0 141219 Rtcda Cooroy Cover Letter · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (1 of 3) Cover letter and site, floor & elevation plans.

of 22

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

& Palm Lake

Works & PamLake YW Palm Lake Me Palm ake’ k Palm Lake’

Group ~—r SS Care

CONDITION 50

Condition 50 of the Decision Notice reads as follows:
Carparking shall be provided within the site generally as shown on drawing titled Schedule of Independent
Living Units 0805-TP04 Revision B 1 November 2008, except as modified herein.

Proposed Change

It is proposed condition 50 be amended as follows:

Car parking shall be proposed within the site generally in accordance with that shown on drawing
CO_000_2014 Site Plan prepared by Palm Lake Works dated 19 December 2014.

Justification

The proposed site plan identifies where all visitor and staff parking will be provided for the retirement
community and aged care facility. All other car parking will be provided in the form of single and double
garages forming part of the future dwellings.

CONDITION 66

Condition 66 of the Decision Notice reads as follows:
Peak discharges of stormwater shall be managed in accordance with the Concept Stormwater Management
Plan for Cooroy Retirement Village Trading Post Road, Cooroy prepared by Brown Consulting dated June 2008
and any subsequent amendments approved by Council.

Proposed Change

Condition to include a minor change:
Peak discharges of stormwater shall be managed generally in accordance with the Concept
Stormwater Management Plan for Cooroy Retirement Community Trading Post Road, Cooroy
prepared by Brown Consulting in Report No. BO7056-02A Section 3, 4 & 5 dated December 2014 and
any subsequent amendments approved by Council

Justification

This condition is proposed to be updated to reflect the updated stormwater management plan prepared by
Calibre Consulting. Refer to Appendix H.

CONDITION 69

Condition 69 of the Decision Notice reads as follows:
The applicant shall revise the Concept Stormwater Management Plan for Cooroy Retirement Village Trading
Post Road, Cooroy prepared by Brown Consulting dated June 2008 to detail a stormwater treatment train that
can achieve Load Reduction Targets for Tota! Suspended Solids, Total Phosphorous and Total Nitrogen in
accordance with the Healthy Waterways Water Sensitive Urban Design — Technical Guidelines for South East
Queensland (2006). This revised stormwater treatment train for the site shall ensure that nutrients can be
adequately treated prior to release off site. The revised Concept Stormwater Management Plan shall specify
water quality objectives for stormwater prior to it leaving the site to ensure the modelled outcomes are
achieved. All stormwater runoff treatment must be undertaken within the development areas of the site. The

Page 16 of 22

 

Palm Lake Works | Southport Central Tower 3, 9 Lawson Street, Southport QLD 4215 | PO Box 10479, Southport BC QLD 4215
P (07) 5552 1300 | W www.PalmLakeResort.com.au | W www.PalmLakeCare.com
Palmlake Works Pty Ltd trading as Palm Lake Works | ACN 095 986 119 | ABN 14 095 986 119

Works

Used in these records

About this file

File size
4.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0 141219 RTCDA COOROY COVER LETTER.pdf · 4.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.