0 141219 Rtcda Cooroy Cover Letter · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (1 of 3) Cover letter and site, floor & elevation plans.

of 22

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

MG Palm Lake

aN Works Ww Mens Mense Ge Gere W@ re

Calibre Consulting recommend a Construction and Maintenance plan be prepared at operational works
phase for the Stormwater Management Devices, this will include an inspection and visual monitoring
program.

The revised Stormwater Quality Management Plan provided in Calibre Consulting Report No. B14158.W-01A
dated December 2014 has been provided to Best Management Practices and in accordance with all current
guidelines and legislations.

The relative small size of the development plan does not warrant water sampling and reports. A Stormwater
Management Construction and Maintenance Plan as will effectively indicate performance of the system.

Such a program would incur undue expenses to obtain sufficient data for statistical rigor and not compatible
with the benefits achieved.

CONDITION 73

Condition 73 of the Decision Notice reads as follows:
The site must be connected to Council’s existing sewerage reticulation system by gravity, and be constructed in

accordance with Councils standards and requirements at no cost to Council.

Proposed Change

It is proposed that condition 73 be amended as follows:

The site must be connected to Councils Unitywater’s existing sewerage reticulation system by
gravity, and be constructed in accordance with Couseils Unitywater’s standards and requirements
at no cost to Council or Unitywater. Sewer reticulation route subject to detailed investigations and

liaison with Unitywater.
Justification

Calibre Consulting has provided updated Sewerage Reticulation Layout Plans indicating two options for the
proposed development. Refer to Drawing No: B14158-SKO8 dated 19/12/2014.

The drawings provide two possible options for sewer connection. Once via gravity and the other via an
onsite pump station. Further liason with the service provider is recommended to prefer option of
connection. As such we request a modification to existing condition;

The site must be connected to Unitywater’s existing sewerage reticulation system, and be constructed in
accordance with Unitywater’s standards and requirements at no cost to Council or Unitywater. Sewer
reticulation route subject to detailed investigations and liaison with Unitywater.

CONDITION 74

Condition 74 of the Decision Notice reads as follows:

Page 19 of 22

Palm Lake Works | Southport Central Tower 3, 9 Lawson Street, Southport QLD 4215 | PO Box 10479, Southport BC QLD 4215
P (07) 5552 1300 | W www.PalmLakeResort.com.au | W www.PalmLakeCare.com
Palmlake Works Pty Ltd trading as Palm Lake Works | ACN 095 986 119 | ABN 14 095 986 119

 

Used in these records

About this file

File size
4.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0 141219 RTCDA COOROY COVER LETTER.pdf · 4.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.