Original source · versioned page text
Att 1 - RFI Amended SWMP
23098 - SBSMP/3
Page 11
Table 5-5 - Comparison of Peak Flows
XPSTORM XPSTORM XPSTORM XPSTORM
XPSTORM Total
Post-development Post-development Post-development Total Post-
ARI Pre-development
Flows into Tanks Bypass Flows (Un - Flows from Tanks development Flows
(years) Flows (Catchment)
3 (Un -Mitigated) Mitigated) (Mitigated) (Mitigated)
(m /s)
(m3/s) (m3/s) (m3/s) (m3/s)
1 0.040 0.038 0.021 0.019 0.040
2 0.047 0.043 0.024 0.021 0.046
5 0.069 0.057 0.036 0.026 0.062
10 0.083 0.064 0.043 0.029 0.072
20 0.095 0.073 0.050 0.039 0.089
50 0.117 0.084 0.070 0.039 0.109
100 0.132 0.092 0.086 0.039 0.125
As can be seen, the XPSTORM pre-development results are comparable to Rational Method for all
storm events, as they are generally within 10% to the Rational Method results. Therefore, the results
show that a reasonable validation in peak flows has been achieved from the XPSTORM model when
compared to Rational Method and is considered acceptable in assessing for mitigation of post
development flows.
Subsequently, the XPSTORM hydraulic modelling results have demonstrated that the proposed
mitigation implemented will maintain pre-development flows (or less) for all design storms at the
LPD located northeast of the subject site.
To address the Water Quality and Drainage Code Performance Outcome PO2 design allowance for
climate change impacts, it is recommended that the OSD storage volume be increased by 20%, from
an initial capacity of 27.5kL to a revised capacity of 37.5kL, to address climate change
considerations. This adjustment to the proposed maximum tank volume for the proposed
development is deemed to be an acceptable outcome to address AO2.4.
The modified OSD tanks will now have the following properties:
• Available detention depth above reuse component = 1.820 m;
• Low flow orifice diameter = 0.070 m;
• High flow pipe diameter = 0.150 m;
• High flow pipe elevation above reuse component = 1.640 m;
• Total required detention volume = 28.20 kL (23.5 kL + 20%); and
• Total provided detention volume = 37.5 kL (5 x 7.5kL).
Refer to Appendix H for the pre-development XPSTORM results, Appendix I for the post-
development XPSTORM results and Appendix J for the XPSTORM post-development mitigated
results.
Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.