Council archive · source document
0 141219 Rtcda Cooroy Cover Letter · 132007.2398
Attached to the e-mail 132007.2398.02 Request to change existing approval (1 of 3) Cover letter and site, floor & elevation plans.
& Palm Lake Works & Paimtake’ Ww ramiac ku ke Pam ke Group —Sert Proposed Change It is recommended that the condition to be amended to reference the updated report, as indicated below: Stormwater Quality Improvement Devices as detailed within the Concept Stormwater Quality Management Plan for Cooroy Retirement Community Trading Post Road, Cooroy prepared by Calibre Consulting No. 814158.W-01A dated December 2014 and any updates approved by Council shall be installed within the development to ensure compliance with the designated water quality objectives are achieved. Stormwater likely to contain grease and oil (i.e. from car parking areas) shall be managed via grease and oil arrestors prior to treatment within bioretention basins and wetlands if required. The revised Stormwater Quality Management Plan has been provided by Calibre Consulting in Report No.B14158.W-01A dated December 2014. Stormwater likely to contain grease and oil (i.e. from car parking areas) shall be identified during detailed design phase and shall be managed via grease and oil arrestors if required. CONDITION 72 Condition 72 of the Decision Notice reads as follows: Stormwater Monitoring and Maintenance Plan (SMMP) shall be prepared ensure stormwater treatment infrastructure is performing its intended purpose. The SMMP shall be approved by the Council’s CEO or delegated officer prior to issue of any Operational Works Approval. The SMMP shall specify: 72.1 performance indicators including water quality objectives; 72.2 monitoring schedule to ensure specified performance indicators are achieved; 72.3 maintenance schedule for all elements of the stormwater treatment train; 72.4 reporting requirements; 72.5 corrective actions for noncompliance with performance indicators; and 72.6 responsibility framework. Proposed Change It is recommended that the condition to be amended, as indicated below: A Stormwater Management Construction and Maintenance Plan (SMCMP) shall be prepared ensure stormwater treatment infrastructure is performing its intended purpose. The SMCMP shall be approved by the Council’s CEO or delegated officer prior to issue of any Operational Works Approval. The SMMP shall specify: 72.1 visual performance indicators 72.2 monitoring schedule to ensure specified performance indicators are achieved; 72.3 maintenance schedule for all elements of the stormwater treatment train; 72.4 reporting requirements; 72.5 corrective actions for noncompliance with performance indicators; and 72.6 responsibility framework. Page 18 of 22 Palm Lake Works | Southport Central Tower 3, 9 Lawson Street, Southport QLD 4215 | PO Box 10479, Southport BC QLD 4215 P (07) 5552 1300 | W www.PalmLakeResort.com.au | W www.PalmLakeCare.com Palmlake Works Pty Ltd trading as Palm Lake Works | ACN 095 986 119 | ABN 14 095 986 119 Works
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0 141219 RTCDA COOROY COVER LETTER.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.