ont I asia OL
aaassp | >< oon‘ = s
aq ATENEIND | ain saxo ssounistunaiio ssuape asa aapun snas0 jyStU yUAAe aU, s209% 900°0L Res Ol
> FIAISSOd | ai] Uaisap dq) JAA SUOHIPUOS SSIRAPS JDP MD PNG WADA AU, SHB9A WOOT SanDe OOOT ¥ oT
ee sxea 007 a cuss :
a ATU | 31 soso suomypucs asa2ape Jopun sna90_<iqeqosd qj. wad AULL xbsene aor te of
Vv. NVI 1SOWTV 2] UBISap ofp IAG INDO Or PaaadNa s] WDA SUL waeaA OF Sore
Siepaneg z
even] sendjaed oopeiansn pessayuy aouaasnoay reuonON 2aneopuy
, aPHSPEET Qaneaypuy poudiay Amqeqosg penuuy aearyxoaddy

 

 

 

 

 

 

GOOHTTANIT AO STUNSVAW AAILVLITFAO

ALYAdOUd OL MSRI ONISSASSV NI ASN AOU ADO TONIAMAL FALLVLITVNO

ANGAINSSASSY MSTA FATISAGNY'T *D XIGNGddVv

£002 LNSWS9VNVW MSI8 SQMSOGNVT YOS SANINAGINS 3LON ADILOVad

 

Page 24

4002 YEW | ON Zp OA SOIUEYDoWOSD UeYENSNY ce

“apingd [ex9uas v se uDAIS
ApGO aie asayy 2st Ie Aodoud ayy JO ounTeU ay) UO pusdop Keur pue waussasse ysLI Ip OF somsed [je Aq pouTUUaEp oq O} ase UONENpS sepNoIEd B 40} suoNRoIidun oy], {L) :30N

 

 

 

 
 

 

 

 

 

‘sounpasosd souvuajurems odojs jeauoU Aq aBeuepy ‘opquidsooy ASHI AOT AWA ‘TA
“‘palmbar

St aouEUDTUTeUE BULOTUO *]9A9| Sty) 0} YSU 9M SONpeL O12 poulnbos usaq sey UOULAN sD>y AA “SUOTEINBo2 O71 o[quidoooe Ajyens~) ASA MOT 1
‘ayqeonoeid se uoos se pajuswajdur

24 PINOYS YS Mo7] O} SConpas O} suOHdO yUDUNLSI] “MOT OF YSLE OY) PONPes OF sud: UNA JO WOE WaWs|du MSM ALVUsaGow Ww
pue Sujuuyjd ‘uonesnsoaut sosnbos ing (jeaoudde s_s0;e[NFos OF jOalqns) SoOURISUINDID UTELIDD UT Payes9jO1 9q ALP

“Kpodoud oq Jo onjva Oy) 0) UOHU]Al UI MINS [EHUEISGNS B ISOS P[NOM Oy “AO OF SU 2

2onpas 0} posnbaz suondo jusuyeay Jo UONLuoWadun pues BurmuRd ‘UONPEYSoAU! papElog, “USWRAN joy ajqQeuidoooeu

 

“Auodoid
YI JO aNTBA UvY) o10W }sO9 OF AJaXI] YIOA\ “]LONIeId JOU pue aAIsUsdxa OO} aq ABU SMO7] OF YSIA DONPod OF uasso suondo
juouyran Jo UOHRUaWalduuy pue SuluuEld “youwasas puv UOETNSeaut pojmiep salsuaxy “qUSUNeON INoYyLAS e1qeideoowUA

  

 

 

() suoneaydury sdurexy BAT ISR
SNOILVOITHAT THAAT MSTA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

“oun
quoUINS arp Ie paywowsjduy 9q 1OU ABU YOIYM SouNsedW JONUOD YSU WLW JO SUOFNPUOD Bunsexa Joy StH sDYIOYAr payeys Apsw9/9 aq ISNUE JI JUDUISSOSSE YSU B BULSpIsuos UDYA\ (9)
“YSIY MOT SI &%]"O UY] Ssa] JO 99UDNbasUOD vB JEL YoNs PoplAlpqns aq Aewi “gy [19D 104 (sg)  :s930N
TA TA TA dA 1 a1s1GaUd ATANVa 4
TA 1A fi 1 Ww auva a
VA q q Ww = Fee s ATAMVINA a
TA Ww Ww Ie =— alaissOd - 3
q Ww ATAIMIT a
(s) 1401 NIVINGS LSOWIV Vv
%eSO qu Gord
LNVOLIINDISNI %S %o0T %09 %oV0T fenuuay aeurxoaddy
is MONI? wordgaw = MOLVA 27 OMdOULSV.LYO 31 JO an EA PAHESPUT
(asewEG Jo oD aeunxosddy saneorpul WM) ALAAdOUd OL SAONANOASNOD GOOHITAINIT

 

 

ALYAMOUd OL MSTA AO THATT — XTILVW SISATWNV MSTA FALLVLITKAO

(G4aNNILNOOD) ALAAAOUd OL MSN ONISSASSV NI ASN AOA ADOTONUIAAAL AALLVLITVNO — *O XIGNAddV
4002 LNSWS9VNVW MSI SACMSAGNV1 YOS SANITAGINS SALON SDILOWed

 

 

Page 25

LINDSAY CONSULTING PTY LTD                                          -


STRUCTURAL AND CIVIL ENGINEERS
ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED
AS TRUSTEE FOR THE LINDSAY FAMILY TRUST




                                                    APPENDIX C

                              AUSTRALIAN GEOGUIDES
                             LR3 – LANDSLIDES IN SOILS
                            LR5 – WATER AND DRAINAGE
                               LR7 – LANDSLIDE RISKS
                          LR8 – CONSTRUCTION PRACTICES




Off. 2C/82 Parker St, Maroochydore 4558
OFFICE: (07) 54 792 118 MOBILE: 0412 313 645 FAX: (07) 54 510 118
E-MAIL: [email protected]

Page 26

AUSTRALIAN GEOGUIDE LR3 (LANDSLIDES IN SOIL)

Landslides occur on soil slopes and the consequences can include damage to property and loss of life. Soil slopes exist
in all parts of Australia and can even occur in places where rock outcrops can be seen on the surface. If you live on, or
below, a soil slope it is important to understand why a landslide might occur and what you can do to reduce the risk it
presents.

