Council archive · source document
0 141219 Rtcda Cooroy Cover Letter · 132007.2398
Attached to the e-mail 132007.2398.02 Request to change existing approval (1 of 3) Cover letter and site, floor & elevation plans.
& Palm Lake WOKS & Palm Lake" MW Palm Lake Gow, Qos Group ~or © Person Road access: proposed access for the 120 bed facility only e Trading Post Road: proposed access for approximately 50% of all trips associated with the ILUs e Lamonts Road: proposed access for approximately 50% of all trips associated with the ILUs The key outcome from the assessment is that all movements and legs are forecast to Operate at a satisfactory Level of Service (LOS) of “C”. The worst 95m percentile queue length was 58m occurring on the through and right turn movement from the south approach on Elm Street. All of the traffic operations output parameters are well within the bounds of what are considered to be satisfactory operational conditions. It is considered that the proposed road network and road elements provide adequate access for refuse collection vehicles. On-site resident and visitor car parking is accommodated by the proposed design. An allowance of 1 resident vehicle is to be garaged within each allotment. The site also provides 41 visitor car parking spaces scattered across the retirement community (ILUs) development, which is equivalent to 1 visitor space per 4 ILU allotments as per previous development conditions for the site. The visitor car parking spaces are conveniently located within easy walking distance to all units. The aged care facility has a designated car park consisting of visitor and staff parking. Provision has been made for 24 visitor parks (at a rate of 1 visitor space per 5 aged care units) with the balance of car parks provided for employee parking. The provision and location of the car parking spaces are considered to provide good amenity at the site. The number of car parks for the Aged Care Facility is considered to be appropriate given the nature of the development. Based on the assessment of the network it is concluded that the majority of the road links and intersection arrangements as proposed will be able to accommodate the anticipated traffic volumes to at least the design year of 2028. The forecast demand estimates are based on the ultimate development scenario as outlined above. Please refer to Appendix | for the Traffic Impact Assessment prepared by Calibre Consulting for further details. 4.0 PROPOSED AMENDMENTS TO CONDITIONS OF APPROVAL In order to facilitate the proposed amendments to the development, the following amendments are requested to be made to the conditions of approval for the Material Change in Use —Retirement Village included as part of the Negotiated Decision Notice, issued 20 December 2011. Please refer to Attachment B for a copy of the Negotiated Decision Notice dated 20 December 2011. CONDITION 1 Condition 1 of the Decision Notice reads as follows: Development, including staging of the development, shall be undertaken in accordance with this approval and must generally comply with the approved plans of development. The approved plans are titled and numbered: - Page 7 of 22 Palm Lake Works | Southport Central Tower 3, 9 Lawson Street, Southport QLD 4215 | PO Box 10479, Southport BC QLD 4215 P (07) 5552 1300 | W www.PalmLakeResort.com.au | W www.PalmLakeCare.com Palmlake Works Pty Ltd trading as Palm Lake Works | ACN 095 986 119 | ABN 14 095 986 119
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0 141219 RTCDA COOROY COVER LETTER.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.