0 141219 Rtcda Cooroy Cover Letter · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (1 of 3) Cover letter and site, floor & elevation plans.

of 22

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

& Palm Lake

Works & Paimtake’ Ww ramiac ku ke Pam ke

Group —Sert

Proposed Change

It is recommended that the condition to be amended to reference the updated report, as indicated below:

Stormwater Quality Improvement Devices as detailed within the Concept Stormwater Quality
Management Plan for Cooroy Retirement Community Trading Post Road, Cooroy prepared by Calibre
Consulting No. 814158.W-01A dated December 2014 and any updates approved by Council shall be
installed within the development to ensure compliance with the designated water quality objectives
are achieved. Stormwater likely to contain grease and oil (i.e. from car parking areas) shall be
managed via grease and oil arrestors prior to treatment within bioretention basins and wetlands if
required.

The revised Stormwater Quality Management Plan has been provided by Calibre Consulting in Report
No.B14158.W-01A dated December 2014.

Stormwater likely to contain grease and oil (i.e. from car parking areas) shall be identified during detailed
design phase and shall be managed via grease and oil arrestors if required.

CONDITION 72

Condition 72 of the Decision Notice reads as follows:
Stormwater Monitoring and Maintenance Plan (SMMP) shall be prepared ensure stormwater treatment
infrastructure is performing its intended purpose. The SMMP shall be approved by the Council’s CEO or
delegated officer prior to issue of any Operational Works Approval. The SMMP shall specify:
72.1 performance indicators including water quality objectives;
72.2 monitoring schedule to ensure specified performance indicators are achieved;
72.3 maintenance schedule for all elements of the stormwater treatment train;
72.4 reporting requirements;
72.5 corrective actions for noncompliance with performance indicators; and
72.6 responsibility framework.

Proposed Change

It is recommended that the condition to be amended, as indicated below:

A Stormwater Management Construction and Maintenance Plan (SMCMP) shall be prepared ensure
stormwater treatment infrastructure is performing its intended purpose. The SMCMP shall be
approved by the Council’s CEO or delegated officer prior to issue of any Operational Works Approval.
The SMMP shall specify:

72.1 visual performance indicators

72.2 monitoring schedule to ensure specified performance indicators are achieved;

72.3 maintenance schedule for all elements of the stormwater treatment train;

72.4 reporting requirements;

72.5 corrective actions for noncompliance with performance indicators; and

72.6 responsibility framework.

Page 18 of 22

Palm Lake Works | Southport Central Tower 3, 9 Lawson Street, Southport QLD 4215 | PO Box 10479, Southport BC QLD 4215
P (07) 5552 1300 | W www.PalmLakeResort.com.au | W www.PalmLakeCare.com
Palmlake Works Pty Ltd trading as Palm Lake Works | ACN 095 986 119 | ABN 14 095 986 119

 

Works

Used in these records

About this file

File size
4.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0 141219 RTCDA COOROY COVER LETTER.pdf · 4.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.