It is always worth asking the question 'why is this slope here?", because the answer often leads to an understanding of
what might happen in the future. Slopes are usually formed by weathering (breakdown) and erosion (physical
Movement) of the natural ground - the "parent material". Many factors are involved including rain, wind, chemical
change, temperature variation, plant growth, animal activity and our own human enthusiasm for development. The
general process is outlined in Figure 1.

The upper levels of the parent material progressively weather over thousands, or millions, of years, losing strength. This
can result in a surface layer which looks similar to the parent material (although its colour has probably changed) but has
the strength of a soil - this is called “residual soil. At some stage the weathered surface layer is exposed to the
elements and fragments are transported down the slope. In this context a fragment could be a single sand grain, a
boulder, or a landslide. The time scale could be anything from a few seconds to many thousands of years. The
transported fragments often collect on the lower slopes and form a new soil layer that blankets the original slope -
"colluvium". If material reaches a river or the sea it is deposited as "alluvium" or as a "marine deposit". With appropriate
changes in river and sea level this material can again find itself on the surface to commence another cycle of weathering
and erosion. In places often, but not only, near the coast, this can include sand sized fragments which form beaches and
are sometimes blown back onto the land to form dunes.

all wae
= s

Weathered parent material

   
 
     
 
   

(residual soil)
Fragments of parent material
transported down slope
Gare} Figure 2 Remnant
material ancient
landslide
River

     
 

or sea

  

 

 
  

Water or wind deposited soils
‘ (alluvium, marine deposits, or dunes)
Figure 4
Landslides can occur almost anywhere on a soil slope. Slides can be rotational, translational, or debris flows (see
GeoGuide LR2) and may have a number of causes.

a wR
mr ia
Landslide from parent material

or residual soil further uphill

     

Landslide due to increased
water pressures, or

Rise in water table, or an
increase in water content can :
be due to tree clearance, installing

 
 

soakaway drains, or a period of heavy rain ~~

Figure 2

164 Australian Geomechanics Vol 42 No 1 March 2007

Page 27

AUSTRALIAN GEOGUIDE LR3 (LANDSLIDES IN SOIL)

pn

or N
Landslide due to poorly supported excavation,
excessive fill depth, steep excavated

   

cut face or inadequately designed
shallow foundations

Ancient landslide reactivated by
led rainfallor major reshaping
e landscape
_— 3
Some of the more common causes of landslides in soil are:
1) Falls of the parent material or residual soil from above, due to natural weathering processes (Figure 2),
2) Increased moisture content and consequent softening of the soil, or a rise in the water table. These can be due

to excessive tree clearance, ill-considered soak-away drainage or septic systems, or heavy rainfall (Figure 2).
3) Excavation without adequate support, increased surface load from fill placement, or inadequately designed
shallow foundations (Figure 3).
4) Natural erosion at the toe of the slope due to scour by a river or the sea (Figure 3).
5) Re-activation of an ancient landslide (Figure 3),

Most soil slopes appear stable, but they all achieved their present shape through a process of weathering and erosion

and are often sensitive to minor changes in the factors that affect their stability. As a general rule, human activities only

improve the situation if they have been designed to do so, Once this idea is understood, it is probably easy to see why

the following basic rules are so important and should not be ignored without seeking site specific advice from a

geotechnical practitioner:

. Do not clear trees unnecessarily.

. Do not cut into a slope without supporting the excavated face with an engineer designed structure,

. Do not add weight to a slope by placing earth fill or constructing buildings with inadequately designed shallow
foundations (Note: in certain circumstances weight is added to the toe of a slope to inhibit landslide movement,
but this must be carried out in accordance with a proper engineering design).

. Do not allow water from storm water drains, or from septic waste or effluent disposal systems to soak into the
ground where it could trigger a landslide.

More information in relation to good and poor hillside construction practice is given in GeoGuide LR8, With appropriate

engineering input it is often possible to reduce the likelihood, or consequences, of a landslide and so reduce the risk to

property and to life. Such measures can include the construction of properly designed storm water and sub-soil drains,

surtace oe (Seoguce LRS) and aes walls ee LR6). Design should be undertaken by a

 

More Information relevant to your particular situation may be found in other Australian GeoGuides:

GeoGuide LR1 - Introduction
GeoGuide LR2 - Landslides
GeoGuide LR4 - Landslides in Rock
GeoGuide LR5 - Water & Drainage
GeoGuide LR6  - Retaining Walls

GeoGuide LR7 - Landslide Risk

GeoGuide LR8 = - Hillside Construction

GeoGuide LR9 - Effluent & Surface Water Disposal
GeoGulde LR10 - Coastal Landslides

GeoGuide LR11 - Record Keeping

 

The Australian GeoGuldes (LR series) are a set of publications Intended for properly owners; local councils; planning authorities;
developers; insurers; lawyers and, in fact, anyone who lives with, or has an interest in, a natural or engineered slope, a cutling, or an
excavation. They are intended to help you understand why slopes and retaining structures can be a hazard and whal can be done with
appropriate professional advice and local council approval (if required) to remove, reduce, or minimise the risk they represent. The
GeoGuides have been prepared by the Australian Geomechanics Sociely, a specialist technical sociely within Engineers Australia, the
national peak body for all engineering disciplines in Australia, whose members are professional geotechnical engineers and engineering
geologists with a particular interest in ground engineering. The GeoGuides have been funded under the Australian governments’
National Disaster Mitigation Program.

