0 141219 Rtcda Cooroy Cover Letter · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (1 of 3) Cover letter and site, floor & elevation plans.

of 22

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

—~\} Works Mors: Ker Go, Qos

applicant shall submit an amended plan for Council approval prior to a Development Permit for Operational
Works being issued.

Proposed Change
It is recommended that the condition to be amended to the updated report reference, as indicated below:

Stormwater Quality Management shall be managed generally in accordance with Calibre Consulting
Report No. B14158.W-01A dated December 2014.

 

The stormwater quality Management Strategy is to meet the Water Quality Objectives as specified
under Healthy Waterways Water Sensitive Urban Design — Technical Guidelines for South East
Queensland (2006) as well as the State Planning Policy 2014 (SPP 2014) prior to release off site.

 
    

are-achieved. All stormwater runoff treatment
the site.

must be undertaken within the development areas of

The applicant shall submit an amended plan for Council approval prior to a Development Permit for
Operational Works being issued.

Justification

The revised Stormwater Quality Management Plan has been provided by Calibre Consulting (formerly Brown
Consulting) in Report No.B14158.W-01A dated December 2014.

The updated strategy provided meets the Water Quality Objectives as specified under Healthy Waterways
Water Sensitive Urban Design — Technical Guidelines for South East Queensland (2006) as well as the State
Planning Policy 2014 (SPP 2014).

CONDITION 70

Condition 70 of the Decision Notice reads as follows:
Stormwater Quality Improvement Devices as detailed within the Concept Stormwater Management Plan for
Cooroy Retirement Village Trading Post Road, Cooroy prepared by Brown Consulting dated June 2008 and any
updates approved by Council shall be installed within the development to ensure compliance with the
designated water quality objectives are achieved. Stormwater likely to contain grease and oil (i.e. from
carparking areas) shall be managed via grease and oil arrestors prior to treatment within bioretention basins
and wetlands.

Page 17 of 22

Palm Lake Works | Southport Central Tower 3, 9 Lawson Street, Southport QLD 4215 | PO Box 10479, Southport BC QLD 4215
P (07) 5552 1300 | W www.PalmLakeResort.com.au | W www.PalmLakeCare.com
Palmlake Works Pty Ltd trading as Palm Lake Works | ACN 095 986 119 | ABN 14 095 986 119

 

Used in these records

About this file

File size
4.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0 141219 RTCDA COOROY COVER LETTER.pdf · 4.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.