Attached to the e-mail 132007.2398.02 Request to change existing approval (1 of 3) Cover letter and site, floor & elevation plans.
MG Palm Lake aN Works Ww Mens Mense Ge Gere W@ re Calibre Consulting recommend a Construction and Maintenance plan be prepared at operational works phase for the Stormwater Management Devices, this will include an inspection and visual monitoring program. The revised Stormwater Quality Management Plan provided in Calibre Consulting Report No. B14158.W-01A dated December 2014 has been provided to Best Management Practices and in accordance with all current guidelines and legislations. The relative small size of the development plan does not warrant water sampling and reports. A Stormwater Management Construction and Maintenance Plan as will effectively indicate performance of the system. Such a program would incur undue expenses to obtain sufficient data for statistical rigor and not compatible with the benefits achieved. CONDITION 73 Condition 73 of the Decision Notice reads as follows: The site must be connected to Council’s existing sewerage reticulation system by gravity, and be constructed in accordance with Councils standards and requirements at no cost to Council. Proposed Change It is proposed that condition 73 be amended as follows: The site must be connected to Councils Unitywater’s existing sewerage reticulation system by gravity, and be constructed in accordance with Couseils Unitywater’s standards and requirements at no cost to Council or Unitywater. Sewer reticulation route subject to detailed investigations and liaison with Unitywater. Justification Calibre Consulting has provided updated Sewerage Reticulation Layout Plans indicating two options for the proposed development. Refer to Drawing No: B14158-SKO8 dated 19/12/2014. The drawings provide two possible options for sewer connection. Once via gravity and the other via an onsite pump station. Further liason with the service provider is recommended to prefer option of connection. As such we request a modification to existing condition; The site must be connected to Unitywater’s existing sewerage reticulation system, and be constructed in accordance with Unitywater’s standards and requirements at no cost to Council or Unitywater. Sewer reticulation route subject to detailed investigations and liaison with Unitywater. CONDITION 74 Condition 74 of the Decision Notice reads as follows: Page 19 of 22 Palm Lake Works | Southport Central Tower 3, 9 Lawson Street, Southport QLD 4215 | PO Box 10479, Southport BC QLD 4215 P (07) 5552 1300 | W www.PalmLakeResort.com.au | W www.PalmLakeCare.com Palmlake Works Pty Ltd trading as Palm Lake Works | ACN 095 986 119 | ABN 14 095 986 119
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0 141219 RTCDA COOROY COVER LETTER.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.