Original source · versioned page text
RFI Eng response notice items 4-19 MCU150111
Attached to the e-mail MCU15/0111 Response to information request - 2-4 Lamonts Rd & 19 Trading Post Rd, Cooroy - email 1 of 2.
7 of 8 Item 15 Provide commentary to confirm that the Nodes proposed for the Bowling Green and Park will most adequately represent the nutrient fluxes from those uses. Our Response The proposed bowling green is to be constructed with synthetic grass and has a roof. For the purposes of the MUSIC model, the bowling green has been modelled as a roof. As per the Stormwater Construction Management and Maintenance Plan, it is advised that landscaping areas directly adjacent to the WQCP are not fertilized in order to minimise high nutrient runoff from entering the pond. Item 16 Detail Invert Levels for outlet structures of all water quality treatment devices, along with surrounding land surface levels to demonstrate that adequate fall is available for stormwater discharges. Our Response Invert levels have been added to the plans to show that there is adequate fall for all basin outlets. Refer attached Drawings B14158.W Sheet SK103 and SK104. Item 17 Demonstrate how the design of the bioretention basins, including location and heights of retaining walls is consistent with the recommendations of the Water by Design Bioretention Technical Design Guidelines for depth of filter media to surrounding areas and retaining wall heights. Our Response At the central bioretention basin the concept design plans for the site indicate a maximum wall height of 1.6m and 1.5m. This is considered to be reasonable for such developments. It is noted that the Water by Design Bioretention Design Guidelines recommend for wall heights exceeding 800mm that multiple walls be used with a 3m wide terrace in between the walls. It is suggested that this is an onerous requirement and not relevant where only one side of the bioretention basin is walled. Item 18 Provide commentary regarding the functional consistency between proposed weir width details shown on proposed detail design drawings and the MUSIC model weir width input data. Our Response The width of the weirs shown on plans are inconsistent with the MUSIC model. This issue has been corrected in MUSIC model and has little impact on the results. All objectives have been achieved. Item 19 Provide calculations in accordance with the Queensland Urban Drainage Manual to demonstrate that the confluence of stormwater at the drainage easement will not cause scour and that any required dissipater/erosion control can be contained wholly within the applicant’s property. Our Response We appreciate council’s concerns regarding scour protection. However it is possible that pipe network may change during the detailed design phase. As such we would suggest that detailed calculations are provided to demonstrate scour risk mitigation at the Operational Works phase. Please condition approval appropriately.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.