5.3.2 Initial and Continuing Losses
Initial and continuing losses were approximated based on calibrating the pre-development flows
within XPSTORM to be comparable with Rational Method results. Refer to Table 5-4 below for the
adopted initial and continuing losses.
Table 5-4 – Adopted Initial and Continuing Losses
Designation Initial Loss Continuing Loss
Impervious Areas 0.0 0.0
Pervious Areas 10.0 2.6
5.3.3 On-site Detention
In order for the post-development stormwater discharge conditions to match the pre-development
conditions, it is proposed to incorporate a series of on-site above ground detention tanks with a
maximum storage volume of 27.5kL. The detention tanks will be located adjacent to each roof
catchment within the site.
The proposed OSD tanks will typically have the following properties:
• Available detention depth above reuse component = 1.420 m;
• Low flow orifice diameter = 0.070 m;
• High flow pipe diameter = 0.150 m;
• High flow pipe elevation above reuse component = 1.135 m;
• Total required detention volume = 23.5 kL; and
• Total provided detention volume = 27.5 kL.
The detention tanks will be designed to contain all flows up to a Q20 storm event from the roof
catchment and will mitigate flows at or less than pre-development for all flows up to a Q100 storm
event.
Refer to Appendix F for the Concept Siteworks and Drainage Plan which details the proposed on-
site detention system.
5.3.4 Comparison of Peak Flows at Lawful Point of Discharge
The pre-development and post-development mitigated peak mean/median flow rates were
compared for the catchment and are shown in Table 5-5 below.
Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.