Australian Geomechanics Vol 42 No 1 March 2007 165

Page 28

AUSTRALIAN GEOGUIDE LR5 (WATER & DRAINAGE)

One way of another, water usually plays a critical part in initiating a landslide (GeoGuide LR2). For this reason, it is a
key factor to be controlled on sites with more than a low landslide risk (GeoGuide LR7).

Groundwater and Groundwater Flow

The ground is permeable and water flows through it as illustrated in Figure 1. When rain falls on the ground, some of it
tuns along the surface ("surface water run-off’) and some soaks in, becoming groundwater. Groundwater seeps
downwards along any path it can find until it meets the water table: the local level below which the ground is saturated. If
it reaches the water table, groundwater either comes to a halt in what is effectively underground storage, or it continues
to flow downwards, often towards a spring where it can seep out and become surface water again, Above the water
table the ground is said to be "partially saturated", because it contains both water and, air. Suctions can develop in the
partially saturated zone which have the effect of holding the ground together and reducing the risk of a landslide.
Vegetation and trees in particular draw large quantities of water out of the ground on a daily basis from the partially
saturated zone. This lowers the water table and increases suctions, both of which reduce the likelihood of a landslide
occurring,

 

Figure 1 - Groundwater flow

Groundwater Flow and Landslides

The landslide risk in @ hillside can be affected by increase in soak-away drainage or the construction of retaining walls
which inhibit groundwater flow. The groundwater is likely to rise after heavy rain, but it can also rise when human
interference upsets the delicate natural balance. Activities such as felling trees and earthworks can lead to:

¢ — areduction in the beneficial suctions in the partially saturated zone above the water table.

increased static water pressures below the water table,

increased hydraulic pressures due to groundwater flow,

loss of strength, or softening, of clay rich strata,

loss of natural cementing in some strata,

transportation of soil particles,

Any of these effects, or a combination of them, can lead to landslides like those illustrated in GeoGuides LR2, LR3 and
LRA.

Limiting the Effect of Water

Site clearance and construction must be carefully considered if changes in groundwater conditions are to be limited.
GeoGuide LR8 considers good and poor development practices. Not surprisingly much of the advice relates to sensible
treatment of water and is not repeated here. Adoption of appropriate techniques should make it possible to either
maintain the current ground water table, or even cause It to drop, by limiting inflow to the ground.

If drainage measures and surface protection are relied on to keep the risk of a landslide to a tolerable level, it is important
that they are inspected routinely and maintained (GeoGuide LR11).

The following techniques may be considered to limit the destabilising effects of rising groundwater due to development
and are illustrated in Figure 2.

168 Australian Geomechanics Vol 42 No 1 March 2007

Page 29

AUSTRALIAN GEOGUIDE LRS5 (WATER & DRAINAGE)

 

Figure 2 - Techniques used to control groundwater flow

Surface water drains (dish drains, or table drains) - are often used to prevent scour and limit inflow to a slope. Other
than in rock, they are relatively ineffective unless they have an impermeable lining. You should clear them regularly, and
as required, and not less than once a year, If you live in an area with seasonal rainfall, it is best to do this near the end
of the dry season. If you notice that soil or rock debris is falling from the slope above, determine the source and take
appropriate action. This may mean you have to seek advice from a geotechnical practitioner.

Surface protection - is sometimes used in addition to surface water drainage to prevent scour and minimise water
inflow to a slope. You should inspect concrete, shoterete or stone pitching for cracking and other signs of deterioration at
least once a year. Make sure that weepholes are free of obstructions and able to drain. If the protection is deteriorating,
you should seek advice from a geotechnical practitioner.

Sub-soil drains - are often constructed behind retaining walls and on hillsides to intercept groundwater. Their function is
to remove water from the ground through an appropriate outlet. It is important that subsoil drains are designed to
complement other measures being used. They should be laid in a sand, or gravel, bed and protected with a graded
stone or geotextile filter to reduce the chance of clogging. Sub-soil drains should always be laid to a fall of at least 1
vertical on 100 horizontal. Ideally the high end should be brought to the surface, so it can be flushed with water from
time to time as part of routine maintenance procedures,

Deep, underground drains - are usually only used in extreme circumstances, where the landslide risk is assessed as
not being tolerable and other stabilisation measures are considered to be impractical. They work by permanently
lowering the water table in a slope. They are not often used in domestic scale developments, but if you have any on your
site be aware that professional maintenance is essential. If they are not maintained and stop working, the water table will
rise and a landslide may even occur during normal weather conditions. Both an increase or a reduction in the normal
flow from deep drains could indicate a problem if it appears to be unrelated to recent rainfall. If changes of this sort are
observed, you should have the drains and your site checked by a geotechnical practitioner.

Documentation - design drawings and specifications for geotechnical measures intended to minimise landslide risk can
be of great assistance to a geotechnical specialist, or structural engineer, called in to inspect and report on them. Copies
of available documentation should be retained and passed to the new owner when the property is sold (GeoGuide
LR11). You should also request details of an appropriate maintenance program for drainage works from the designer
and keep that information with other relevant documentation and maintenance records.

