Original PDF page 115, section 1. The text section number identifies this passage in the reader.

63.   All stormvvater drainage lines including iater-allotment drainage shall be inspected by c!vsed
      circuit te!evislon {CCTV) prior to commencement of th1?! approved Use.
      CCTV inspection wm be carried out by Council's CCT\l contractor and arranged by Council
      fo!iowing satisfactory completion of construction works. Th,':! developer wi!I be responsible for
      the full cost of CCTV Inspection, including Emf addftlona1 inspection necessary following defect
      identification and rectification. This charge is payable prior to the Issue of Operational Works
      approval and will be determined on the unit rate basis current at the t!me of approval.
Sewer Mains I Town Water Supply
64.   Retic:u!eted water supply and se;,-ve,age must be provided to the d,~ve!oprnent.
      Constn.ict!cm aethtities must not impede the access of Sunshine Coast Water or Fire Brigade
      personnel to vita! lnffastructure (eg. valves. fire hydrants and sewer access chambers).
66.   The fire-fighting demand on Courn::il's water supply system from the development must not
      exceed 30 litres per second .
      .A sir.gie Council insta!!ed primary water meter must be provided immediately inside the
      property boundary. Additional water meters must be installed for each title of a community title
       or sub~iease schemEt Meters must be Courn::ll approved, insta!fed in accordance with Council
       requirements and remain accessible at ail times for reading and maintenanGe purposes.
68.   Buildings, basements and other structures rnust maintain a minimum clearance of ·1.5 metres
      from Council se·.ver mains, and 1.0 metres from sewer manhole chambers and inspection
      openings.
      Storm water retention systems, gross poilutant traps and bio-retentlon basins must maintain a
      minimum clearance of 1.5 metres from Councii water supply and sewerage infrastructure.
70.   Landscape planting within 1.5 metres of Council sewerage lnfrastmcture must be Council
      approved varieties and low growing when mature.
      The level of the existing sewer manholes must be adjusted to sult the proposed finfshed
      surface levels. VVork must be undertaken by Sun.shine Coast Water at the applicants cost.
72.   Landscape planting within 1.5 metres of Council sewerage infrastructure and 1.0 metres from
      water supply infrastructure must be Councli approved vari;:;ties and low giowing when mature.
73.   Construction works undertaken lr. the vicinity of Council water supply or sewerage
      infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
      with repair, replacement or alteration of infrastructure must be met by the appiicant.
Service Easemen~ (Sewer I Stormwater}
74    A 3.0 metre wide easement must be provided over al! Council sewers located in private
      property that are not covered by an existing easement. A 4.0 metre wide easement must be
      provided over Council sewers greater than 3.0 metres deep {where approved by Council).
      Easements must be located centrally over the main.
75.   A registered easement shall be created over any stormwater drainage pipes within the site that
      collect stormwater from a Council road or corwey stormwater from any adjoining property (for
      examp!e, where drainage pipes are provided within the site to prevent adjacent properties from
      additionai ponding/flooding due to the subject site being filled).
76.   No building or other structure shall be ccnstruc.1:ed or encroach into an easement
Con:l!Jtf·m::th:m Issues
77.   A Traffic Management Plan for the each construction phase of the development shall be
      submitted to and approved by Counc!! at least 5 working days prior to the commencement of
      any Buifdlng works or at least 5 working days prior to the pre-start meeting for Operational
      Works. The Traffic Management Plan shall be referred to the Divisional Councillor for
      comment before approval and shall Include but not be limited to:
                                                                                             Plilge 8of13
Log in to download the original file

RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.