Town Planning Assessment Report · 132005.307.01
SUNCOAST BUILDING APPROVALS TOWN PLANNING REPORT SBA 22792
PO5 Not applicable.
Public safety and the environment are not
adversely affected by the impacts of bushfire on
hazardous materials manufacturing or storing in
bulk.
PO6 Not applicable.
Roads provide for easy and safe evacuation of
residents of premises and access by emergency
services.
PO7 Not applicable.
Lot design and building siting minimises bushfire
hazard risk to people and property
PO8 Not applicable.
Firebreaks and fire access tracks provide:
(a) adequate access for fire fighting and
other emergency vehicles; and
(b) adequate access for the evacuation of
residents and emergency personnel in an
emergency situation.
8.2.4 Coastal Protection and Scenic Amenity Overlay Code
PO1 Not applicable.
Development allows for natural fluctuations of the
coast and foreshores to occur, including
allowance of climate change.
PO2 Not applicable.
Development is located, designed and
constructed to:
(a) maintain dune crest heights and
minimise and mitigate the risk to
development from wave overtopping and
storm tide inundation; and
(b) maintain or enhance coastal ecosystems
and natural features such as coastal
creeks and marine plants including
mangroves, salt marshes and coastal
wetlands, to assist in protecting and
buffering communities and infrastructure
from sea-level rise and coastal
inundation impacts.
PO3 Not applicable.
Where a coastal building line exists on a lot, all
buildings, structures and retaining walls do not
extend seaward of the coastal building line for the
site, other than—
(a) uncovered and unenclosed cantilevered
balconies that do not extend greater than
3 metres seaward of the coastal building
line; and
(b) are setback a minimum of 6 metres from
the seaward boundary (see Figure
8.2.4.4).
PO4 Complies.
Where a coastal building line does not exist on a
lot fronting the beachfront or a reserve adjoining
the beachfront, new buildings and structures are
setback no less than 6 metres from the seaward
boundary of the site.
PO5 Complies.
15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Town Planning Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 620 KB (small file)
- File type
No other editions are linked here.