More information relevant to your particular situation may be found In other Australian GeoGuldes:

*  GeoGuide LR1 - Introduction «  GeoGuide LR7 - Landslide Risk

* GeoGuide LR2 - Landslides «  GeoGulde LR8 - Hillside Construction

©  GeoGuideLR3 - Landslides in Soll « GeoGuide LR9 - Effluent & Surface Water Disposal
* GeoGuide LR4 - Landslides in Rock *  GeoGuide LR10 - Coastal Landslides

* GeoGuide LR6 - Retaining Walls *  GeoGuide LR11 - Record Keeping

 

The Australian GeoGuides (LR series) are a set of publications intended for property owners; local councils; planning authorities;
developers; insurers; lawyers and, in fact, anyone who lives with, or has an interest in, a natural or engineered slope, a culling, or an
excavation. They are intended lo help you understand why slopes and retaining structures can be @ hazard and what can be done with
appropriate professional advice and local council approval (if required) to remove, reduce, or minimise the risk they represent. The
GeoGuides have been prepared by the Australian Geomechanics Sociely. a specialist technical sociely within Engineers Australia, the
national peak body for all engineering disciplines in Australia, whose members are professional geotechnical engineers and engineering
geologists with a particular interest in ground engineering. The GeoGuides have been funded under the Australian governments’
National Disaster Mitigation Program.

Australian Geomechanics Vol 42 No 1 March 2007 169

Page 30

AUSTRALIAN GEQGUIDE LR7 (LANDSLIDE RISK)

Concept of Risk

Risk is a familiar term, but what does it really mean? It
can be defined as “a measure of the probability and
severity of an adverse effect to health, property, or the
environment.” This definition may seem a_ bit
complicated. In relation to landslides, geotechnical
practitioners (GeoGuide LR1) are required to assess
risk in terms of the likelihood that a particular landslide
will occur and the possible consequences. This is called
landslide risk assessment. The consequences of a
landslide are many and varied, but our concerns
normally focus on loss of, or damage to, property and
loss of life.

Landslide Risk Assessment

Some local councils in Australia are aware of the
potential for landslides within their jurisdiction and have
fesponded by designating specific “landslide hazard
zones" Development in these areas is often covered
by special regulations. If you are contemplating
building, or buying an existing house, particularly in a
hilly area, or near cliffs, go first for information to your
local council.

Landslide risk assessment must be undertaken by

geotechnical practitioner. It may involve visuel
inspection, geological mapping, — geotechnical
investigation and monitoring to identify:

* potential landslides (there may be more than
‘one that could impact on your site)

the likelihood that they will occur

the damage that could result

the cost of disruption and repairs and

the extent to which lives could be lost.

Risk assessment is a predictive exercise, but since the
ground and the processes involved are complex,
prediction tends to lack precision. If you commission a

landslide risk assessment for a particular site you
should expect to receive a report prepared in
accordance with current professional guidelines and in
a form that is acceptable to your local council, or
planning authority.

Risk to Property

Table 1 indicates the terms used to describe risk to
property, Each risk level depends on an assessment of
how likely a landslide is to occur and its consequences
in dollar terms. "Likelihood" is the chance of it
happening in any one year, as indicated in Table 2.
"Consequences" are related to the cost of repairs and
temporary loss of use if a landslide occurs. These two
factors are combined by the geotechnical practitioner to
determine the Qualitative Risk,

TABLE 2: LIKELIHOOD

Annual
Almost Certain 4:10

1:

4:4,000

Rare 4:100,000,
credible 71,000,000

The terms "unacceptable", “may be tolerated", etc, in
Table 1 indicate how most people react fo an assessed
risk level. However, some people will always be more
prepared, or better able, to tolerate a higher risk level
than others.

Some local councils and planning authorities stipulate a
maximum tolerable level of risk to property for
developments within their jurisdictions, In these
situations the risk must be assessed by 2 geotechnical
practitioner. If stabilisation works are needed to meet
the stipulated requirements these will normally have to
be carried out as part of the development, or consent
will be withheld,

 

TABLE 1; RISK TO PROPERTY
Significance - Geotechnical engineering requirements

 

Qualitative Risk

Very high | VH | Unacceptable without treatment. Extensive detailed investigation and research, planning and
implementation of treatment options essential to reduce risk to Low. May be too expensive and not
practical. Work likely to cost more than the value of the property.

Unacceptable without treatment. Detailed investigation, planning and implementation of treatment
options required to reduce risk to acceptable level. Work would cost a substantial sum in relation to
the value of the property.

May be tolerated in certain circumstances (subject to regulator's approval) but requires
investigation, planning and implementation of treatment options to reduce the risk to Low.
Treatment options to reduce to Low risk should be implemented as soon as possible.

Usually acceptable to regulators. Where treatment has been needed to reduce the risk to this
level, ongoing maintenance is required.

 

 

High H

 

Moderate | M

 

 

Very Low | VL | Acceptable. Manage by normal slope maintenance procedures.

 

 

 

 

 

172 Australian Geomechanics Vol 42 No 4 March 2007

Page 31

AUSTRALIAN GEOGUIDE LR7 (LANDSLIDE RISK)

Risk to Life

Most of us have some difficulty grappling with the
concept of risk and deciding whether, or not, we are
prepared to accept it. However, without doing any sort
of analysis, or commissioning a report from an “expert”,
we all take risks every day. One of them is the risk of
being killed in an accident. This is worth thinking about,
because it tells us a lot about ourselves and can help to
put an assessed risk into a meaningful context. By
identifying activities that we either are, or are not,
prepared to engage in we can get some indication of
the maximum level of risk that we are prepared to take.
This knowledge can help us to decide whether we really
are able to accept a particular risk, or to tolerate a
particular likelihood of loss, or damage, to our property
(Table 2),

In Table 3, data from NSW for the years 1998 to 2002,
and other sources, is presented. A risk of 1.in 100,000
means that, in any one year, 1 person is killed for every
100,000 people undertaking that particular activity. The
NSW data assumes that the whole population
undertakes the activity, That is, we are all at risk of
being killed in a fire, or of choking on our food, but it is
reasonable to assume that only people who go deep
sea fishing run a risk of being killed while doing it.

