Council archive · source document
0 141219 Rtcda Cooroy Cover Letter · 132007.2398
Attached to the e-mail 132007.2398.02 Request to change existing approval (1 of 3) Cover letter and site, floor & elevation plans.
& Palm Lake Works Mors: Palm Lake Rew, & W Palin Lake’ Group Ser Stormwater A new Stormwater Quality Management Plan has been provided as part of this request to change the existing approval. The stormwater strategy remains relatively the same as the original strategy, however the deigns of the detention basins has slightly changed to reflect the new layout. Please refer to Appendix H for the updated Stormwater Management Plan prepared by Calibre Consulting. Sewer The subject site is within an area currently serviced by Council. Sewer servicing for the site can provided by two options: 1. The site will be serviced via a connection in Pearson Road. The 150mm diameter line runs along the northern side of Pearson Road and terminates on the eastern corner of the subject site; or 2. The site will be service via an onsite pump station and rising main to connection to existing sewer in Trading Post Road. The location of the connection point and connections options are provided in Calibre Consulting Drawing No. B14158-SKO7. Please refer to Appendix G for the Preliminary Engineering report and plans prepared by Calibre Consulting. Water Supply. Water reticulation for the site is a 150mm diameter main that terminates approximately 30 metres into Trading Post Road. The location of the connection points are shown on the attached Calibre Consulting Drawing No. B14158-SK08 & SKO9. Please refer to Appendix G for the Preliminary Engineering report and plans prepared by Calibre Consulting. Earthworks The earthworks will be limited to that required for roadworks, allotment access and the installation of services. The allotments will be left as close as possible to existing surface levels to preserve the existing vegetation and minimise disturbance to the site. Bulk earthworks plans are provided in Calibre Consulting Drawing No. B14158-SKO1 & SKO2. Please refer to Appendix G for the Preliminary Engineering report and plans prepared by Calibre Consulting. Landscaping The proposed amended site plan includes landscape buffer strips along all site boundaries. It is also noted that substantial conditions of approval relating to landscaping are included in the development approval. It is intended Palm Lake Works will comply with these conditions of approval post approval of this change. Please refer to Appendix C for the proposed site plan. Traffic There are three proposed accesses to the site, with development traffic proposed to access the site as follows: Page 6 of 22 Palm Lake Works | Southport Central Tower 3, 9 Lawson Street, Southport QLD 4215 | PO Box 10479, Southport BC QLD 4215 P (07) 5552 1300 | W www.PalmLakeResort.com.au | W www.PalmLakeCare.com Palmlake Works Pty Ltd trading as Palm Lake Works | ACN 095 986 119 | ABN 14 095 986 119 Works
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0 141219 RTCDA COOROY COVER LETTER.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.