Original source · versioned page text
RFI - Ecological Assessment Report
The original of this document is very large (67.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 111, section 1. The text section number identifies this passage in the reader.
23. Construction signage, including that on hoardin~s and shade cloth but not inciuding statL1tory
safety signage, shall not exceed a total of 20rn~ for the site. rower cranes shall not includi~
advertising signage or unnecess~ry !ighting.
Bicycle Parking
24. Secure bicycle racks shall be provided on site to accommodate a rnlnimum of 28 bicycles.
The cycie parking rack is k:i be rnade available for customers and staff of the retail premises
at a!I tirnes during business hours
End--of-Trip Fa<:llities
End of tdp facilities shall be provided for staff and shall inc!wje:
a. a minirnum of eight (15) lockers; fmd
b. "' minimum of three maie and three female shower cubicles '.vith ancilla;y change
rooms.
Atemative Transport
26. A. shuttle bus with a minimum of 22 seats shai! be provided and operated in conjunction with
the resort to ferry guests to local destinations to minimise traffic impacts on the local area.
Details of the proposed operation shall be submitted for Council approval prior to the issue of
a Development Permit for Opemtlonal Works.
27. A. rninimum of 10 motor scooters shall be made available for use by resort guests, the
provision of which may be via a service agreement with a hire company
Energy & Water Efficiency
28. AH hot water systems installed shaH be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
29. All new kitchen, laund1y and bathroom fittings shall comply with the ,AAA. Water Conservation
Rating System as defined by the AS/NZS 6400 (Water Efficient Products • Rating and
Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), or
current equivalent standards as may app!y, with toilets to comply with the AAAA Water
Conse1vation Rating System. Al! new tap ware and shower rcises shall not exceed a
maximum fiow of 9 litres per min. Dishwashers and washing machines are excluded from
this requirement.
Community Management Statement Requirements
30. The Developer and all future owners of the site shall comply with the Environmental
Management Plan (EMP) for Settlers Cove Development :~3i ·18 DA and compliance with the
EMP shall be referenced in any community management statement over the site.
3·i The Fire Management Plan is to be implemented by the Developer and future owners of the
site and Is to be referenced in any community management statement.
Development Permits
32. The Developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.
Compliance Bond
33. Security in the form of a cash bond or trading bank guarantee for the sum of $100,000 must
be submitted to secure performance of a!I conditions of this approval prior to the issue of a
Development Permit for Operational Works. The cash bond or trading bank guarantee wm
be returned on performance of the conditions of approval less any costs incurred by Council
in respect of enforcing performance of this permit
Page 4 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.