It can be seen that the risks of dying as a result of
falling, using a motor vehicle, or engaging in water-
related activities (including bathing) are all greater than
1:100,000 and yet few people actively avoid situations
where these risks are present. Some people are averse
to flying and yet it represents a lower risk than choking
to death on food. Importantly, the data also indicate
that, even when the risk of dying as a consequence of a
particular event is very small, it could still happen to any
one of us any day. If this were not so, no one would
ever be struck by lightning.

Most local councils and planning authorities that
stipulate a tolerable risk to property also stipulate a
tolerable risk to life. The AGS Practice Note Guideline
recommends that 1:100,000 is tolerable in newly

developed areas, where works can be carried out as
part of the development to limit risk. The tolerable level
is raised to 1:10,000 in established areas, where
specific landslide hazards may have existed for many
years. The distinction is deliberate and intended to
prevent the concept of landslide risk management, for
its own sake, becoming an unreasonable financial
burden on existing communities. Acceptable risk is
usually taken to be one tenth of the tolerable risk
(1:1,000,000 for new developments and 1:100,000 for
established areas) and efforts should be made to attain
these where it is practicable and financially realistic to
do so.

TABLE 3: RISK TO LIFE

 

 

 

 

 

 

 

 

 

 

 

Risk (deaths per Activity/Event Leading to
participant per Death

year) (NSW data unless noted)
1:1,000 Deep sea fishing (UK)
Te 0) Motor cycfing, horse riding ,

. ultra-light flying (Canada)

4:23,000 Motor vehicle use
1:30,000 Fall
1:70,000 Drowning
1:180,000 Fire/burn
1:660,000 Choking on food
1:1,000,000 Scheduled airlines (Canada)
1:2,300,000 Train travel
1:32,000,000 Lightning strike

 

 

 

 

More information relevant to your particular situation may be found in other AUSTRALIAN GEOGUIDES:

GeoGuide LR1 - Introduction
GeoGuide LR2 - Landslides
GeoGuide LR3_ - Landslides in Soil
GeoGuide LR4 - Landslides in Rock
GeoGuide LR5 - Water & Drainage

wees

GeoGuide LR6 - Retaining Walls

GeoGuide LR8  - Hillside Construction

GeoGuide LRO = - Effluent & Surface Water Disposal
GeoGulde LR10 - Coastal Landslides

GeoGuide LR11 - Record Keeping

 

The Australian GeoGuides (LR series) are a set of publications intended for properly owners; local councils, planning authorilies;
developers; insurers; lawyers and, in fact, anyone who lives with, or has an interest in, a nalural or engineered slope, a cutting, or an
excavation They are intended to help you understand why slopes and retaining structures can be a hazard and what car be done with
appropriate professional advice and local council approval (if required) to remove, reduce, or minimise the risk they represent. The
GeoGuldes have been prepared by the Australian Geomechanics Society. a specialist technical sociely wilhin Engineers Australia, the
National peak body for all engineering disciplines in Australia, whose members are professional geotechnical engineers and engineering

geologists with a particular interest in ground engineering
National Disaster Mitigation Program.

The GeoGuides have been funded under the Australian governments’

Australian Geomechanics Vol 42 No 1 March 2007 173

Page 32

AUSTRALIAN GEOGUIDE LR8 (CONSTRUCTION PRACTICE)

Sensible development practices are required when building on hillsides, particularly if the hillside has more than a low
risk of instability (GeoGuide LR7). Only building techniques intended to maintain, or reduce, the overall level of landslide
risk should be considered. Examples of good hillside construction practice are illustrated below.

EXAMPLES OF GOOD HILLSIDE CONSTRUCTION PRACTICE

  
  
  
  
  
 
 
 
 
  
  
  

we
Vegetation retained
‘Surface water interception drainage \ of
Walertight, adequately siled and founded roof water storage \
tanks (with due regard for impact of potential leakage) —____—— \g
Flexible structure
Roof water piped off site or stored ———__——

On-site detention tanks, walertight and adequately
founded. Potential leakage managed by sub-soil
drains

"Pier footings into rock
~~ Subsoil drainage may be
fequired in slope
\ ~ Cutting and filling minimised in development
\ Sewage effiuent pumped out or connected to sewer.
Tanks adequately founded and watertight. Potential
leakage managed by sub-soll drains
~\___ Engineered retaining walls wth both surface and fs
subsurface drainage (constructed before dwelling)
©) AGS (?007)
Ss ‘Son also AGS (2000) Appanaix J

WHY ARE THESE PRACTICES GOOD?

Roadways and parking areas - are paved and incorporate kerbs which prevent water discharging straight into the
hillside (GeoGuide LR5).

Cuttings - are supported by retaining walls (GeoGuide LR6).

Retaining walls - are engineer designed to withstand the lateral earth pressures and surcharges expected, and include
drains to prevent water pressures developing in the backfill. Where the ground slopes steeply down towards the high
side of a retaining wall, the disturbing force (see GeoGuide LR8) can be two or more times that in level ground.
Retaining walls must be designed taking these forces into account.

Sewage - whether treated or not is either taken away in pipes or contained in properly founded tanks so it cannot soak
into the ground.

Surface water - from roofs and other hard surfaces is piped away to a suitable discharge point rather than being allowed
to infiltrate into the ground. Preferably, the discharge point will be in a natural creek where ground water exits, rather
than enters, the ground. Shallow, lined, drains on the surface can fulfil the same purpose (GeoGuide LRS).

Surface loads - are minimised. No fill embankments have been built, The house is a lightweight structure. Foundation
loads have been taken down below the level at which a landslide is likely to occur and, preferably, to rock. This sort of
construction is probably not applicable to soil slopes (GeoGuide LR3). If you are uncertain whether your site has rock
near the surface, or is essentially a soil slope, you should engage a geotechnical practitioner to find out.

