Original PDF page 114, section 1. The text section number identifies this passage in the reader.

       washing machine cokl taps and toilet cisterns. J\ll ra.inwater tanks are to be designed and
       installed ln accordance witri the Queensland Development Code (QDC) current at the time ::if
       building approval, and shall be part of the piurobing application for approval. The k:.ication
       and capacity of the tanks :sha!i be cleariy shown on the plans submitted for Bu:1ding
       Works/Operational Works approval and any overflow shall be dlrected to the stormwatar
       drainage system.
58.    A storrnwater management plan and stormwater managament design must be swbmitted to
       Council for approval prior to obta!nlng a Development Permit for Operational Work;;. The
       stormwater management plan a~d stormwater management design rnust be prepared by a
       RPEQ, specialising in stormwater and water quality management incorpoiating the prindples
       of the relevant approved Management Plans as described in Decision Notice 23118 DA
       The stormwater management plan and stormwater management design must demonstrate
       water reuse strategies, lnfrastmcture capacity and effective treatr:1ent methodo!ogy. The
       use of rainwater harvesting tanks for irrigation purposes shall be incorporated in the overall
       design plans. The following Information is required to be submitted with the storm,vater
       management plan and stormwatc➔r mana9ement design submitted with the appi1cation for
       Operational Works Approval:
       a.   ,<'.\n Audit report which confirms that the stormwater design achieves ail criteria and
            actions specified in Elements D.1 of Settlers Cove Noosa Residential High Density
            Environmenta! Management Plan by wm111 dated 25 July 2007;
       b.   Confirmation from an RPEQ that the sites proposed stormvvater management measures
            wm provide for infiltration Into the sand subgrade without runoff for storms up to a 10
            ;1   ear Average Recurrence Interval;
       c.   The !ocatlon for any required oil and sediment traps; &
       d.   MUSIC model results that demonstrate that the site will achieve the pollutant reduction
            targets required by the Water Sensitive Urban Design Technical Design Guidelines and
            the following water quality criteria:
            L         Tota! nitrogen levels - 0.34 mg/l; &
            ii.       Total phosphorous levels -- 0.035 mg/i.
59.    All stormwater drainage shall be collected on site and discharged so there is no net increase
       in stormwater runoff from the site.
60.    To ensure that polluted run-off does not enter the water table, the adjoining waterways or
       Council's stormwater drainage system, stormwater run-off from the car parking areas and
       the driveways shall have the first flush {the first 12 mm of rainfall or hose-down} co!lected in
       a grease/oil arrestor/gross pollutant trap provided on site prior to being permitted to
       discharge into the larger drainage system.
       All other clean stormwater, such as roof water, can be collected on site and discharged
       through a single underground drain !ine directly into the existing drainage system, bypassing
       the grease/oil arrestor/gross pollutant trap.
       To this ehd, a detailed maintenance plan shall be prepared for the proposed grease/oil
       arrestors/gross pollutant trap, which shall be submitted to the Council for approval prior to
       obtaining a Development Permit for Operational Works.
       The approved maintenance pian shall be incorporated in the Community Management
       Scheme for the development and a copy of this shall be provided for Council's records prior
       to commencement of the approved Use.
61.   A Development Permit for Building Works shall D.91 be granted until a Development Permit for
      Operational Works has been issued in regard to the drainage schamie.
62.   All site stormwater drainage s~)ali be by means of a gravity system.

                                                                                            Page 7of13
Log in to download the original file

RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.