Flexible structures - have been used because they can tolerate a certain amount of movement with minimal signs of
distress and maintain their functionality.

Vegetation clearance - on soil slopes has been kept to a reasonable minimum. Trees, and to a lesser extent smaller
vegetation, take large quantities of water out of the ground every day. This lowers the ground water table, which in turn
helps to maintain the stability of the slope. Large scale clearing can result in a rise in water table with a consequent
increase in the likelihood of a landslide (GeoGuide LR5). An exception may have to be made to this rule on steep rock
slopes where trees have little effect on the water table, but their roots pose a landslide hazard by dislodging boulders.
Possible effects of ignoring good construction practices are illustrated on page 2. Unfortunately, these poor construction
practices are not as unusual as you might think and are often chosen because, on the face of it, they will save the
developer, or owner, money. You should not lose sight of the fact that the cost and anguish associated with any one of
the disasters illustrated, is likely to more than wipe out any apparent savings at the outset.

ADOPT GOOD PRACTICE ON HILLSIDE SITES

174 Australian Geomechanics Vol 42 No 1 March 2007

Page 33

AUSTRALIAN GEOGUIDE LR8 (CONSTRUCTION PRACTICE)
EXAMPLES OF POOR HILLSIDE CONSTRUCTION PRACTICE

Unslabilised rock topples and travels downslope

 
 
   
 
 
 
 
   
 
 

Vegetation removed
Steep unsupported cut faits \
Discharges of roofwater soak away rather than \
conducted offsite or to secure storage for re-tise
Structure unable to (olerate
settlement and cracks

Poorly compacted fil soties S
unevenly and cracks poo! fy
Inadequate walling unable i
to support fill i

 

— = Ponded water enters slope and activates landslide =
~ Possible travel downslope which impacts other development downhill See eo AGS (2000) Append J

WHY ARE THESE PRACTICES POOR?

Roadways and parking areas - are unsurfaced and lack proper table drains (gutters) causing surface water to pond and
‘soak into the ground.
Cut and fill - has been used to balance earthworks quantities and level the site leaving unstable cut faces and added
large surface loads to the ground. Failure to compact the fill properly has led to settlement, which will probably continue
for several years after completion. The house and pool have been built on the fill and have settled with it and cracked.
Leakage from the cracked pool and the applied surface loads from the fill have combined to cause landslides.
Retaining walls - have been avoided, to minimise cost, and hand placed rock walls used instead. Without applying
engineering design principles, the walls have failed to provide the required support to the ground and have failed,
creating a very dangerous situation.
A heavy, rigid, house - has been built on shallow, conventional, footings. Not only has the brickwork cracked because
of the resulting ground movements, but it has also become involved in a man-made landslide.
Soak-away drainage - has been used for sewage and surface water run-off from roofs and pavements. This water
soaks into the ground and raises the water table (GeoGuide LR5). Subsoil drains that run along the contours should be
avoided for the same reason. If felt necessary, subsoil drains should run steeply downhill in a chevron, or herring bone,
pattern. This may conflict with the requirements for effluent and surface water disposal (GeoGuide LR9) and if so, you
will need to seek professional advice.
Rock debris - from landslides higher up on the slope seems likely to pass through the site. Such locations are often
Teferred to by geotechnical practitioners as "debris flow paths". Rock is normally even denser than ordinary fill, so even
quite modest boulders are likely to weigh many tonnes and do a lot of damage once they start to roll. Boulders have
been known to travel hundreds of metres downhill leaving behind a trail of destruction.
Vegetation - has been completely cleared, leading to a possible rise in the water table and increased landslide risk
(GeoGuide LRS).

DON'T CUT CORNERS ON HILLSIDE SITES - OBTAIN ADVICE FROM A GEOTECHNICAL PRACTITIONER

More information relevant to your particular situation may be found in other Australian GeoGuides:

*  GeoGuideLR1 - Introduction *  GeoGuide LR6 - Retaining Walls

¢ GeoGuideLR2 - Landslides «  GeoGuide LR7  - Landslide Risk

*  GeoGuide LR3  - Landslides in Soil * GeoGuide LR - Effluent & Surface Water Disposal
*  GeoGuide LR4 - Landslides in Rock GeoGuide LR10 - Coastal Landslides

+ _GeoGuide LR5 _- Water & Drainage * —GeoGuide LR11 - Record Keeping

 

The Australian GeoGuides (LR series) are a set of publications intentled for property owners; local councils; planning authorities;
developers; insurers; lawyers and, in facl, anyone who lives with, or has an interest in, a nalural or engineered slope, @ cutting, or an
excavalion. They are intended (o help you understand why slopes and retaining structures can be a hazard and what can be done with
appropriate professional advice and local council approval (if required) to remove, reduce, or minimise the risk they represent. The
GeoGuides have been prepared by the Australian Geomechanics Sociely, a specialist technical society within Engineers Australia, the
national peak body for all engineering disciplines in Australia, whose members are professional geolechnical engineers and engineering
geologists with a particular interest in ground engineering, The GeoGuides have been funded under the Australian governments’
National Disaster Mitigation Program.

Australian Geomechanics Vol 42 No 1 March 2007 175

Page 34

 

APPENDIX G - SOME GUIDELINES FOR HILLSIDE CONSTRUCTION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pipes.
‘Where structural distress is evident see advice.
If seepage observed determine cases or seek advice on consequences.

 

GOOD ENGINEERING PRACTICE POOR ENGINEERING PRACTICE
ADVICE
GEOTECHNICAL Obtain advice from a qualified, experienced geotechmical practitioner at early | Prepare detailed plan and start site works before
ASSESSMENT stage of planning and before site works. geotechnical advice.
PLANNING = _
SITE PLANNING Having obtained geotechnical advice. plan the development with the risk | Plan development without regard for the Risk.
arising from the identified hazards and consequences in muind.
DESIGN AND CONSTRUCTION ¥
‘Use flemtble structures which incorporate properly desiened brickwork, timber | Floor plans which require extensive cutting and
HOUSE DESIGN | 0! tee! Stames, timber or pane! clactime, filling.
Consider use of split levels. Movement intolerant structures.
Use decks for recreational areas where appropriate.
SITE CLEARING Retain natural vegetanon wherever practicable. Indiscrmmnately clear the site.
ACCESS & Satisfy requirements delow for cuts, fills, retaining walls and drainage. Excavate and fill for site access before
DRIVEWAYS Council spectfications for grades may need to be modified. geotechnical advice
Driveways and parking areas may need to be fully supported on piers.
EARTHWORKS Retain natwal contours wherever possible. Tndiscrmmatory bulk earthworks.
Minimise depeh Large scale cuts and benching.
Ours Support with engineered retaining walls or batter to appropriate slope. Unsupported cuts
Provide drainage measures and erosion control Ignore drainage requirements
‘Minute height ‘Loose or poorly compacted fill, which if it falls,
Strip vegetation and topsoil and key into natural slopes prior to filling. way flow a considerable distance including
Use clean fill materials and compact to engineering standards. onto property below.
Fars Batter to appropriate slope or suppart with engineered retaining wall Block natural drainage lines.
Provide surtace dramage and appropriate subsurface drainage. Fill over existing vegetation and topsail.
Include stumps, trees, vegetation, topsoil
boulders, building mibble etc in fill
Rock Ourcrors | Remove or stabilise boulders which may have unacceptable risk. Distrd or undercut detachad Blocks or
& Bowers Support rock faces where necessary. boulders.
Engineer design to resist applied soi! and water forces. Construct a structurally inadequate wall such as
RETADING Found on rock where practicable sandstone flagging, brick or umreinforced
WALLS Provide subsurface drainage within wall backfill and surface drainage on slope | blockwork
above Lack of subsurface drains and weepholes.
Construct wall as soon as possible after cut fill operation.
Found within rock where pracacable Found on topsoil, loose 11 detached boulders
FOOTINGS Use rows of piers or strip footings oriented up and down slope. orundercut cliffs.
Desizm for lateral creep pressures if necessary.
Backfill footing excavations to exclude ingress of surface water.
Engineer designed
Support on piers to rock where practicable.
SWIMMING POOLS | Provide with under-drainage and gravity drain outlet where
Design for high soil pressures which may develop on uphill side whilst there
muay be lirtle or no lateral support on downhill side
DRAINAGE
Provide at tops of cut and fill slopes. Discharge at top of fills and cuts.
Discharge to street drainage or natural water courses Allow water to pond on bench areas.
SURFACE Provide general fails to prevent blockage by siltation and incorporate silt traps
Line to minimise mnfilzation and make flexible where possible
Special structures to dissipate energy at chanzes of slope and/or direction.
Provide filter around subsurface drain Discharge roof nmoé into absorption trenches.
Sunsunrace | Provide drain behind retaining walls.
Use flexible pipelines with access for maintenance.
Prevent inflow of surface water.
Semck Usually requires pump-put or main: sewer systems; absorption trenches may | Discharge sullage directly onto and into slopes.
Surtage be possible im some areas if risk is acceptable. Use absorption menches without consideration
Storage tanks should be water-tight and adequately founded. of landslide nck.
EROSION Control erosion as this may lead to instability. Failure to observe earthworks and dramage
CONTROL & Revegetate cleared area. recommendations when landscaping.
LANDSCAPING
DRAWINGS AND SITE VISITS DURING CONSTRUCTION
DRAWINGS Building Applicanon drawings should be viewed by geotechnical consulmnt
STE VISITS Site Visits by consultant may be appropriate durmz construction’
INSPECTION AND MAINTENANCE BY OWNER
OWNER’S Clean dramage systems; repair broken joints in drams and aks im supply
RESPONSIBILITY

 

 

Page 35

LINDSAY CONSULTING PTY LTD                                          -


STRUCTURAL AND CIVIL ENGINEERS
ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED
AS TRUSTEE FOR THE LINDSAY FAMILY TRUST




            APPENDIX D – IMPORTANT INFORMATION
           REGARDING GEOTECHNICAL ENGINEERING
                           REPORTS




Off. 2C/82 Parker St, Maroochydore 4558
OFFICE: (07) 54 792 118 MOBILE: 0412 313 645 FAX: (07) 54 510 118
E-MAIL: [email protected]

Page 36

Page 37

the report's recommendations if that engineer does not
perform construction observation.

A Geotechnical Engineering Report Is
Subject to Misinterpretation

Other design team members’ misinterpretation of
geotechnical engineering reports has resulted in costly
problems. Lower that risk by having your geotechnical
engineer confer with appropriate members of the design
team after submitting the report. Also retain your
geotechnical engineer to review pertinent elements of the
design team’s plans and specifications. Contractors can
also misinterpret a geotechnical engineering report.
Reduce that risk by having your geotechnical engineer
participate in prebid and preconstruction conferences,
and by providing construction observation.

Do Not Redraw the Engineer’s Logs
Geotechnical engineers prepare final boring and testing
logs based upon their interpretation of field logs and
laboratory data. To prevent errors or omissions, the logs
included in a geotechnical engineering report should
never be redrawn for inclusion in architectural or other
design drawings. Only photographic or electronic
reproduction is acceptable, but recognise that separating
logs from the report can elevate risk.

Give Contractors a Complete Report and
Guidance

Some owners and design professionals mistakenly
believe they can make contractors liable for
unanticipated subsurface conditions by limiting what
they provide for bid preparation. To help prevent costly
problems, give contractors the complete geotechnical
engineering report, but preface it with a clearly written
letter of transmittal. In that letter, advise contractors that
the report was not prepared for purposes of bid
development and that the report’s accuracy is limited;
encourage them to confer with the geotechnical engineer
who prepared the report (a modest fee may be required)
and/or to conduct additional study to obtain the specific
types of information they need or prefer. A prebid
conference can also be valuable. Be sure contractors
have sufficient time to perform additional study. Only

ASF

then might you be in a position to give contractors the
best information available to you, while requiring them
to at least share some of the financial responsibilities
stemming from unanticipated conditions.

Read Responsibility Provisions Closely

Some clients, design professionals, and contractors do
not recognise that geotechnical engineering is far less
exact than other engineering disciplines. This lack of
understanding has created unrealistic expectations that
have led to disappointments, claims, and disputes. To
help reduce such risks, geotechnical engineers
commonly include a variety of explanatory provisions in
their reports. Sometimes labelled “limitations”, many of
these provisions indicate where geotechnical engineers
responsibilities begin and end, to help others recognise
their own responsibilities and risks. Read these
provisions closely. Ask questions. Your geotechnical
engineer should respond fully and frankly.

Geoenvironmental Concerns Are Not

Covered

The equipment, techniques, and personnel used to
perform a geoenvironmental study differ significantly
from those used to perform a geotechnical study. For
that reason, a geotechnical engineering report does not
usually relate any geoenvironmental findings,
conclusions, or recommendations; ¢.g., about the
likelihood of encountering underground storage tanks or
regulated contaminants. Unanticipated environmental
problems have led to numerous project failures. If you
have not yet obtained your own geocnvironmental
information, ask your geotechnical consultant for risk
management guidance. Do not rely on an environmental
report prepared for someone else.

Rely on Your Geotechnical Engineer for

Additional Assistance

Membership in ASFE exposes geotechnical engineers to
a wide array of risk management techniques that can be
of genuine benefit for everyone involved with a
construction project. Confer with your ASFE member
geotechnical engineer for more information.

PROFESSIONAL
FIRMS PRACTICING
IN THE GEOSCIENCES

8811 Colesville Road Suite G10 Silver Spring, MD 20910
Telephone: 301-565-2733 Facsimile: 301-589-2017
email: [email protected] www.asle.org

Copyright 1998 by ASFE, Inc. Unless ASFE grants written permission to do so, duplication of this document by any means whatsoever is
expressly prohibited. Re-use of the wording in this document, in whole or in part, also is expressly prohibited, and may be done only with the
express permission of ASFE or for purposes of review of scholarly research.

IIGER06983.5M

Page 2 of 2
GAP - Form No. 3
RL2

Page 38

APPENDIX E —- LANDSLIP HAZARD FREQUENCY
ANALYSIS

Page 39

                         LINDSAY CONSULTING PTY LTD
Project   9 MYALL STREET, GYMPIE                           Project Number        231154
                                                                            FACTORY POOLS
                                                           Client


                            LANDSLIDE FREQUENCY ANALYSIS
A         NATURAL SHALLOW LANDSLIDES

          FEATURE                                                           FACTOR

          SLOPE ANGLE                                                          0.500
          SLOPE SHAPE                                                          0.900
          SITE GEOLOGY                                                         1.000
          MATERIAL STRENGTH                                                    4.000
          CONCENTRATION OF SURFACE WATER                                       0.800
          EVIDENCE OF GROUNDWATER                                              0.700
          EVIDENCE OF INSTABILITY                                              0.500

          CALCULATED RELATIVE FREQUENCY                                        0.504 LOW
          APPROXIMATE ANNUAL SITE PROBABLITY FOR FEATURE                    2.02E-03

B         ROCKFALL

          FEATURE                                                           FACTOR

          SLOPE OF ROCK FACE                                                   0.000
          ORIENTATION OF DEFECT SYSTEM                                         0.000
          EVIDENCE OF INSTABILITY                                              0.000

          CALCULATED RELATIVE FREQUENCY                                        0.000 N/A
          APPROXIMATE ANNUAL SITE PROBABLITY FOR FEATURE                    0.00E+00

C         BOULDERS

          FEATURE                                                           FACTOR

          BOULDER SIZE                                                         0.000
          BOULDER SHAPE                                                        0.000
          SLOPE ANGLE                                                          0.000
          SLOPE SURFACE                                                        0.000
          EVIDENCE OF INSTABILITY                                              0.000

          CALCULATED RELATIVE FREQUENCY                                        0.000 N/A
          APPROXIMATE ANNUAL SITE PROBABLITY FOR FEATURE                    0.00E+00

D         FILL BATTERS

          FEATURE                                                           FACTOR

          FILL HEIGHT                                                          0.200
          SITE GEOLOGY                                                         1.000
          BATTER SLOPE ANGLE                                                   0.500
          NATURAL SURFACE SLOPE                                                0.200
          EVIDENCE OF INSTABILITY                                              0.500

          CALCULATED RELATIVE FREQUENCY                                        0.010 VERY LOW
          APPROXIMATE ANNUAL SITE PROBABLITY FOR FEATURE                    4.00E-05

E         CUT BATTERS

          FEATURE                                                           FACTOR

          CUT HEIGHT                                                           0.500
          SLOPE OF CUT FACE                                                    0.500
          MATERIAL IN CUTTING                                                  2.000
          NATURAL SURFACE SLOPE ABOVE CUT                                      0.200
          CUT SLOPE SUPPORT                                                    0.500
          DISTANCE OF TOE OF CUT TO STRUCTURE                                  2.000
          EVIDENCE OF INSTABILITY                                              0.500

          CALCULATED RELATIVE FREQUENCY                                        0.050 VERY LOW
          APPROXIMATE ANNUAL SITE PROBABLITY FOR FEATURE                    2.00E-04

          Basic Frequency Adopted for Site                                     0.004

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.